Title Page

  • Site conducted

  • Site Name

  • Job Number

  • Conducted on

  • Prepared by

  • Site Manager

  • Site Foreman

  • Amount of operatives on site during inspection

  • https://docs.google.com/spreadsheets/d/1i6AURMew4FrCyyKaDf7EMZbLn4o5AGtIZ7StzGJZHJo/edit#gid=0

Site Entrance, Boundary and Security

  • Is there a "Danger Construction Site" sign on the site boundary or gate

  • Is the boundary around the site suitable for the traffic and people around the site

Tools and Machinery

  • Machinery and tools on site during inspection

  • https://docs.google.com/spreadsheets/d/1i6AURMew4FrCyyKaDf7EMZbLn4o5AGtIZ7StzGJZHJo/edit#gid=1847056469

  • Is there an inspection within the last 7 days for each machine

  • https://eu.jotform.com/table/210142252750038

  • Are the operators of each machine certified to use the machine

  • https://docs.google.com/spreadsheets/d/e/2PACX-1vRlfa1WJZOy7zIDqeRUvvtnzTYM9qpLVOTfilQDuo62l-B_gVqAnebpqgsS6qh0LOX982w0Hmh3ul2E/pubhtml?gid=2001018710&single=true

  • Are the machines in good order on visual observation

Welfare and PPE

  • Is there a WC available to site operatives

  • Is the WC maintained in a clean condition

  • Is there a supply of water for washing

  • Is there soap or other suitable means of washing or sanitizing

  • Is there a supply of wholesome drinking water readily available

  • Is there a rest facility to provide shelter from wind and rain.

  • Is the current use of PPE by operatives proportional to the hazards

Hazard ID

  • Groundworks

  • Excavations

  • Use of Machines

  • Condition of Machines

  • Use of MEWPS

  • Condition of MEWPS

  • Lifting Operations

  • Netting

  • Safety Rails

  • Scaffolding

  • Cladding

  • Roofing

  • Concreting

  • Dust

  • Asbestos

  • Underground Services

  • Overhead Power Lines

  • Traffic Management

  • Housekeeping

  • Weather

  • Fire

  • COSHH

  • Waste and Skips

  • Electricity

  • Noise

  • Vibration

  • Confined space

  • Edge Protection

  • Hot works

  • Bonfire

  • Pollutants

  • Working near water

  • Zoonosis

  • Young Person

  • Ladders

Working at height

First Aid and Emergency

  • Is there a first aider on site

  • Current First Aiders

    Craig Holland
    Jeremy Wallen
    Paul Carpenter
    Steve Lyon
    Wayne Baker
    Dragos Spinu
    Dale Cartlidge
    Roger Carpenter
    Philip Battishill
    Graham Moyes
    Matt Case
    Steve Ellis
    Tom King
    John Nott
    Zach Morris

  • Is there a first aid kit on site

  • Is the CPP with emergency plan on site

  • Is there a MEWP emergency plan on site

CPP | RAMS | Sub Contractors | Training

  • Is there a construction phase plan in place for this job

  • https://eu.jotform.com/table/212363834611047

  • Is there a risk assessment on site for all activities

  • https://docs.google.com/spreadsheets/d/e/2PACX-1vRlfa1WJZOy7zIDqeRUvvtnzTYM9qpLVOTfilQDuo62l-B_gVqAnebpqgsS6qh0LOX982w0Hmh3ul2E/pubhtml?gid=2001018710&single=true

  • Are there any sub contractors on site

  • Has PQQ been complete on this Subcontractor

  • Have all Subcontractors been inducted with evidence

  • Have all Subcontractors received or supplied a risk assessment for their work

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.