Information
-
Job No
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
1. Working at Heights
-
1.1. Fall risks of 2m or more? (including voids, pits, and trenches)
-
1.2. Lack of edge protection?
-
1.3. Unsafe or incomplete edge protection?
2. Plant and Equipment
-
2.1. Unsafe or damaged plant/equipment? (including missing or damaged guards)
-
2.2. Incorrect plant /equipment for job? (e.g. grinding discs for cutting)
-
2.3. Unsafe or incompatible attachments used with plant/equipment?
-
2.4. Lack of safe work instructions?
-
2.5. Lack of inspection regime?
3. Scaffolds
-
3.1. Unsafe or incomplete scaffold?
-
3.2. Lack of inspection protocol for scaffold?
-
3.3. Safe Work Load (SWL) exceeded? (tools, stored materials, number of persons)
4. Hazardous Manual Tasks
-
4.1. Lack of identification hazardous manual tasks?
-
4.2. Lack of assessment of hazardous manual tasks?
-
4.3. Inadequate risk controls? (examples: no job rotation, lighter loads, trolleys, lifting equipment, etc)
-
4.4. Lack of training in risk controls and safe lifting/ team lifting techniques?
5. Hazardous Chemical (including fuel and oil)
-
5.1.Unsafe storage location? (e.g. flammables near ignition sources, spills could enter stormwater drains, etc)
-
5.3. Inadequate spill containment equipment?
-
5.4. Lack of emergency procedures for injury/spills/fire etc?
-
5.5. Insufficient ventilation?
-
5.6. Insufficient, or incorrect, PPE?
6. Emergency Response
-
6.1. Lack of, or no emergency plans for site?
-
6.2. Emergency procedures not displayed at site?
-
6.3. Lack of training and rehearsal of emergency plans?
-
6.4. Lack of, or inadequate first aid kits aid equipment for site?
7. Traffic Management
-
7.1. Lack of, or inadequate, Traffic Management Plan (TMP) in place?
-
7.2. Inadequate controls for TMP? (physical barriers, bollards, speed limits, flashing lights, spotters, etc)
8. Access & Egress
-
8.1. Adequate access & egress onto site and to the workplace
-
8.2. Unobstructed exit routes by materials or works being undertaken
9. Personal Protective Equipment (PPE)
-
9.1. Lack of system to issue, inspect, replace and monitor PPE?
-
9.2. Lack of suitable PPE being used for a particular task
-
9.3. PPE being worn in accordance with task identified in Method Statement?
10. Work Environment
-
10.1. Lack of/or inadequate amenities? (toilets, wash areas, lunch rooms, etc)
-
10.2. Insufficient lighting?
-
10.3. Inadequate housekeeping?
-
10.4. Lack of, or inadequate noise/ vibration control?
11. Electrical Hazards
-
11.1 Unsafe electrical leads? (damaged, out of test date or untested)
-
11.2. Overloading outlets?
-
11.3. Electrical equipment near flammables?
12. Environmental Hazards
-
12.1. Lack of/or inadequate Environmental Management plan (EMP)?
-
12.2. Lack of/or inadequate, dust suppression system?
-
12.3. Lack of/or inadequate systems to prevent contaminants entering stormwater drains?
13. Administrative Procedures
-
13.1. Weekly toolbox talks completed and signed
-
List of tool boxes talks been given
-
13.2. Daily activity briefing completed and signed
-
13.3. Weekly plant register and tower inspection completed and signed
-
13.4. Have all new starters been inducted
-
13.5. Have all new starters read, understood and signed the copy of the specific MSRA
-
13.6. Is there a copy of all B&C operatives CSCS cards in the site file
14. Accidents, Incidents & Near Miss reporting
-
14.1. Has there been any Accidents, Incidents or Near Misses, reported since the last Inspection?
-
14.2. Have all accidents been recorded in the accident book
-
14.3. Have all incidents and near miss reports been completed and sent to the H&S dept
Site issues
-
Add media
Corrective Actions
-
Enter any corrective actions that will be undertaken
Sign Off
-
On site representative
-
Auditor's signature