Information

  • Connect-IP Job No:

  • Store Name:

  • Concession Name(s) or Area Worked in:

  • Lead Engineer Name:

  • All Engineers on site:

  • Report for Day Shift or Night Shift:

  • Report Date:

  • Shift Start Time:

  • Shift End Time:

Selfridges Works Report

Last Nights / Days Works:

  • What works have been carried out during the last shift?:

  • Has All Work Been Completed:

  • Are All outlets tested and labelled:

  • All ceiling tiles replaced and site left in a tidy state:

  • Has any cabling passed through any fire walls / fire breaks / fire penetrations? (NOTE: IF YES, INCLUDE BEFORE AND AFTER IMAGES)

  • Take an image of the completed works if suitable:

  • Revisit or further work required to complete (please detail):

  • General Notes for Operations? (input N/A if none):

Forthcoming Works

  • Are any other materials required to be ordered (please detail)?:

  • Are there any specific Access Issues to be looked into / arranged?:

  • General Notes for Operations? (input N/A if none):

SITE SIGN-OFF: The above work has taken place and the site has been left in an acceptable condition.

  • Signed (Connect-IP Engineer)

NB: Completion of this sign-off is mandatory and must be completed ON SITE and submitted to Connect-IP

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.