Information

  • Audit Title

  • Development / Subdivision

  • Lot Number(s)

  • Conducted on

  • Prepared by

  • Builder

  • Subcontractor

ROSSI Partnership Items

  • Housekeeping & Sanitation

  • Personal Protective Equipment

  • Respiratory Protection

  • Fire Protection & Flammable Liquids/Materials

  • Signs, Signals & Barricades

  • Walking & Working Surfaces/Slips/ Trips/Falls

  • Materials Handling, Storage, & Disposal

  • Hand, Power & Powder Actuated Tools

  • Welding, Cutting, Grinding, & Burning

  • Electrical, Wiring/Cords, Temporary Power

  • Ground Fault Circuit Interrupters (GFCI)

  • Control of Hazardous Energy (Lockout/Tagout)

  • Scaffolding

  • Aerial, Scissor & Boom Lifts

  • Ladders, Stairways, & Ramps

  • Fall Protection & Prevention

  • Fall Protection Plan

  • Cranes, Derricks & Hoists / Rigging

  • Motor Vehicles / Seat Belts

  • Heavy Equipment & Mechanized Equipment

  • Excavations, Trenching & Shoring

  • Confined Space Entry

  • Concrete & Masonry Construction

  • Steel Erection & Decking

  • Underground Construction/Tunneling

  • Demolition

  • Floor & Wall Openings

  • Traffic Controls & Flagging, High Visibility PPE

  • Hazard Communication/Safety Data Sheets (SDS)

  • Safety Plan/Job Hazard Analysis

  • Other:

  • Other:

  • Other:

  • Other:

  • Other:

Builders Bloc Specific

Carpentry (Builders Bloc Specific)

  • Is the binder with daily log of JSA – stretching, all hazards abated, fire extinguishers, etc. available?

  • Are ladders in good condition?

  • Review fall protection plan with crew – setting trusses from ladders, what the tie off plan on the roof is, etc. (The goal is to make sure everyone is thinking about what they are doing related to fall protection – approximately 5 minutes of training review).

  • Are all ramps are 20” wide into home and Controlled Access Zone (CAZ) lines marked no matter what height sub-floor is off ground?

  • Are all windows installed, or are rails installed prior to standing wall? Cattle guard over rear doors installed during framing?

Foundations (Builders Bloc Specific)

  • Are all form baskets in good order with safety chains working?

  • Are all whaler brackets bent over for no sharp edges?

  • Are form baskets slot and basket on perimeter on walls?

  • Ladder in use to enter or exit the hole?

Flatwork (Builders Bloc Specific)

  • Is inspection completed on truck/trailer – mirrors, lug nuts, tires, lights, etc?

  • Is there a fire extinguisher on truck?

  • Is the backup alarm/horn for the skid steer/bobcat in working order?

Drywall (Builders Bloc Specific)

  • Are all holes from HVAC openings covered?

  • Are guard rails at foyer/great room 3 rails tall when guys are on stilts?

  • Are all electrical equipment in good working order? (Homemade items/stuff is prohibited)

Confirmation

  • General/Additional Comments:

  • Workers Present

  • Inspector's Signature:

  • Superintendent/Foreman Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.