Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Outstanding issues from pervious Auidit
-
-
Photo 1 Kelvin Way End
-
Photo 2 - Island side
-
Photo 3 Approach From Down Stream
-
Photo 4 - Approach From Up Stream
BRIDGE ENDS
-
Guard Rail Ends
-
Bridge Signage in place
DECK
-
Joint condition
-
Drain condition
-
Rail Condition
-
Sidewalk Condition
-
Overall Deck Condition
SUPERSTRUCTURE
-
Girders
-
Stringers
-
Floor beams
-
Sway Bracing
-
Hangers
-
Paint Work
-
Mid section concrete support beams
Abutments
-
Caps
-
Bearings
-
Embankment
Inspection Team Summary
-
General Notes
Security
-
Bar Wire in place and in good working order
Vegetation
-
Vegetation clear on kelvin Way side
-
Vegetation clear on Island side
-
Observation to questions are based on the original survey by SSB.
Similar Condition to original survey.
Deteriorated from original survey.
Damaged. -
Add signature