Information
-
Client Name
-
Project Name
-
Conducted on
-
Prepared by
-
Supervisor in charge of the project.
-
Other operatives on site
-
Location
Site office
-
Sign In Book
-
Is there an F10/NI10 displayed on site with the correct details?
-
Fire & Emergency Procedures relevant and up to date.
-
Are work permits issued, signed to open and close works
-
Plant Inspection Records
-
Risk Assessments & Method Statements
-
First Aid provisions
-
Toolbox Talks
Onsite Audit
Footpaths
-
Is there a clear walkway from gate to office
-
Do footpaths take operatives to all active work areas on site
-
Is there clear legible signage.
-
Traffic Management Plan
-
Temporary Works
-
Fire Extinguishers / Horn
-
Housekeeping (general site cleanliness)
-
Parking
-
PPE
- Most of the workforce missing PPE
- More than half missing some PPE
- At least 1 operative missing PPE
- All operatives wearing full PPE
- N/A
-
Security
-
Signage
-
Site Fencing / Hording
-
Storage
-
Vehicle / Pedestrian Segregation provided to all sections of the project site?
-
Suitable welfare facilities provided in line with Construction (Design and Management) Regulations 2015.
Specific Activities being Undertaken
-
Plant and Machinery on site.
-
Are operatives suitably qualified to the the specific item of machinery. (A physical check of cards or online database to check validity)
-
Are daily plant checks being caried out?
-
Is all plant and machinery kept in a clean and serviceable condition.
- Yes.
- Yes, required alterations or improvements
- No
- N/A
-
Are LOLER certs available and up to date?
-
Roads, Sewers and drainage.
-
Is there a valid signed dig permit
-
Are all excavations properly shored/ battered or is there Proper trench support in place.
-
Is there an exclusion zone around the excavation to stop the movement of plant or the possibility of materials being dropped into the excavation?
- Yes.
- Yes, required alterations or improvements
- No
- N/A
-
Is there suitable edge protection around the excavation.
-
Has the area undergone a survey for underground services using an eCAT 4+ or above?
-
CAT serial number
-
Maximum intended Dig depth
-
Do any open excavations require confined space considerations? (A confined space can be any space of an enclosed nature where there is a risk of death or serious injury from hazardous substances or dangerous conditions (e.g. lack of oxygen))
-
Are all operatives involved suitably qualified and competent
-
Is there a robust escape plan in place.
-
Is all escape equipment in place and ready for use if needed.
-
Is there a working and calibrated gas detector in the excavation.
-
Gas Detector serial number
-
Concreting activities.
-
specific concreting task (i.e Footings, Slab etc)
-
Do operatives have suitable PPE to remove the possibility of concrete coming into contact with skin and eyes?
-
Concrete COSHH assessment available and read by operatives?
-
Bituminous works. (Asphalt installation)
-
Type of laying technique (Hand or machine)
-
Bituminous products COSHH assessment available and read by operatives?
-
Correct PPE worn to protect eyes and skin from coming into contact?
-
Instillation of Pre Cast Concrete (PCC) products
-
-
Working in live highway or footpath
-
what works are being carried out? (i.e flagging, kerbing, excavating, etc)
-
sufficient demarcation of works with chapter 8 barriers?
-
Traffic Management plan in place ?
-
Footings
-
Do operatives have safe access and egress in and out of the work area
-
Has the ground in the surrounding area been reduced to allow bricklaying works to commence
- Yes.
- Yes, required alterations or improvements
- No
- N/A
-
Housekeeping, is the area free from potential trip hazards
- Yes.
- Yes, required alterations or improvements
- No
- N/A
-
Are all Manual handling activities conducted safely, (could mechanical aids make work easier)
- Yes.
- Yes, required alterations or improvements
- No
- N/A
-
Is there a safe exclusion zone around the work area.
- Yes.
- Yes, required alterations or improvements
- No
- N/A
Confirmation
Additional Observations
-
undefined
Corrective Actions
-
Corrective Actions required
Sign Off
-
I confirm I have had the contents of this audit explained to me
-
All corrective actions must be signed off and dated once completed.