JOB DESCRIPTION
Risks
IDENTIFY HAZARDS
-
Over head lines
-
Electricity
-
High voltage
-
Electrical contact
-
Other hazards
- Hot work
- Fault arc
- Fire / Explosion
- Hot work
- Mechanical
- Noise
- lighting
- Plant / vehicles
- Roads / Traffic
- Topography
- Excavation
- Trench collapses
- Confined space
- Access / Exits
- Fatigue
- Slip / Trip
- Falling / Flying objects
- Heights / falls
- Weather conditions
- Sun exposure
- Manual handling
- Vibration
- Sharp edges / Pinch points
- Cuts and abrasions
- Dust
- Fumes / Gases
- Oxygen levels
- Vapors / Liquids
- Steam
- Chemicals / Substances
- Ceiling space
RISK SCORE
-
High, Moderate, Low
Implement
IMPLEMENT CONTROL MEASURES
-
Isolate overhead lines
-
Isolation
-
Mechanical locking device
-
Switchboard rescue kit
-
Safety observer
-
Other control measures
- Barricade / Fence
- Rubber mat / Barrier mat
- Insulating / Safety gloves
- Helmet
- Face shield
- Dust mask
- Other PPE
- Fire blanket
- Extinguishers
- Mechanical aid
- Safety equip / Devices
- Water
- Solar protection
- Ventilation
- House keeping
- Lighting
- Scaffold
- Mobile work platform
- Safety harness
- Signage
- Communication equipment
- Emergency procedure
- Work procedure
- Inductions / Briefings
- Training
- Work out of hours
Method statements
WORK METHOD STATEMENT WORKING TO
-
WSM 1. Basic fault finding WSM On LV MCC similar panels
-
WSM 2. Working in trench or pit at depth of 1.5 m or more
-
WSM 3. Confined space
-
WSM 4. Working with asbestos
-
WSM 5. Live work
-
WSM 6. Isolating and work on electrical equipment
-
WSM 7. Conduit installation, prior to pouring concrete
-
WSM 8. Conduit installation in ground
-
WSM 9. Conduit installation in ground
-
WSM 10. Cable and ladder tray installation
-
WSM 11. Working in risers
-
WSM 12. Using portable ladders
-
WSM 13. Installing light fittings
-
WSM 14. Installation of switch boards
-
WSM 15. Installation of MIMMS cable
-
WMS 16. Installation of looms
-
WSM 17. Installation of cable supports
-
WSM 18. Installations of mains
-
WSM 19. Installation of switchboard connections
-
WSM 20. New work in existing switchboards
-
WSM 21. Installation of sub mains
-
WSM 22. Installation of power and light cables
-
WSM 23. Installation of power points
-
WSM 24. Manual handling
-
WSM 25. Working with elevated platforms
-
WSM 26. Using mobile scaffolds
-
WSM 27. Isolate, lockout and test
-
WSM 28. Working at heights
-
WSM 29. Installing ceiling mounted lights and speakers
-
WSM 30. Removal of PCB's
-
WSM 31. Testing and tagging of electrical appliances
-
WSM 32. Disconnecting an existing installation
-
WSM 33. Installation of SELV cabling
Record procedures
RECORD PROCEDURES
-
OTHER HAZARDS
-
RISK SCORE
-
APPLY CONTROL MEASURES
-
RISK SCORE 2
IF RESIDUAL RISK NOT LOW, REDO CONTROL MEASURES
-
If residual risk low, commence work
-
Monitor and review effectiveness
RISK ASSESSMENT CARRIED OUT BY
-
Name
-
Name
-
Name
-
Name