Title Page

  • Site conducted

  • Conducted on:

  • Site:

  • BPX REP. On Site:

  • Contractor Preforming Work:

  • Location
  • Is contractor aware of the process for control of work when working under BPX Power Infrastructure team?

  • Is all employees aware they have stop work authority?

  • Is contractor aware of BPX rules and procedures?

  • Has the SSSP been turned in before the start of the project?

  • Did the SSSP get review with contractor before starting construction? Add any corrective actions to SSSP if any.

  • Did all crew members go through orientation before being allowed to start work on BPX property?

  • Was the pre construction meeting conducted with crew to discuss any potential hazards? Who all was part of the pre construction meeting?

  • Fill in any extra information discussed with contractor

  • Has a walk down of the job site been conducted before starting the project?

  • Hazards identified during walk down of job site have been discussed with contractor? List all existing hazards.

  • Method of hazard mitigation has been discussed with contractor during walk down of job site? List methods of mitigation.

  • Will any high risk activity be taking place during the duration of the project? If yes has the hazards for that high risk activities been discussed?

  • Will this new facility be tying in to an already exciting facilities? If applicable.

Siginature Page

  • BPX Rep:

  • Person in charge/ compentent person:

  • BPX superintendent on location.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.