Good house keeping/general rubbish in bins provided and site rubbish disposed of (no off cuts on the ground)
-
Add media
-
Daily sign in register being used by all personnel DAILY
-
Add media
-
Pre-start meeting being conducted/attended daily by all (including any subcontractors) and signed by Crew Leader
-
Add media
-
Excavation Permit (on reverse of pre start meeting) is being competed for EACH excavator, and not just for the crew/site
-
Add media
-
All workers and subcontractors signed onto JSA's / SWMS prior to commencing work
-
Add media
-
JSA amended or changed to reflect the scope of works, different/new tasks which are not included in the document are assessed and managed, and all personnel re-signed on?
-
Add media
-
Required permits and licenses in place and copy on site/with each person (working near existing services plus personnel white cards/operator tickets etc)
-
Add media
-
All fire extinguishers inside 6 monthly test
-
Add media
-
First aid kit in company cars and fully stocked
-
Add media
-
Qualified first aid personnel on site
-
Add media
-
Plant and vehicle pre start sheets being completed
-
Add media
-
Plant and vehicle flashing lights operational
-
Add media
-
Plant reversing alarm working
-
Add media
-
Appropriate signs displayed i.e. construction signage, deep excavation , deep water
-
Add media
-
All existing services and assets protected? Both underground and overhead services protected, located, cable locates image on site, current one calls (Dial Before You Dig) on site, marker tape/colour etc used
-
Add media
-
Access/egress - ramp positioned no more than every 30m along the trench and angle not exceeding 45 degrees, or steps cut into the excavation every 30m
-
Add media
-
Excavation - <br>1. Bunting around excavations visible from a distance<br>2. Barrier around excavation work adjacent to schools and other public facilities/roads<br>3. Barrier around excavation that poses a fall hazard to workers and the public
-
Add media
-
Is there delineation between pedestrian and vehicle tracks/paths and excavation
-
Add media
-
Pedestrian and plant interface suitable? Plant exclusion zones being adhered to?
-
Add media
-
Excavated materials, plant and equipment / personnel set back 600mm from edge of excavation
-
Add media
-
Works undertaken on/or adjacent to public road have valid TMP
-
Add media
-
Hard temporary fencing has galv clamps, concrete feet, signage assembled and in appropriate order AND water filled barriers and cones suitable for specific road/footpath in immediate vicinity
-
Add media
-
Any risk of objects falling/collapsing on members of the public is managed
-
Add media
-
Any risk of trip hazards to the public is managed
-
Add media
-
Fall arrest kit being used or extension ladders with cones/barriers to form an exclusion zone around works deeper than 1.5m
-
Add media
-
Confined space and Work Safety at Heights training completed for personnel working with fall arrest kits
-
High vis clothing worn (no singlets)
-
Add media
-
Steel capped boots worn
-
Add media
-
Hard hats worn when required (when in the sling/slew zone of plant, when in excavation 1.5m or deeper, when slinging, when in rocky conditions, when in a trench box or when there is the potential for objects to fall). Or when client/main contractor requires.
-
Add media
-
Chains and slings tagged, tag is readable, and last test is within last 12 months. In good condition and fit for purpose
-
Add media
-
All electrical items tested and tagged quarterly (Dec-Feb = Red / Mar-May = Green / Jun-Aug = Blue / Sept-Nov = Yellow)
-
Add media
-
Comments or additional information / all main contractor or client specific tasks and requirements being met? (Working on verge, STAR cards etc..)
-
Add media
-
Add media
-
Corrective actions to be completed and actioned by -
-
Signature of HSE who conducted report
-