Brick Inspection

  • Is brick inspection conducted for dwelling?

  • Note: For single dwellings complete Ground Floor internal/external only.

General

  • 1.01 Is site fencing intact? (No Damage)

  • 1.02 Is gate locked?

  • 1.03 All rubbish in designated area?

  • 1.04 Has all left over material been stacked neatly?

  • 1.05 Are boundary fences free of mortar splash?

  • 1.06 Have all leftover bricks and clutter been removed from scaffold?

Ground Floor External

  • 2.01 Is all brickwork complete?

  • 2.02 Are all sills adequately complete to windows and sliding doors?

  • 2.03 Has hot water system box been tied into brickwork?

  • 2.04 Is all brickwork less than 15mm overhang off concrete slab rebate?

  • 2.05 Are all weep holes free from mortar?

  • 2.06 Are base bed joints within 30mm tolerance?

  • 2.07 Is all brickwork plumb and straight?

  • 2.08 Are all joints and perps of uniform thickness?

  • 2.09 Has all hoop irons been installed?

  • 2.10 Are all rubber seals covering gaps between window and brick sills?

  • 2.11 Are ALL bricks laid level? (Any crooked brickwork should be photographed and noted)

  • 2.12 Have all profile holes been filled and pointed?

  • 2.13 Are perps to internal corners uniform and plumb?

  • 2.14 Is brickwork free of excessive chips?

  • 2.15 Are all mortar joints uniformly finished?

  • 2.16 Have all lead flashings been installed correctly?(applicable to single storey only)

Ground Floor Internal

  • 2.01 Are glass panels free of scratches?

  • 2.02 Are aluminum frames free of scratches/dents?

  • 2.03 Are sliding door tracks free of scratches dents?

  • 2.04 Are all cavities and noggins clean and free of mortar droppings?

  • 2.05 Are windows and doors free of mortar splash?

  • 2.06 Have adequate ties been installed?

  • 2.07 Are all cavities within the minimum 25mm tolerance?

  • 2.08 Have all lead flashings been installed correctly?(applicable to single storey only)

  • 2.09 Has slab been swept and any bracing timber been stacked neatly?

First Floor External

  • 2.01 Is all brickwork complete?

  • 2.02 Are all sills adequately complete to windows and sliding doors?

  • 2.03 Have all Parapet walls been finished with a header course?

  • 2.04 Is all brickwork less than 15mm overhang off concrete slab rebate?

  • 2.05 Are all weep holes free from mortar?

  • 2.06 Is all brickwork plumb and straight?

  • 2.07 Are all joints and perps of uniform thickness?

  • 2.08 Are all rubber seals covering gaps between window and brick sills?

  • 2.09 Are ALL bricks laid level? (Any crooked brickwork should be photographed and noted)

  • 2.10 Have all profile holes been pointed?

  • 2.11 Are perps to internal corners uniform and plumb?

  • 2.12 Is brickwork free of excessive chips?

  • 2.13 Is all mortar joints uniformly finished?

  • 2.17 Have all lead flashings been installed correctly?

First floor internal

  • 2.01 Are glass panels free of scratches?

  • 2.02 Are aluminum frames free of scratches/dents?

  • 2.03 Are sliding door tracks to balconies free of scratches dents?

  • 2.04 Are all cavities and noggins clean and free of mortar droppings?

  • 2.05 Are windows and doors free of mortar splash?

  • 2.06 Have adequate ties been installed?

  • 2.07 Are all cavities within the minimum 25mm tolerance?

  • 2.08 Have all lead flashings been installed correctly?

  • 2.09 Has Flooring been swept and bracing timbers stacked neatly?

Comments

  • 2.20 In your opinion, has work been completed in a clean and proficient manner?

  • Please add any additional information/comments

  • Supervisor Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.