Information

  • Boral Job : Builder / Suburb / Job Number

  • BUILDER (Principle PCBU)

  • ADDRESS
  • Tile Profile

  • Tile Colour

  • Conducted on

  • Boral Supervisor

PRE-INSPECTION (Supervisor Checklist)

  • Conducted on:

  • Supervisor:

  • Is there room for tiles

  • Does the job have a compliant edge protection / scaffolding installed where required

  • ***** If 'NO' what is the booking date for the edge protections / scaffolding?

  • Are the appropriate props used to support any areas where permanant roof support structure is incomplete?

  • Does the house have eaves?

  • Is the fascia and gutter on?

  • Are the valley irons installed?

  • Are the box gutters installed?

  • Are the creeper rafters in?

  • Is the stair void covered?

  • Is there a toilet on site?

  • Is the housekeeping of the site and inside the building acceptable?

  • Is there power on site?

  • Is there security fencing on site, and are the gates open for access?

  • Is there a bin on site for waste?

  • Is there adequate parking?

  • Additional Comments:

  • READY?

  • If 'READY' what is the start date:

  • NUMBER OF TRIPS TO SITE BEFORE READY?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.