Title Page
- Plant Room
-
Conducted on
-
Prepared by
-
Location
Safety
-
Was the Plant Room secured on arrival
-
Are you aware of your escape routes and fire exit locations
-
Have you got the correct tools to carry out the works safely and correctly
-
Are any Fire Extinguishers, First Aid Kits or Eye Washes on site in good order (where applicable)
Visual Inspection (Water Leakage/Gas Leakage)
-
Pipework & Valves
-
Pumps
-
Boilers & Heat Generating Equipment
-
Pressurisation Units/Degassers
-
Strainers
-
Filters (Xpots/Dirt Air Separator etc)
-
Risers/Laterals/Auto Air Vents/Balancing Valves Etc in any Block(s) served by Plant
-
Expansaion Vessel Charge checked
Visual Inspection (Damage and Abnormalities)
-
Pipework, Valves, Lagging, Fixings Etc
-
Pumps
-
Boilers and Heat Generating Equipment
-
Pressurisation Units/Degassers & Filling Loops/Quick Fills
-
Filters
-
Electrical System including BMS/Programmers, trunking, switches, Estops Etc
-
Plant Room including Door, Ventilators, Duct work Etc
-
Risers/Laterals/Auto Air Vents/Balancing Valves Etc in any Block(s) served by Plant
Testing of Apparatus & Plant (Including Test Running off any Plant in Standby Mode)
-
Tested Pumps
-
Tested Boilers & Heat Generating Equipment (For Operation only not Gas Safety Checking)
-
Tested Pressurisation Units/Degassers, Filling Loops, Quick Fills
-
Tested BMS/Electrical Switches/Programmers for correct operation
-
Tested all other equipment in the Plant Room
Maintenance Tasks
-
Cleaned Dirt Air Separators by flushing
-
Flushed Dead Legs to minimise Legionella Risk
-
Run all plant in standby mode to ensure working
-
Cleaning of Plant Room sweep out and clear rubbish etc
-
Exercised Valves on site to ensure free and working
-
Cleaned Strainers
-
Block Risers Strainer Cleaning & Valve Testing
-
Inhibitor Top Up/System Cleaned (if required)
Temperature & Pressure Recording
-
Primary Circuit System Pressure (BAR)
-
Secondary Circuit If Applicable (BAR)
-
Flow Temperature Exiting Plant Room Degrees C
-
Return Temperature Entering Plant Room Degrees C
Commercial Site
-
Are the pumps controlled?
-
Is the BMS working?
-
Is the plantroom clean from dust?
-
Is the ventilation up to spec?
-
Is there any mechanical ventilation?
-
Has a quarterly check been carried out?
-
Is plant equipment operating correctly?
-
Is the plantroom floor sealed?
-
Does the room require painting?
-
Are the boilers on 0-10 volts?
-
Are there strainers in the plant room?
-
Is the Emergency Lighting working/present?
-
Is there a cold water tap in plantroom?
-
Is there a CHP located on site?
-
Are the plantroom locks correct?
-
Is there a FB lock on Gas Meter door?
Completion
-
Add signature
-
Select date
Pictures
-
Boilers
-
Pumps
-
Control Panel
-
Defects