Title Page

  • Machine number

  • Conducted on

  • Prepared by

Breakdown report - Shift repair.

  • Does the line required an LD purge or purge to shutdown to repair the fault?

  • Purge the line as required and remove all scrap before handing to the Engineer.

  • Can the fault be repaired on shift?

  • Provide a report, including any photos and videos on page 2, and escalate via email to Engineering and Production Manager.

  • Area of breakdown

  • Description of fault.

  • Root cause of fault.

  • Corrective action/repair of fault.

  • have any parts been replaced?

  • List part number and take photo of the part and part number.

  • Does the part require reorder?

  • Confirm repair has cleared the fault and hand back to the extrusion team.

Engineer - I confirm fault has been repaired and handed back to Extrusion team.

  • Add signature

  • Select date

Team Leader/Shift Manager - I confirm the unit has been handed back and fault repaired.

  • Add signature

  • Select date

Breakdown report - escalted

  • Provide details of fault (text and media) and any attempted repair.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.