Title Page
-
Pack number
-
Conducted on
-
Prepared by
-
Location
-
Fibre type
Build Report - Chamber
- Chamber Information
-
Please supply 3 photos of the chamber...
-
Have you taken a picture of the chamber - lid closed with location context?
-
Have you taken a picture of the chamber - lid open with location context?
-
Have you taken a picture of the cable - compliantly labelled and readable?
-
Does this chamber require a joint as per design?
-
Please input the joint number as per the design.
-
Have you requested a through joint to be added to this chamber?
-
Who approved the request?
-
Please input the duct section number.
-
Duct plan image capture
Build Totals
-
Total meterage installed
-
Total number of joints installed
-
Total time spent on site
Build Team Supervisor Sign Off
-
Supervisor Signature
-
Has all the work been completed today?
-
I can confirm that all information provided is accurate to the installation works undertaken