Information

  • Audit Title

  • Conducted on

  • Prepared by

General Information

  • Safety Engineer/Supervisor:

  • Select date

  • Shift:

  • Weather:

  • Contract/Title: A-36193 Brick Arch Repairs at 168th and 181st St. Stations

  • General Order

Sub-contractors (check subs working on site)

  • Admiral Construction

  • Future Tech Consultants

  • Gayron de Bruin

  • Carnak

  • Five Star Electric

  • Walsh Electric

  • Forsythe Plumbing

  • Garden State Surveying

  • J-Track, LLC

  • L&L Painting

  • MT Group

  • Risa Management Corp.

  • Safway Atlantic

  • Seiko / Lago Ironworks

  • Suburban Pest Control

  • Wang Engineering

Contract Work Locations (Check off areas working today)

  • 157th Street

  • 168th St. Station

  • 168th St. Mezzanine / Other

  • 181st Street

  • Train Yard (specify yard)

Safety Visits/Inspections/Activities

  • OCIP or CPM Safety Visit?

  • Regulatory Agency?

  • OSHA, DOB, FDNY, Other

  • Scaffold inspections

  • Fire Extinguishers inspected?

  • General safety

  • Public safety / Platforms / Mezzanine

  • Safety meeting (meeting minutes must be forwarded to CM's office within 3 business days).

  • Other safety issues?

  • Additional safety issues?

  • Additional safety issues?

Accidents/Injuries

  • Were there any reported accidents?

Safety Engineer's signature

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.