Title Page
-
Machine number
- SW4
- HQ1
- HQ3
- HQ9
- HQ7
- HQ8
- HQ22
- HQ10
- HQ11
- HQ12
-
Conducted on
-
Prepared by
Breakdown report - Shift repair.
-
Does the line required an LD purge or purge to shutdown to repair the fault?
-
Purge the line as required and remove all scrap before handing to the Engineer.
-
Can the fault be repaired on shift?
-
Provide a report, including any photos and videos on page 2, and escalate via email to Engineering and Production Manager.
-
Area of breakdown
- Winder
- Die
- Extruders
- Blenders
- Vac system
- Control panel
- Treater
- Draw unit/winder nip
- Web guide
- Web path rollers
- Sizing cage
- A frame
- Bubble cuddlers
- Haul off
- Pipework
-
Description of fault.
-
Root cause of fault.
-
Corrective action/repair of fault.
-
have any parts been replaced?
-
List part number and take photo of the part and part number.
-
Does the part require reorder?
-
Confirm repair has cleared the fault and hand back to the extrusion team.
Engineer - I confirm fault has been repaired and handed back to Extrusion team.
-
Add signature
-
Select date
Team Leader/Shift Manager - I confirm the unit has been handed back and fault repaired.
-
Add signature
-
Select date
Breakdown report - escalted
-
Provide details of fault (text and media) and any attempted repair.