Main Bedroom Frame Check
Windows
-
Correct window types installed (ex. vinyl vs aluminum)
-
Window sprayfoamed if vinyl and caulked if aluminum
-
Window glass, handles, frame and all components of the window are NOT broken or damaged.
Entrance Door, Closets and General Framing/prep
-
Depth of closet to back wall frame is a minimum of 24''
-
RSO opening corresponds to door size (2'' bigger)
-
Closet header and side walls are leveled
-
Corner studs are installed such that secure drywall corners can be made
-
Prep boards drop below ceiling frame on fire rated walls
-
if resilient channel present, it is secure at ends
-
Fire rated walls are prepped in a way that avoids hidden drywall joints (Drywall sheets are 4ft wide)
Electrical, Mechanical & Fire R/Is
-
Is communication panel in closet?
-
Side of communication panel has 2'' clearance to closet header framing
-
Electrical outlets are maximum of 6ft from any door and maximum of 12ft to the next outlet
-
Walls that are greater than 3ft long have an outlet
-
Demising wall has at most 2 offset single gang electrical outlets or 1 4x4 gangbox in any given stud cavity
-
Lighting fixtures R/Is and outlets installed in correct location as per electrical drawings
-
Diffusers/vents R/Is installed in correct location as per mech drawings
-
Heat pipes that go outside of the building are insulated 6ft back AND not wet/ruined
-
HVAC pipes are not touching ceiling frame (noise problem)
-
AT LEAST 1 sprinkler in room and to be installed in correct location (location permits sprinkler head cover to be placed in finishing stages)
Extras R/I
-
Is "Framing for Wall Mounted TV" extra purchased?
-
1 Row - 2 single gangbox + 1 cable way R/I installed on lower portion of wall and 1 row behind proposed TV location
-
Outlets behind proposed TV location are 67” from ground
-
Is "Contemporary Trim Pkg (3''1/4 casing) " extra purchased?
-
All door nibs are ATLEAST 2''1/2 from stud wall to door opening. Could cheat to 2''1/4 but the other side of the door needs to be ATLEAST 3''.
-
All door nibs are ATLEAST 3'' from stud wall to door opening. Could cheat to 2''3/4 but the other side of the door needs to be ATLEAST 3''1/2.
Secondary Bedroom Frame Check
-
Does suite have a secondary bedroom?
Windows
-
Correct window type installed (ex. vinyl vs aluminum)
-
Window sprayfoamed if vinyl and caulked if aluminum
-
Window glass, handles, frame and all components of the window are NOT broken or damaged.
Entrance Door, Closets and General Framing/prep
-
Depth of closet to back wall frame is a minimum of 24''
-
RSO opening corresponds to door size (2'' bigger)
-
Closet header and side walls are leveled
-
Corner studs are installed such that secure drywall corners can be made
-
Prep boards drop below ceiling frame on fire rated walls
-
if resilient channel present, it is secure at ends
-
Fire rated walls are prepped in a way that avoids hidden drywall joints (Drywall sheets are 4ft wide)
Electrical, Mechanical & Fire R/Is
-
Is communication panel in closet?
-
Side of communication panel has 2'' clearance to closet header framing
-
Electrical outlets are maximum of 6ft from any door and maximum of 12ft to the next outlet
-
Walls that are greater than 3ft long have an outlet
-
Demising wall has at most 2 offset single gang electrical outlets or 1 4x4 gangbox in any given stud cavity
-
Lighting fixtures R/Is and outlets installed in correct location as per electrical drawings
-
Diffusers/vents R/Is installed in correct location as per mech drawings
-
Heat pipes that go outside of the building are insulated 6ft back AND not wet/ruined
-
HVAC pipes are not touching ceiling frame (noise problem)
-
AT LEAST 1 sprinkler in room and to be installed in correct location (location permits sprinkler head cover to be placed in finishing stages)
Extras R/I
-
Is "Framing for Wall Mounted TV" extra purchased?
-
1 Row - 2 single gangbox + 1 cable way R/I installed on lower portion of wall and 1 row behind proposed TV location
-
Is "Contemporary Trim Pkg (3''1/4 casing) " extra purchased?
-
All door nibs are ATLEAST 2''1/2 from stud wall to door opening. Could cheat to 2''1/4 but the other side of the door needs to be ATLEAST 3''.
-
All door nibs are ATLEAST 3'' from stud wall to door opening. Could cheat to 2''3/4 but the other side of the door needs to be ATLEAST 3''1/2.
Main Bathroom Frame Check
Tub, Toilet & Sink Layout Review
-
All items in correct spot as per BuildPro Floor Plan layout
-
Waterlines for sink, toilet and tubs are installed. Ensure waterline will not be pierced by drywall screws
-
Drain for sink and shower head valve are installed and centered
Tub/shower
-
Stud installed at the edge of the tub where the dense shield drywall ends. 100mm on both sides if plumbing chase is present or 2'' when there is no plumbing chase.
Vanity & Toilet
-
If vanity is on the same wall as the door opening the inside face of the door frame is at minimum, 26'' to the back wall. Can cheat to 25''3/4 if ATLEAST 3'' available for trim on other side of door opening (if vanity is not on same wall as door opening, check this box off for progression purposes)
-
Backing installed for vanity
Electrical, Mechanical & Fire R/Is
-
Light fixtures R/Is and outlets installed in correct location as per electrical drawing
-
Washroom fan installed in correct location as per mechanical drawing and is NOT above bathtub
-
HVAC pipes are not touching ceiling frame (noise problem)
-
Sprinkler head installed in correct location and is NOT above the bathtub (location permits sprinkler head cover to be placed in finishing stages)
General Framing and Prep
-
Finished ceiling height will be 8''
-
Backing is installed for bathtub grab bar
-
RSO opening corresponds to door size (2'' bigger)
-
Corner studs are installed such that secure drywall corners can be made
-
Prep boards drop below ceiling frame on fire rated walls
-
if resilient channel present, it is secure at ends
-
Fire rated walls are prepped in a way that avoids hidden drywall joints (Drywall sheets are 4ft wide)
Extras R/Is
-
Is "Vision 30 Package" extra purchased?
-
4'' Pot light rough in plates installed and centred BuildPro Floor plan
-
Larger gangbox installed for additional light switch
-
White Tubco Vision 30 Tub delivered
-
Is "Shower Pot & Switch" stand-alone extra Purchased?
-
4'' Pot light rough in plates installed in correct location as per BuildPro Floor plan (i.e. centered)
-
Larger gangbox installed for additional light switch
-
is "Super Shower" extra purchased?
-
Larger gangbox installed for additional light switch
-
Shower pot light installed centered above super shower
-
Super Shower Tubco Shower Base delivered
-
is "Privacy door" extra purchased?
-
RSO opening corresponds to door size (2'' bigger)
-
Is "Contemporary Trim Pkg (3''1/4 casing) " extra purchased?
-
All door nibs are ATLEAST 2''1/2 from stud wall to door opening. Could cheat to 2''1/4 but the other side of the door needs to be ATLEAST 3''.
-
All door nibs are ATLEAST 3'' from stud wall to door opening. Could cheat to 2''3/4 but the other side of the door needs to be ATLEAST 3''1/2.
-
Is "Vision 30 Tub" stand-alone extra purchased?
-
White Tubco Vision 30 Tub installed (approx. 60'' in width, 4'' profile edge, 30'' deep and 23'' high)
-
Is "Contemporary Trim Pkg (3''1/4 casing) " extra purchased?
-
All door nibs are ATLEAST 2''1/2 from stud wall to door opening. Could cheat to 2''1/4 but the other side of the door needs to be ATLEAST 3''.
-
All door nibs are ATLEAST 3'' from stud wall to door opening. Could cheat to 2''3/4 but the other side of the door needs to be ATLEAST 3''1/2.
-
Is "Tile on Ceilling" extra purchased?
-
Spray paint and markup a note on tub wall to remind drywall guys that Simon wants dense shield drywall
Ensuite Bathroom Frame Check
-
Does this suite have an ensuite bathroom?
Tub, Toilet & Sink Layout Review
-
All items in correct spot as per BuildPro Floor Plan layout
-
Waterlines for sink, toilet and tubs are installed. Ensure waterline will not be pierced by drywall screws
-
Drain for sink and shower head valve are installed and centered
Tub/shower
-
Stud installed at the edge of the tub where the dense shield drywall ends. 100mm on both sides if plumbing chase is present or 2'' when there is no plumbing chase.
Vanity & Toilet
-
If vanity is on the same wall as the door opening the inside face of the door frame is at minimum, 26'' to the back wall. Can cheat to 25''3/4 if ATLEAST 3'' available for trim on other side of door opening (if vanity is not on same wall as door opening, check this box off for progression purposes)
-
Backing for vanity installed
Electrical, Mechanical & Fire R/Is
-
Light fixtures R/Is and outlets installed in correct location as per electrical drawing
-
Washroom fan installed in correct location as per mechanical drawing and is NOT above bathtub
-
HVAC pipes are not touching ceiling frame (noise problem)
-
Sprinkler head installed in correct location and is NOT above the bathtub (location permits sprinkler head cover to be placed in finishing stages)
General Framing and Prep
-
Finished ceiling height will be 8''
-
Backing is installed for bathtub grab bar
-
RSO opening corresponds to door size (2'' bigger)
-
Corner studs are installed such that secure drywall corners can be made
-
Prep boards drop below ceiling frame on fire rated walls
-
if resilient channel present, it is secure at ends
-
Fire rated walls are prepped in a way that avoids hidden drywall joints (Drywall sheets are 4ft wide)
Extras R/Is
-
Is "Vision 30 Package" extra purchased?
-
4'' Pot light rough in plates installed in correct location as per BuildPro Floor plan
-
Larger gangbox installed for additional light switch
-
White Tubco Vision 30 Tub delivered
-
is "Super Shower" extra purchased?
-
Larger gangbox installed for additional light switch
-
Shower pot light installed above super shower
-
Super Shower Tubco Shower Base delivered
-
Is "Shower Pot & Switch" stand-alone extra purchased?
-
4'' Pot light rough in plates installed in correct location as per BuildPro Floor plan
-
Larger gangbox installed for additional light switch
-
is "Privacy door" extra purchased?
-
RSO opening corresponds to door size (2'' bigger)
-
Is "Contemporary Trim Pkg (3''1/4 casing) " extra purchased?
-
All door nibs are ATLEAST 2''1/2 from stud wall to door opening. Could cheat to 2''1/4 but the other side of the door needs to be ATLEAST 3''.
-
All door nibs are ATLEAST 3'' from stud wall to door opening. Could cheat to 2''3/4 but the other side of the door needs to be ATLEAST 3''1/2.
-
Is "Vision 30 Tub" stand-alone extra purchased?
-
White Tubco Vision 30 Tub installed (approx. 60'' in width, 4'' profile edge, 30'' deep and 23'' high)
-
Is "Contemporary Trim Pkg (3''1/4 casing) " extra purchased?
-
All door nibs are ATLEAST 2''1/2 from stud wall to door opening. Could cheat to 2''1/4 but the other side of the door needs to be ATLEAST 3''.
-
All door nibs are ATLEAST 3'' from stud wall to door opening. Could cheat to 2''3/4 but the other side of the door needs to be ATLEAST 3''1/2.
-
Is "Tile on Ceilling" extra purchased?
-
Spray paint and markup a note on tub wall to remind drywall guys that Simon wants dense shield drywall
Front Foyer Frame Check
Front Door
-
R/I for door contact (alarm wire)
-
RSO is 40'' wide (1020mm)
Front closet, Den & General Framing/prep
-
Depth of closet to back wall frame is a minimum of 24''
-
RSO opening corresponds to door size (2'' bigger)
-
Access door framing for fan coil
-
Corner studs are installed such that secure drywall corners can be made
-
Prep boards drop below ceiling frame on fire rated walls
-
if resilient channel present, it is secure at ends
-
Fire rated walls are prepped in a way that avoids hidden drywall joints (Drywall sheets are 4ft wide)
Electrical, Mechanical & Fire R/Is
-
Is communication panel in closet?
-
Side of communication panel has 2'' clearance to closet header framing
-
Light fixtures R/Is and outlets installed in correct location as per electrical drawing
-
HVAC pipes are not touching ceiling frame (noise problem)
Extra R/Is
-
Is "Contemporary Trim Pkg (3''1/4 casing) " extra purchased?
-
All door nibs are ATLEAST 2''1/2 from stud wall to door opening. Could cheat to 2''1/4 but the other side of the door needs to be ATLEAST 3''.
-
All door nibs are ATLEAST 3'' from stud wall to door opening. Could cheat to 2''3/4 but the other side of the door needs to be ATLEAST 3''1/2.
Laundry Frame Check
Electrical, Mechanical & Fire R/I
-
Light R/Is and outlets installed in correct location as per electrical drawing
-
If light is installed above door header, it is CENTERED above door within 1/2'' and there is at least 2.5'' clearance to bottom of light rough in (if no light, pass this check for progression purposes)
-
Water lines are installed into laundry standbox
-
Dryer vent/diffusers extends beneath ceiling frame and are installed in correct location as per mech dwgs
-
ATLEAST 1 Sprinkler head installed in room and in correct location (location permits sprinkler head cover to be placed in finishing stages)
General Framing/prep
-
RSO opening corresponds to door size (2'' bigger)
-
Corner studs are installed such that secure drywall corners can be made
-
Prep boards drop below ceiling frame on fire rated walls
-
if resilient channel present, it is secure at ends
-
Fire rated walls are prepped in a way that avoids hidden drywall joints (Drywall sheets are 4ft wide)
Extra R/Is
-
Is "Contemporary Trim Pkg (3''1/4 casing) " extra purchased?
-
All door nibs are ATLEAST 2''1/2 from stud wall to door opening. Could cheat to 2''1/4 but the other side of the door needs to be ATLEAST 3''.
-
All door nibs are ATLEAST 3'' from stud wall to door opening. Could cheat to 2''3/4 but the other side of the door needs to be ATLEAST 3''1/2.
Kitchen Frame Check
Kitchen Dimension
-
Overall dimension of kitchen walls matches the measurement in Cartier Kitchen's shop drawing
-
Kitchen nib is a minimum of 12'', square and braced to hold plumbing fixtures (if no kitchen nib is designed for this suite, check off this box for progression purposes)
Cabinets
-
Backing installed behind kitchen cabinets above AND below countertop
Electrical, Mechanical & Fire R/I
-
Light R/Is and outlets installed in correct location as per electrical drawing & Cartier shop drawings
-
Outlet installed behind the fridge and no counter plugs installed behind fridge
-
No counter plug installed directly behind dishwasher
-
Counter plugs are all ~63'' 3/8 from ceiling to receptacle screw hole or plugs are at most 1/4'' offset
-
220V electrical outlet installed at the bottom and behind the stove around 6''- 8'' from slab AND no counter plugs are installed behind stove
-
Hood fan exhaust is installed in the center of the stove AND hood fan exhaust extends beyond ceiling frame
-
HVAC pipes are not touching ceiling frame (noise problem). Exception to hood fan exhaust
-
Sprinkler head installed in correct location and is NOT inside an upper cabinet (location permits sprinkler head cover to be placed in finishing stages)
General Framing/prep
-
Corner studs are installed such that secure drywall corners can be made
-
Prep boards drop below ceiling frame on fire rated walls
-
if resilient channel present, it is secure at ends
-
Fire rated walls are prepped in a way that avoids hidden drywall joints (Drywall sheets are 4ft wide)
Extras R/Is
-
Is "Alternate Kitchen Layout" extra purchased?
-
Electrical conduit chipped and installed into concrete leading up to island
-
2x Pendant light electrical box R/Is above island installed
-
Is "Upgraded Kitchen Package" extra purchased?
-
Fridge Cold waterline installed
-
Is "Valance Light - up to 15' extra purchased?
-
Valance light conduit is installed beneath all uppers on counter top at 56''
-
Valance gangbox installed
-
is "Luxury Kitchen Pkg" or "Stacked Uppers" extra purchased?
-
4th Row of backing is installed behind stacked uppers and cabinets
-
"4'' Potlight Package" extra purchased
-
4 x 4'' Pot light rough in plates installed in correct location as per electrical drawing
-
Is "Low Voltage Dimmer Switch" extra purchased?
-
White neutral wire inside BX cable inside single gangbox.
Living Room Frame Check
Balcony Door and Windows
-
Is suite on 1st floor?
-
Security Sensor R/I installed (i.e. opening for alarm wires is present near Balcony entrance)
-
Balcony door glass, handles, frame and all components of the balcony door are NOT broken or damaged
-
Does living room have window?
-
Correct window type installed (ex. vinyl vs aluminum)
-
Window sprayfoamed if vinyl and caulked if aluminum
-
Window glass, handles, frame and all components of the window are NOT broken or damaged.
Smart ONE IPAD & Thermostat R/I
-
IPAD gangbox is 55'' from slab floor to its center (can be lower for BF Suites)
-
Thermostat plastic guide is installed onto steel studs (typically near by Smart ONE IPAD)
-
Is thermostat plastic guide installed above or below IPAD gangbox?
-
Thermostat plastic guide has ATLEAST 2'' clearance if installed above and ATLEAST 4'' clearance if installed below
-
Thermostat plastic guide has a 6'' clearance from the edge of the IPAD gangbox
General Framing/prep
-
Corner studs are installed such that secure drywall corners can be made
-
Prep boards drop below ceiling frame on fire rated walls
-
if resilient channel present, it is secure at ends
-
Does the suite have a jog between demising walls
-
3M tape installed in locking stud cavity inside Magest wall where poly VB ends.
Electrical, Mechanical & Fire R/I
-
Lighting R/Is and outlets installed in correct location as per electrical drawing.
-
Diffuser/vent R/Is installed in correct location as per mech drawings
-
HVAC pipes are not touching ceiling frame (noise problem)
-
Heat pipes that go outside of the building are insulated 6ft back
-
Sprinkler head installed in correct location (location permits sprinkler head cover to be placed in finishing stages)
Extras R/Is
-
"4'' Potlight Package" extra purchased
-
4 x 4'' Pot light rough in plates installed in correct location as per electrical drawing
-
Is "Low Voltage Dimmer Switch" extra purchased?
-
White neutral wire inside BX cable inside single gangbox.
-
Is "Framing for Wall Mounted TV" extra purchased?
-
1 Row of 1 electrical + 2 cable outlet R/Is installed on lower portion of wall and 1 row behind proposed TV location
-
Outlets behind proposed TV location are 67” from ground