Title Page
-
Site conducted
-
Site Address
-
Client
-
Elevation
- North
- South
- East
- West
- Other.
-
Project Phase
- Phase 1
- Phase 2
- Phase 3
- Phase 4
- Phase 5
- Phase 6
- Other
-
Conducted on
-
Prepared by
- Surface Inspection
-
Elevation
- Phase 1
- Phase 2
- Phase 3
- Phase 4
- Phase 5
- Phase 6
- Other
-
Reference
-
Type Of Ground Surface Material
- Paving Slabs
- Block Paving
- Tiles
- Tarmac
- Concrete
- Grass
- Other
-
Is There Any Damage To The Existing Surface?
-
What type of damage Is Present? Choose from the ones listed: crack, Chipped, scratched, painted or stained, or other?
-
Attached Photo Of Damage Surfaces.
-
HOLD POINT - Ensure all photographs, Notes And Damage locations Are Taken. Do Not Continue Unless This Has Been Completed
Feedback
- Observation
-
Observation Comments.
Completion
-
Are There Any other notes relevant to this particular elevation level not covered in the previous questions?
-
Are There Any other notes relevant to this particular elevation level not covered in the previous questions?
-
Sign Below To Confirm That Questions Above Have Been Answered Truthfully And With All Due Diligence Having Been Carried Out.
-
Person Conducting This Inspection
-
Date And Time Of completion
-
Person Receiving This Report