Title Page

  • Site

  • Conducted on

  • Prepared by

  • Location
  • Drawing Number

  • Area

  • Level

  • Installers Name

  • Wall type

1.0 Pre-commencement check

  • Date

  • Pre commencement checked by

  • Has the specification Been finalised? have all relevant RFI been answered?

  • Have Benchmark areas clear, accessible & unobstructed? Are exclusion zone agreed?

  • Have the correct materials and plant been loaded out at the work area?

  • Are Materials (plasterboard, metal sections, accessories, plaster) stored in dry conditions?

  • are primers and ready-mixed materials protected from freezing conditions?

  • Has the setting out been agreed, and are gridlines and datums established?

  • Have all lasers got a calibration certificate. (copy to be issued to office.)

  • Has the builders' works information been received?

  • Has M & E sequencing been co-ordinated, & void closure handover received.?

  • Have BPC received the current, approved layout drawings?

  • Have BPC received, Full, co-ordinated & Dated trade handover?

2.0 Installation

  • Date

  • Work installed by

  • Have any substrate coatings (Gyproc sound coat plus, ThistleBond-it) been applied, if required.?

  • Have BG Dri-Wall adhesive "dabs" been applied to the back ground substrate, at the correct centres, including horizontal "dabs" at the top & bottom edges of the Board?

  • Have boards been tapped back firmly onto adhesive "dabs" with straight edge, are they aligned with ceiling and floor setting out lines?

  • At external angles, have all cut edges to boards been place inside the corners?

3.0 First fix framework

  • Date

  • Work installed by

  • Has wall been set out correctly of gridline

  • Have the correct, approved fixings been used to secure tracks, channels & brackets to the structure?

  • Have the correct size & gauge of channels & studs been used, ( check against specification) Gypliner?

  • Are the stud centres correct and as per the specification, taking into account any localised variation to areas such as ceramic/wall tiling, or specific loadings?

  • For Gypliner universal installations, have the GL8 track been fixed with the longer leg facing into the room ?

  • For Gypliner universal installations, have the GL2/GL9 brackets been installed at the correct centres (800mm vertically)?

  • Where a deflection head is required, has BG fire strip & sealant been installed?

  • Where a deflection head is required, have the studs been cut short of the soffit?

  • Where deflection head is required, ensure there are no fixings connecting the studs to the head track Junction?

  • Where a deflection head is required, has BG GFS1 fixing strap been used to maintain 300mm fixing centres?

  • Where a deflection head is required has a dropped soffit been formed, to Maintain a minimum 5mm overlap on the face of the board?

  • Has the correct splicing detail been used, where studs are extended (overlap by 600mm)?

  • Have door weights been confirmed?

  • Have correct door timber been installed. (check specification)?

  • Where required, have the correct service support pattress been installed?

  • Where required, have all openings been formed correctly?

  • Have all Junctions, internal & external corners, service penetrations etc.., been sealed with BG sealant?

  • Has low level taping be applied were future raised access flooring will be installed?

  • Location Evidence
  • Room/Area Number

First fix completion handover issued

  • Date

  • Handover completed by (BPC Manager/supervisor)

  • Main Contractors/Client Signature
  • Date

  • Sign by

4.0 Pre second fix & Service checks

  • Date

  • Work installed by

  • Has Void closure been received?

  • Have we received the service containment handover documents?

  • Have the correct materials and plant been loaded out at the work areas?

  • Has insulation installation been completed?

  • If required, are any timber noggins/Pattresses Installed.

Pre-Second Fix Handover Issued

  • Date

  • Checked by (BPC Manager/Supervisor)

5.0 Second fix boarding & closing up

  • Date

  • Works installed by

  • If carried out during the closing up stage, has the correct insulation been installed?

  • Are the screw centres at a maximum of 300mm centres, and 200mm at external corners?

  • Where the specification is for a single layer of board has a BG GFS1 fixing strap been used at horizontal board junctions?

  • Where the specification is for a double layer of board, has a BG GFS1 fixing strap been used at the horizontal board junctions?

  • Where the specification is for a double layer of board, are the Joints staggered by 600mm?

  • Have 2no 50mm wide strips of 30mm Glasroc F firecase suitably fixed through to the soffit using fire resistant fixing @ 600mm centres been installed either side of the partition?

  • Are the walls Square and plumb, are they within tolerance of +-3mm?

  • If required, are any structural or service openings correct and within Tolerance?

  • Location Evidence
  • Room/Area Number

Second fix completion handover Issued.

  • Date

  • Handover completed by (BPC Manager/supervisor)

  • Main Contractor/Client Signature
  • Date

  • Sign by

6.0 Beads & Edge/reveal trims & skirting

  • Date

  • works installed by

  • Have the beads or trims been checked against the specification, are they correct?

  • Are any shadow gaps at a constant width?

  • Are all trims Plumb, level, and straight?

  • Are all mitres neat and tight fitting, with no lipping?

  • Are all screw heads sufficiently recessed into leg of trim?

  • Location Evidence
  • Room/Area Number

7.0 Tape & jointing Finish

  • Date

  • Works installed by

  • Is the area clear, accessible & unobstructed? are exclusion zones agreed?

  • Are site lighting levels adequate for a satisfactory inspection?

  • Has a benchmark area been agreed, in-situ, and approved by the main contractor?

  • Are site conditions suitable for the application of finishes-humidity, temperature, etc..?

  • As the paper/scrim tape been correctly applied and bedded in?

  • Have any excess fillers been removed to leave surfaces mostly flat?

  • Has sufficient drying time(min. 24 hours), given between coats?

  • Are all beads covered?

  • Are all screw heads covered?

  • Has light sanding been completed, leaving no edges?

  • Have any minor imperfections been filled?

  • Does the final jointed coat, feather out beyond the first application?

  • Has final sanding been completed to leave a smooth continuous surface?

  • Have all trims/shadow gaps been cleaned out?

  • If required, has drywall primer or sealer been applied, prior to handover following trades, for decoration?

  • Does the finish meet the standard agreed at benchmark?

  • Is protection required to salient angles?

  • Location Evidence
  • Room/Area Number

8.0 Completion and handover

  • date

  • Handover completed by (BPC manager/supervisor)

  • Has the works been adequately protected on completion of installation?

  • Have works been snagged and recorded correctly?

  • Have all snags been cleared and signed of by both BPC and the client?

  • Have works been handed over to the client and accepted?

  • Main Contractor/Client Signature
  • Date

  • Sign by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.