Title Page

    Plant Room
  • Conducted on

  • Prepared by

  • Location

Safety

  • Was the Plant Room secured on arrival

  • Are you aware of your escape routes and fire exit locations

  • Have you got the correct tools to carry out the works safely and correctly

  • Are any Fire Extinguishers, First Aid Kits or Eye Washes on site in good order (where applicable)

Visual Inspection (Water Leakage/Gas Leakage)

  • Pipework & Valves

  • Pumps

  • Boilers & Heat Generating Equipment

  • Pressurisation Units/Degassers

  • Strainers

  • Filters (Xpots/Dirt Air Separator etc)

  • Risers/Laterals/Auto Air Vents/Balancing Valves Etc in any Block(s) served by Plant

  • Expansaion Vessel Charge checked

Visual Inspection (Damage and Abnormalities)

  • Pipework, Valves, Lagging, Fixings Etc

  • Pumps

  • Boilers and Heat Generating Equipment

  • Pressurisation Units/Degassers & Filling Loops/Quick Fills

  • Filters

  • Electrical System including BMS/Programmers, trunking, switches, Estops Etc

  • Plant Room including Door, Ventilators, Duct work Etc

  • Risers/Laterals/Auto Air Vents/Balancing Valves Etc in any Block(s) served by Plant

Testing of Apparatus & Plant (Including Test Running off any Plant in Standby Mode)

  • Tested Pumps

  • Tested Boilers & Heat Generating Equipment (For Operation only not Gas Safety Checking)

  • Tested Pressurisation Units/Degassers, Filling Loops, Quick Fills

  • Tested BMS/Electrical Switches/Programmers for correct operation

  • Tested all other equipment in the Plant Room

Maintenance Tasks

  • Cleaned Dirt Air Separators by flushing

  • Flushed Dead Legs to minimise Legionella Risk

  • Run all plant in standby mode to ensure working

  • Cleaning of Plant Room sweep out and clear rubbish etc

  • Exercised Valves on site to ensure free and working

  • Cleaned Strainers

  • Block Risers Strainer Cleaning & Valve Testing

  • Inhibitor Top Up/System Cleaned (if required)

Temperature & Pressure Recording

  • Primary Circuit System Pressure (BAR)

  • Secondary Circuit If Applicable (BAR)

  • Flow Temperature Exiting Plant Room Degrees C

  • Return Temperature Entering Plant Room Degrees C

Commercial Site

  • Are the pumps controlled?

  • Is the BMS working?

  • Is the plantroom clean from dust?

  • Is the ventilation up to spec?

  • Is there any mechanical ventilation?

  • Has a quarterly check been carried out?

  • Is plant equipment operating correctly?

  • Is the plantroom floor sealed?

  • Does the room require painting?

  • Are the boilers on 0-10 volts?

  • Are there strainers in the plant room?

  • Is the Emergency Lighting working/present?

  • Is there a cold water tap in plantroom?

  • Is there a CHP located on site?

  • Are the plantroom locks correct?

  • Is there a FB lock on Gas Meter door?

Completion

  • Add signature

  • Select date

Pictures

  • Boilers

  • Pumps

  • Control Panel

  • Defects

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.