Information

CAM Brickwork Inspection

  • Document No.

  • Job Number

  • Address

  • Conducted on

  • Prepared by

Inspection Items

  • All flashings, DPC's, and weep holes installed in accordance with Clarendon standards.

  • Stepped cavity flashings formed and cleaned in accordance with Clarendon specifications.

  • Brick ties positioned in accordance with BCA.

  • Sufficient Clearance has been provided between windows and brick sills in accordance with BCA.

  • Are all Cavities and flashings left clean.

  • Is brickwork overhanging slab?

  • Perp and bed joints consistent within standards and BCA?

  • Is alcor tray installed over steel beams?

  • Is Alcor tray turned up and free of mortar?

  • Stair void fall protection left in tact with access hatch closed.

  • House area left cleaned of all trade waste and placed in waste enclosure.

  • Ensure granitguard system installed in accordance with Australian Standards.

  • Has job been brick cleaned?

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.