Date Reported:
Date
Area
Sustainability Inspector
Area
Select
Area 1 - Oil unloading dock; corp pump; sewer treater outfal; main outfall; air receiver tank; outfall 101; alligator bayou pumps; fire pump; storm water tank; settling pond
Area 2 - Tank farm; transfer shed; day tanks; S standpipe; sewer treater; API seperator
Area 3 - Maintenance shop; E/I shop; Cleco substation
Area 4 - Shell yard; contractor trailer area; compressor building; stores; drum storage
Area 5 - contractor bathhouse; contractor village; N contractor parking; contractor parking; guard shack
Area 6 - Front parking lot; plant entrance; front office; bathhouses; all walkways to PPE line; utility substation; flag poles
Area 7 - Reactor deck; Hex
Area 8 - COF; Andrew Hall; PC10
Area 9 - Potable water tank; RO water building; Incinerator
Area 10 - Gypsum loading; ammonia tank; APC; SB process water sump; APC sump; SB storm water diesel sump
Area 11 - CS1 reactor area including HEx; KCl pump room; CS2 reactor area including Hex; grassy area next to SB break room
Area 12A - CO6 MUF; rerun station; dryers; to WPS wall; Cabx rerun
Area 12B - CO6 mixer floor; KF floor; grinder floor
Area 13A - CO5 MUF; purge filters; N & S dryer to warehouse; PC4 (south side); RB water heater
Area 13B - CO5 mixer floor; KF floor; grinder floor
Area 14 - Hot box; micronizer; A&B MUF; A&B purge filters
Area 15A - CO3A&B dryers; PC4 (north side); VOC3 &4; Orzan (binder) bulk area
Area 15B - CO3A&B pelletizer floor to top of process building
Area 16 - CS1 & 2 MUFs; PC3; up to HRSG; up to dryers
Area 17A - CS1 & 2 dryers; under OQ tanks to warehouse wall; CS2 rerun stand to PC3 wall and CS2 MUF
Area 17B - CS1 &2 pelletizer floors; recycle area up to including CS2 purge filter screw floor
Area 17C - Purge filter & process filter cone floor to the top; VS1/2 rotary screens; VS3 dust filter; VS5 dust filter; lump breaker area CS1; VS1/2 magnet area; ferro filter area
Area 18 - CO3A, CO3B, CO5, & CO6 bridge screws; all 4 bunker screws; bunkers 1-16; top of silos 1-3
Area 19 - VO1 through VO4; CO5/6 cross screw; CO3A/B elevated discharge screw and elevators; CO5 N & S elevators and discharge screw
Area 20 - Warehouse 1 through truck dock 1
Area 21 - Warehouse 8 through warehouse 11; SB track area and bunkers
Area 22 - North Wall of warehouse 11 including SB palletizer; VS1/2 IBC; VS1/2 bag packer; VS1 IBC loader
Area 23 - VS6/7 IBC; VS6/7 packer; VS5 robot; Monarch room; up to south wall of Truck dock 6
Area 24 - trash compactor; pallet yard up to ammonia unloading; OQ and closed duck boxes
Area 25 - Truck dock 6; bag room; Warehouses 20 through 30; shipping & receiving trailer
Area 26A - Bunker 1 through 16 railroad track up to binder car station (box/hopper track)
Area 26B - Bunker 1 through 16 manutube area; FIBC screws
Area 27A - Acton to south end of track
Area 27B - Central packer cross screw to silo manutube to FIBC loader cross screw; truck loading station
Area 28 - Fence line from double gate behind front office to contractor entrance; scale house
Area 29 - Road through HP oil pumps; PC7; oil heaters
Area 1 - Oil unloading dock; corp pump; sewer treater outfal; main outfall; air receiver tank; outfall 101; alligator bayou pumps; fire pump; storm water tank; settling pond Area 2 - Tank farm; transfer shed; day tanks; S standpipe; sewer treater; API seperator Area 3 - Maintenance shop; E/I shop; Cleco substation Area 4 - Shell yard; contractor trailer area; compressor building; stores; drum storage Area 5 - contractor bathhouse; contractor village; N contractor parking; contractor parking; guard shack Area 6 - Front parking lot; plant entrance; front office; bathhouses; all walkways to PPE line; utility substation; flag poles Area 7 - Reactor deck; Hex Area 8 - COF; Andrew Hall; PC10 Area 9 - Potable water tank; RO water building; Incinerator Area 10 - Gypsum loading; ammonia tank; APC; SB process water sump; APC sump; SB storm water diesel sump Area 11 - CS1 reactor area including HEx; KCl pump room; CS2 reactor area including Hex; grassy area next to SB break room Area 12A - CO6 MUF; rerun station; dryers; to WPS wall; Cabx rerun Area 12B - CO6 mixer floor; KF floor; grinder floor Area 13A - CO5 MUF; purge filters; N & S dryer to warehouse; PC4 (south side); RB water heater Area 13B - CO5 mixer floor; KF floor; grinder floor Area 14 - Hot box; micronizer; A&B MUF; A&B purge filters Area 15A - CO3A&B dryers; PC4 (north side); VOC3 &4; Orzan (binder) bulk area Area 15B - CO3A&B pelletizer floor to top of process building Area 16 - CS1 & 2 MUFs; PC3; up to HRSG; up to dryers Area 17A - CS1 & 2 dryers; under OQ tanks to warehouse wall; CS2 rerun stand to PC3 wall and CS2 MUF Area 17B - CS1 &2 pelletizer floors; recycle area up to including CS2 purge filter screw floor Area 17C - Purge filter & process filter cone floor to the top; VS1/2 rotary screens; VS3 dust filter; VS5 dust filter; lump breaker area CS1; VS1/2 magnet area; ferro filter area Area 18 - CO3A, CO3B, CO5, & CO6 bridge screws; all 4 bunker screws; bunkers 1-16; top of silos 1-3 Area 19 - VO1 through VO4; CO5/6 cross screw; CO3A/B elevated discharge screw and elevators; CO5 N & S elevators and discharge screw Area 20 - Warehouse 1 through truck dock 1 Area 21 - Warehouse 8 through warehouse 11; SB track area and bunkers Area 22 - North Wall of warehouse 11 including SB palletizer; VS1/2 IBC; VS1/2 bag packer; VS1 IBC loader Area 23 - VS6/7 IBC; VS6/7 packer; VS5 robot; Monarch room; up to south wall of Truck dock 6 Area 24 - trash compactor; pallet yard up to ammonia unloading; OQ and closed duck boxes Area 25 - Truck dock 6; bag room; Warehouses 20 through 30; shipping & receiving trailer Area 26A - Bunker 1 through 16 railroad track up to binder car station (box/hopper track) Area 26B - Bunker 1 through 16 manutube area; FIBC screws Area 27A - Acton to south end of track Area 27B - Central packer cross screw to silo manutube to FIBC loader cross screw; truck loading station Area 28 - Fence line from double gate behind front office to contractor entrance; scale house Area 29 - Road through HP oil pumps; PC7; oil heaters
What did you find?
Take pictures of what you found and how you left it
Media
How severe is this event (1=Extremely Bad to 5=Very Minor)?
Intelex Observation Needed?
JDE Work Order Needed?
What Kind of Event is this?
Other Area(s) Affected?
Select
Area 1 - Oil unloading dock; corp pump; sewer treater outfal; main outfall; air receiver tank; outfall 101; alligator bayou pumps; fire pump; storm water tank; settling pond
Area 2 - Tank farm; transfer shed; day tanks; S standpipe; sewer treater; API seperator
Area 3 - Maintenance shop; E/I shop; Cleco substation
Area 4 - Shell yard; contractor trailer area; compressor building; stores; drum storage
Area 5 - contractor bathhouse; contractor village; N contractor parking; contractor parking; guard shack
Area 6 - Front parking lot; plant entrance; front office; bathhouses; all walkways to PPE line; utility substation; flag poles
Area 7 - Reactor deck; Hex
Area 8 - COF; Andrew Hall; PC10
Area 9 - Potable water tank; RO water building; Incinerator
Area 10 - Gypsum loading; ammonia tank; APC; SB process water sump; APC sump; SB storm water diesel sump
Area 11 - CS1 reactor area including HEx; KCl pump room; CS2 reactor area including Hex; grassy area next to SB break room
Area 12A - CO6 MUF; rerun station; dryers; to WPS wall; Cabx rerun
Area 12B - CO6 mixer floor; KF floor; grinder floor
Area 13A - CO5 MUF; purge filters; N & S dryer to warehouse; PC4 (south side); RB water heater
Area 13B - CO5 mixer floor; KF floor; grinder floor
Area 14 - Hot box; micronizer; A&B MUF; A&B purge filters
Area 15A - CO3A&B dryers; PC4 (north side); VOC3 &4; Orzan (binder) bulk area
Area 15B - CO3A&B pelletizer floor to top of process building
Area 16 - CS1 & 2 MUFs; PC3; up to HRSG; up to dryers
Area 17A - CS1 & 2 dryers; under OQ tanks to warehouse wall; CS2 rerun stand to PC3 wall and CS2 MUF
Area 17B - CS1 &2 pelletizer floors; recycle area up to including CS2 purge filter screw floor
Area 17C - Purge filter & process filter cone floor to the top; VS1/2 rotary screens; VS3 dust filter; VS5 dust filter; lump breaker area CS1; VS1/2 magnet area; ferro filter area
Area 18 - CO3A, CO3B, CO5, & CO6 bridge screws; all 4 bunker screws; bunkers 1-16; top of silos 1-3
Area 19 - VO1 through VO4; CO5/6 cross screw; CO3A/B elevated discharge screw and elevators; CO5 N & S elevators and discharge screw
Area 20 - Warehouse 1 through truck dock 1
Area 21 - Warehouse 8 through warehouse 11; SB track area and bunkers
Area 22 - North Wall of warehouse 11 including SB palletizer; VS1/2 IBC; VS1/2 bag packer; VS1 IBC loader
Area 23 - VS6/7 IBC; VS6/7 packer; VS5 robot; Monarch room; up to south wall of Truck dock 6
Area 24 - trash compactor; pallet yard up to ammonia unloading; OQ and closed duck boxes
Area 25 - Truck dock 6; bag room; Warehouses 20 through 30; shipping & receiving trailer
Area 26A - Bunker 1 through 16 railroad track up to binder car station (box/hopper track)
Area 26B - Bunker 1 through 16 manutube area; FIBC screws
Area 27A - Acton to south end of track
Area 27B - Central packer cross screw to silo manutube to FIBC loader cross screw; truck loading station
Area 28 - Fence line from double gate behind front office to contractor entrance; scale house
Area 29 - Road through HP oil pumps; PC7; oil heaters
Area 1 - Oil unloading dock; corp pump; sewer treater outfal; main outfall; air receiver tank; outfall 101; alligator bayou pumps; fire pump; storm water tank; settling pond Area 2 - Tank farm; transfer shed; day tanks; S standpipe; sewer treater; API seperator Area 3 - Maintenance shop; E/I shop; Cleco substation Area 4 - Shell yard; contractor trailer area; compressor building; stores; drum storage Area 5 - contractor bathhouse; contractor village; N contractor parking; contractor parking; guard shack Area 6 - Front parking lot; plant entrance; front office; bathhouses; all walkways to PPE line; utility substation; flag poles Area 7 - Reactor deck; Hex Area 8 - COF; Andrew Hall; PC10 Area 9 - Potable water tank; RO water building; Incinerator Area 10 - Gypsum loading; ammonia tank; APC; SB process water sump; APC sump; SB storm water diesel sump Area 11 - CS1 reactor area including HEx; KCl pump room; CS2 reactor area including Hex; grassy area next to SB break room Area 12A - CO6 MUF; rerun station; dryers; to WPS wall; Cabx rerun Area 12B - CO6 mixer floor; KF floor; grinder floor Area 13A - CO5 MUF; purge filters; N & S dryer to warehouse; PC4 (south side); RB water heater Area 13B - CO5 mixer floor; KF floor; grinder floor Area 14 - Hot box; micronizer; A&B MUF; A&B purge filters Area 15A - CO3A&B dryers; PC4 (north side); VOC3 &4; Orzan (binder) bulk area Area 15B - CO3A&B pelletizer floor to top of process building Area 16 - CS1 & 2 MUFs; PC3; up to HRSG; up to dryers Area 17A - CS1 & 2 dryers; under OQ tanks to warehouse wall; CS2 rerun stand to PC3 wall and CS2 MUF Area 17B - CS1 &2 pelletizer floors; recycle area up to including CS2 purge filter screw floor Area 17C - Purge filter & process filter cone floor to the top; VS1/2 rotary screens; VS3 dust filter; VS5 dust filter; lump breaker area CS1; VS1/2 magnet area; ferro filter area Area 18 - CO3A, CO3B, CO5, & CO6 bridge screws; all 4 bunker screws; bunkers 1-16; top of silos 1-3 Area 19 - VO1 through VO4; CO5/6 cross screw; CO3A/B elevated discharge screw and elevators; CO5 N & S elevators and discharge screw Area 20 - Warehouse 1 through truck dock 1 Area 21 - Warehouse 8 through warehouse 11; SB track area and bunkers Area 22 - North Wall of warehouse 11 including SB palletizer; VS1/2 IBC; VS1/2 bag packer; VS1 IBC loader Area 23 - VS6/7 IBC; VS6/7 packer; VS5 robot; Monarch room; up to south wall of Truck dock 6 Area 24 - trash compactor; pallet yard up to ammonia unloading; OQ and closed duck boxes Area 25 - Truck dock 6; bag room; Warehouses 20 through 30; shipping & receiving trailer Area 26A - Bunker 1 through 16 railroad track up to binder car station (box/hopper track) Area 26B - Bunker 1 through 16 manutube area; FIBC screws Area 27A - Acton to south end of track Area 27B - Central packer cross screw to silo manutube to FIBC loader cross screw; truck loading station Area 28 - Fence line from double gate behind front office to contractor entrance; scale house Area 29 - Road through HP oil pumps; PC7; oil heaters
Amount Spilled (in Pounds)?
Other Area(s) Affected?
Select
Area 1 - Oil unloading dock; corp pump; sewer treater outfal; main outfall; air receiver tank; outfall 101; alligator bayou pumps; fire pump; storm water tank; settling pond
Area 2 - Tank farm; transfer shed; day tanks; S standpipe; sewer treater; API seperator
Area 3 - Maintenance shop; E/I shop; Cleco substation
Area 4 - Shell yard; contractor trailer area; compressor building; stores; drum storage
Area 5 - contractor bathhouse; contractor village; N contractor parking; contractor parking; guard shack
Area 6 - Front parking lot; plant entrance; front office; bathhouses; all walkways to PPE line; utility substation; flag poles
Area 7 - Reactor deck; Hex
Area 8 - COF; Andrew Hall; PC10
Area 9 - Potable water tank; RO water building; Incinerator
Area 10 - Gypsum loading; ammonia tank; APC; SB process water sump; APC sump; SB storm water diesel sump
Area 11 - CS1 reactor area including HEx; KCl pump room; CS2 reactor area including Hex; grassy area next to SB break room
Area 12A - CO6 MUF; rerun station; dryers; to WPS wall; Cabx rerun
Area 12B - CO6 mixer floor; KF floor; grinder floor
Area 13A - CO5 MUF; purge filters; N & S dryer to warehouse; PC4 (south side); RB water heater
Area 13B - CO5 mixer floor; KF floor; grinder floor
Area 14 - Hot box; micronizer; A&B MUF; A&B purge filters
Area 15A - CO3A&B dryers; PC4 (north side); VOC3 &4; Orzan (binder) bulk area
Area 15B - CO3A&B pelletizer floor to top of process building
Area 16 - CS1 & 2 MUFs; PC3; up to HRSG; up to dryers
Area 17A - CS1 & 2 dryers; under OQ tanks to warehouse wall; CS2 rerun stand to PC3 wall and CS2 MUF
Area 17B - CS1 &2 pelletizer floors; recycle area up to including CS2 purge filter screw floor
Area 17C - Purge filter & process filter cone floor to the top; VS1/2 rotary screens; VS3 dust filter; VS5 dust filter; lump breaker area CS1; VS1/2 magnet area; ferro filter area
Area 18 - CO3A, CO3B, CO5, & CO6 bridge screws; all 4 bunker screws; bunkers 1-16; top of silos 1-3
Area 19 - VO1 through VO4; CO5/6 cross screw; CO3A/B elevated discharge screw and elevators; CO5 N & S elevators and discharge screw
Area 20 - Warehouse 1 through truck dock 1
Area 21 - Warehouse 8 through warehouse 11; SB track area and bunkers
Area 22 - North Wall of warehouse 11 including SB palletizer; VS1/2 IBC; VS1/2 bag packer; VS1 IBC loader
Area 23 - VS6/7 IBC; VS6/7 packer; VS5 robot; Monarch room; up to south wall of Truck dock 6
Area 24 - trash compactor; pallet yard up to ammonia unloading; OQ and closed duck boxes
Area 25 - Truck dock 6; bag room; Warehouses 20 through 30; shipping & receiving trailer
Area 26A - Bunker 1 through 16 railroad track up to binder car station (box/hopper track)
Area 26B - Bunker 1 through 16 manutube area; FIBC screws
Area 27A - Acton to south end of track
Area 27B - Central packer cross screw to silo manutube to FIBC loader cross screw; truck loading station
Area 28 - Fence line from double gate behind front office to contractor entrance; scale house
Area 29 - Road through HP oil pumps; PC7; oil heaters
Area 1 - Oil unloading dock; corp pump; sewer treater outfal; main outfall; air receiver tank; outfall 101; alligator bayou pumps; fire pump; storm water tank; settling pond Area 2 - Tank farm; transfer shed; day tanks; S standpipe; sewer treater; API seperator Area 3 - Maintenance shop; E/I shop; Cleco substation Area 4 - Shell yard; contractor trailer area; compressor building; stores; drum storage Area 5 - contractor bathhouse; contractor village; N contractor parking; contractor parking; guard shack Area 6 - Front parking lot; plant entrance; front office; bathhouses; all walkways to PPE line; utility substation; flag poles Area 7 - Reactor deck; Hex Area 8 - COF; Andrew Hall; PC10 Area 9 - Potable water tank; RO water building; Incinerator Area 10 - Gypsum loading; ammonia tank; APC; SB process water sump; APC sump; SB storm water diesel sump Area 11 - CS1 reactor area including HEx; KCl pump room; CS2 reactor area including Hex; grassy area next to SB break room Area 12A - CO6 MUF; rerun station; dryers; to WPS wall; Cabx rerun Area 12B - CO6 mixer floor; KF floor; grinder floor Area 13A - CO5 MUF; purge filters; N & S dryer to warehouse; PC4 (south side); RB water heater Area 13B - CO5 mixer floor; KF floor; grinder floor Area 14 - Hot box; micronizer; A&B MUF; A&B purge filters Area 15A - CO3A&B dryers; PC4 (north side); VOC3 &4; Orzan (binder) bulk area Area 15B - CO3A&B pelletizer floor to top of process building Area 16 - CS1 & 2 MUFs; PC3; up to HRSG; up to dryers Area 17A - CS1 & 2 dryers; under OQ tanks to warehouse wall; CS2 rerun stand to PC3 wall and CS2 MUF Area 17B - CS1 &2 pelletizer floors; recycle area up to including CS2 purge filter screw floor Area 17C - Purge filter & process filter cone floor to the top; VS1/2 rotary screens; VS3 dust filter; VS5 dust filter; lump breaker area CS1; VS1/2 magnet area; ferro filter area Area 18 - CO3A, CO3B, CO5, & CO6 bridge screws; all 4 bunker screws; bunkers 1-16; top of silos 1-3 Area 19 - VO1 through VO4; CO5/6 cross screw; CO3A/B elevated discharge screw and elevators; CO5 N & S elevators and discharge screw Area 20 - Warehouse 1 through truck dock 1 Area 21 - Warehouse 8 through warehouse 11; SB track area and bunkers Area 22 - North Wall of warehouse 11 including SB palletizer; VS1/2 IBC; VS1/2 bag packer; VS1 IBC loader Area 23 - VS6/7 IBC; VS6/7 packer; VS5 robot; Monarch room; up to south wall of Truck dock 6 Area 24 - trash compactor; pallet yard up to ammonia unloading; OQ and closed duck boxes Area 25 - Truck dock 6; bag room; Warehouses 20 through 30; shipping & receiving trailer Area 26A - Bunker 1 through 16 railroad track up to binder car station (box/hopper track) Area 26B - Bunker 1 through 16 manutube area; FIBC screws Area 27A - Acton to south end of track Area 27B - Central packer cross screw to silo manutube to FIBC loader cross screw; truck loading station Area 28 - Fence line from double gate behind front office to contractor entrance; scale house Area 29 - Road through HP oil pumps; PC7; oil heaters
Amount Spilled (specify unit of measure)?
link copied
Joseph Vincent
Canal Sustainability Area Report - duplicate
Use this form to report an issue found during a sustainability area inspection.
The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions.
The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice.
You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction.
You should independently determine whether the template is suitable for your circumstances.