Title Page

  • Conducted on

  • Prepared by

  • Location
  • Venue Name

  • Venue WiFi Site code

  • Venue post code

  • Name of staff member on site

Sign in

  • Permission to carry out survey obtained from staff member.

Survey

  • Is there adequate power at the router position? (reqs a minimum of 5 outlets)

  • Photograph of proposed router location

  • Description of proposed router location.

  • CABLE TO AP
  • Photograph of suggested AP location

  • Description of AP location, i.e. Gym, Cafe, Spa

  • Cable length back to router in mtrs

  • Photograph of cable route

  • Description of cable route. Include any risers, containment etc

Sign off

  • Cable route to all new AP positions completed and all positions identified and labelled?

  • Describe why survey unsuccessful?

  • Will a revisit/further survey be required?

  • Reason for revisit

  • SCCI informed revisit required?

  • Customer rating of installation, 1-5 with 1 being poor and 5 being excellent

  • Customer Comments

  • Customer name and signature

  • Survey completed date

  • Engineer completing

  • Engineer Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.