Title Page
-
1 Broadgate
-
Conducted on
-
Prepared by
-
Location
-
Drawing Number
-
Level & Area
-
Installers Name
-
Wall type
1.0 Pre-commencement check
-
date
-
Pre commencement checked by
-
Has the specification Been finalised? have all relevant RFI been answered?
-
Have Benchmark areas clear, accessible & unobstructed? Are exclusion zone agreed?
-
Have the correct materials and plant been loaded out at the work area?
-
Are Materials (plasterboard, metal sections, accessories, plaster) stored in dry conditions?
-
are primers and ready-mixed materials protected from freezing conditions?
-
Has the setting out been agreed, and are gridlines and datums established. ?
-
Have all lasers got a calibration certificate. (copy to be issued to office.)
-
Has the builders' works information been received?
-
Has M & E sequencing been co-ordinated, & void closure handover received.?
-
Have BPC received the current, approved layout drawings?
-
Have BPC received, Full, co-ordinated & Dated trade handover?
7.0 Tape & jointing Finish
-
Date
-
Works installed by.
-
Is the area clear, accessible & unobstructed? are exclusion zones agreed.?
-
Are site lighting levels adequate for a satisfactory inspection?
-
has a benchmark area been agreed, in-situ, and approved by the main contractor?
-
are site conditions suitable for the application of finishes-humidity, temperature, etc..?
-
has the paper/scrim tape been correctly applied and bedded in.?
-
have any excess fillers been removed to leave surfaces mostly flat.?
-
Has sufficient drying time(min. 24 hours), given between coats.?
-
Are all beads covered.?
-
Are all screw heads covered.?
-
Has light sanding been completed, leaving no edges.?
-
have any minor imperfections been filled.?
-
does the final jointed coat, feather out beyond the first application.?
-
Has final sanding been completed to leave a smooth continuous surface.?
-
have all trims/shadow gaps been cleaned out. ?
-
if required, has drywall primer or sealer been applied, prior to handover following trades, for decoration.?
-
does the finish meet the standard agreed at benchmark.?
-
is protection required to salient angles.?
7.0 Tape & jointing Finish
-
Date
8.0 Completion and handover
-
date
-
Handover completed by (BPC manager/supervisor)
-
Has the works been adequately protected on completion of installation.?
-
Have works been snagged and recorded correctly.?
-
Have all snags been cleared and signed of by both BPC and the client. ?
-
Have works been handed over to the client and accepted.?
6.0 Beads & Edge/reveal trims & skirting
-
Date
-
works installed by
-
Have the beads or trims been checked against the specification, are they correct.?
-
Are any shadow gaps at a constant width.?
-
Are all trims Plumb, level, and straight.?
-
Are all mitres neat and tight fitting, with no lipping.?
-
Are all screw heads sufficiently recessed into leg of trim. ?
2.0 Installation
-
Date
-
Work installed by
-
Have any substrate coatings (Gyproc sound coat plus, ThistleBond-it) been applied, if required.?
-
Have BG Dri-Wall adhesive "dabs" been applied to the back ground substrate, at the correct centres, including horizontal "dabs" at the top & bottom edges of the Board?
-
Have boards been tapped back firmly onto adhesive "dabs" with straight edge, are they aligned with ceiling and floor setting out lines?
-
At external angles, have all cut edges to boards been place inside the corners.?
3.0 First fix framework
-
Date
-
Work installed by
-
Has wall been set out correctly of gridline
-
Have the correct, approved fixings been used to secure tracks, channels & brackets to the structure?
-
Have the correct size & gauge of channels & studs been used, ( check against specification) Gypliner?
-
Are the stud centres correct and as per the specification, taking into account any localised variation to areas such as ceramic/wall tiling, or specific loadings. ?
-
For Gypliner universal installations, have the GL8 track been fixed with the longer leg facing into the room ?
-
For Gypliner universal installations, have the GL2/GL9 brackets been installed at the correct centres (800mm vertically).?
-
Where a deflection head is required, has BG fire strip & sealant been installed.?
-
Where a deflection head is required, have the studs been cut short of the soffit.?
-
Where deflection head is required, ensure there are no fixings connecting the studs to the head track Junction. ?
-
Where a deflection head is required, has BG GFS1 fixing strap been used to maintain 300mm fixing centres.?
-
Where a deflection head is required has a dropped soffit been formed, to Maintain a minimum 5mm overlap on the face of the board. ?
-
Has the correct splicing detail been used, where studs are extended (overlap by 600mm). ?
-
Have door weights been confirmed. ?
-
Have correct door timber been installed. (check specification). ?
-
Where required, have the correct service support pattress been installed.?
-
Where required, have all openings been formed correctly.?
-
Have all Junctions, internal & external corners, service penetrations etc.., been sealed with BG sealant.
-
Has low level taping be applied were future raised access flooring will be installed. ?
First fix completion handover issued
-
Date
-
Handover completed by (BPC Manager/supervisor)
4.0 Pre second fix & Service checks
-
Date
-
Work installed by
-
Has Void closure been received. ?
-
Have we received the service containment handover documents. ?
-
Have the correct materials and plant been loaded out at the work areas.?
-
Has insulation installation been completed.?
-
If required, are any timber noggins/Pattresses Installed.
5.0 Second fix boarding & closing up
-
Date
-
Works installed by
-
If carried out during the closing up stage, has the correct insulation been installed. ?
-
Are the screw centres at a maximum of 300mm centres, and 200mm at external corners.?
-
Where the specification is for a single layer of board has a BG GFS1 fixing strap been used at horizontal board junctions. ?
-
Where the specification is for a double layer of board, has a BG GFS1 fixing strap been used at the horizontal board junctions. ?
-
Where the specification is for a double layer of board, are the Joints staggered by 600mm.?
-
Have 2no 50mm wide strips of 30mm Glasroc F firecase suitably fixed through to the soffit using fire resistant fixing @ 600mm centres been installed either side of the partition. ?
-
Are the walls Square and plumb, are they within tolerance of +-3mm. ?
-
If required, are any structural or service openings correct and within Tolerance.?
-
Handover completed by (BPC Manager/supervisor).
Second fix completion handover Issued.
-
Date
-
Handover completed by (BPC Manager/supervisor)