Information
-
Division
-
Community
-
Homesite/Address
-
Homesite Picture from Street
-
Installation Contractor
-
Conducted on
-
Prepared By
PV Solar Array
-
All roof penetrations caulked prior to lag bolt installation in a craftsman like manner?
-
All shoes for racking system flashed properly in a craftsman like manner?
-
Racking System, Micro Inverters, Modules and SolaDeck Box/Boxes bonded per manufacturers specifications and all applicable codes in a consistent and craftsman like manner?
-
All racking components, including Module Clamps, torqued per manufactures specifications?
-
PV Array assembled true, square and centered within the well in a craftsman like manner?
-
All terminations within the SolaDeck Box/Boxes done with proper connectors in a consistent and craftsman like manner?
-
All roof mounted equipment is ready for Final Solar Inspection?
-
Installation Notes:
-
Add media
PV Trim and Labeling Installation
-
Cat 5 and receptacle trim complete an Envoy?
-
Envoy mounted approximately 6' from the floor?
-
A/C Disconnect and Meter Socket (where applicable) installed at proper location and hight?
-
Proper connectors installed at A/C Disconnect and Meter Socket (where applicable) per all governing codes in a craftsman like manner?
-
A/C Disconnect and Meter Socket (where applicable) bonded properly per all governing codes in a craftsman like manner?
-
All labeling to satisfy plans, utilities, and any governing codes installed with appropriate bonding material, with none showing outside labels, in a craftsman like manner?
-
Proper circuit breakers installed at main and sub-panel (where applicable) per the plans?
-
A/C Disconnect left in the off position and locked out?
-
All debris removed from homesite and disposed of in proper receptacle?
-
Homesite Ready for Final Solar Inspection?
-
Installation Notes:
-