Title Page
Site Specific Safety Plan Form
BASIC SAFETY RULES
-
Are employees trained on the use of the STAC form?
-
are daily safety meetings being conducted?
-
Are employees trained on accident / incident reporting?
-
Are employees trained on how to fill out the accident / incident form?
-
Are employees trained on Corning Canton safety rules?
Drug & SUBSTANCE ABUSE PROGRAM
-
Are employees entered in the substance abuse program (tested) before starting work?
-
Is a facility selected to provided testing as required for the duration of the project?
-
Has a drug and substance abuse policy been created
LIFE SAFETY PROCEDURES
-
Who will author the Life Safety Plan for the job location?
-
Has a plan been created?
-
Does the plan address evacuation routs and gathering locations?
-
Does the plan address shelter in place
-
Does the plan assign responsibilities to individuals (management, supervision, employees)
HAZCOM
-
Are employees trained in hazard communication/GHS?
-
Did employees receive site specific HAZCOM training?
-
SDS provided to Contractor, and a copy easy to obtain at job site?
-
Storage and use meets all Contractor, NFPA, Fed and State Regulations?
FALL PROTECTION
-
Will fall protection be required?
-
Are employees trained on the Corning requirement to use fall protection at four (4) feet?
-
Competent/qualified person to perform system and equipment inspections, identify hazards, and anchor points as needed?
-
Are employees trained on how to recognize fall hazards?
-
Has a fall protection rescue plan been accomplished?
BARRICADES
-
Will barricades be used to protect employees from fall hazards?
-
Who will be responsible for ensuring barricades are properly installed and remain effective
-
Are employees trained in the use of Yellow Caution tape and Red Danger tape?
-
Are employees trained on the use and hazards associated with the placement of Radiation Danger tape?
ELEVATED WORKING PLATFORMS
-
Are employees trained in the use of elevated working platforms?
-
Do employees know the 4 foot or shorter length requirement for lanyards?
-
Are employees trained on fall protection use?
-
Do employees know the requirement to use PFAS when working from a scissor lift?
LADDERS
-
Will ladders be required?
-
Are employees trend on the proper use of ladders?
-
Are employees trained on the Corning 10foot max working height for steep ladders?
-
Will scaffolding be required?
-
Who will perfume the daily inspection of scaffolding?
Vehicles
-
Are employees trained on the proper use of vehicles and mobile equipment?
-
Do employees know how to complete the daily inspection sheet
OVERHEAD LIFTING, RIGGING, & MOBILE CRANES
-
Do employees have Signal Person training?
-
Do employees have the required rigging training from a third party certifier?
-
Are crane inspections current and a copy filed with the PM?
-
Are operators trained and licensed?
-
will rigging plans be accomplished before the lift?
-
Are rigging plans submitted to Corning at least five (5) days before the lift
PERSONAL PROTECTIVE EQUIPMENT
-
PPE to be utilized on this project? What type?
-
Will any special PPE be required?
-
Have employees received training for special PPE requirements? (high visibility clothing, safety glasses, hard hat, safety toe boots)
-
Will respirators be worn on a voluntary use? (Half mask, paper, etc.)
WORK PERMITS:
-
Will Hot Work permits be required?
-
Will any excavation permits be required?
-
Will any Confined Space Entry permits be required?
-
Will any Fire System Sprinkler/Alarm Out-of-Service Permits be required?
LOCKOUT/TAG OUT (LOTO)
-
Will LOTO be conducted?
-
Are LOTO procedures available?
-
Has a responsible person been assigned for overseeing LOTO requirements?
EXCAVATIONS
-
Will any work activities involve excavations greater than four feet?
-
Will a trench box/shoring be needed?
-
Does fencing/barricade need to be installed?
-
Type of equipment to be brought onsite? (Gas, diesel, etc.)
CONFINED SPACES
-
Will any confined space work be performed
-
Have affected personnel been trained
-
how will confined space recuse be conducted
-
If the space is identified as permit required, will a permit be issued?
-
Are employees trained on permit required confined space?
LADDERS/SCAFFOLDING
HOT WORK
-
Are hot work activities to be performed? (Any flame or spark producing task.)
-
Will any special PPE be required?
-
Will fire blankets/protective shields/screens be required?
-
Fire watch personnel have received the required training?
POWDER ACTUATED TOOLS
-
Operators trained in operations?
PAINTING, ADHESIVES, EPOXIES
-
Quantity and job type of sealant to be applied on this job?
-
Will this require off-hours application?
-
Additional exhaust or fans needed during application/curing time?
-
Special PPE/precautions for this job?
COMPRESSED GAS:
-
Will cylinders be brought on site?
-
Plan for safe use and storage on site?
FLAMMABLE GASES/LIQUID
-
Will any flammable gases and/or liquids be used?
-
Provisions for their storage have been made?
-
Appropriate containers utilized? (Safety can, original container)
-
Secondary containment and spill kits required?
SIGNS, SIGNALS, AND BARRICADES
-
Will yellow or red barricade tape be used? (Barricades will be built in accordance with Contractor policy)
-
Will perimeter barricades be used?
-
Will any caution/danger signs be needed?
-
Will flammable gas/liquid labels be needed?
-
Will material labels be needed? HMIS or NFPA
FALL PROTECTION, LEADING EDGE
POWERED INDUSTRIAL FORK TRUCKS/MAN LIFTS/BOOMS:
-
Will any mobile powered equipment be required? Type to be brought on site?
-
Operators trained/certified for operations of equipment?
-
Plan for fuel transfer/storage or battery changes?
ROOF WORK
-
Will roof access be required?
-
Materials on roof will be secured to prevent "blow offs"?
-
Chemicals or flammable/combustible materials going on roof?
CRANES & RIGGING
-
Will crane operations be required?
-
Will any special lifting devices be needed?
-
Will any special lifting devices be needed?
-
Will any Critical Lifts take place?
-
Has all rigging equipment been inspected?
-
Equipment is appropriate for the task(s)?
-
Have all required safety inspections been completed?
-
Will traffic control be provided (pedestrian & vehicular)?
WASTE MANAGEMENT
-
Plan for waste disposal in place?
-
Characterization, containerization, segregation, storage and disposal requirements understood?
-
Plan for water/wastewater discharges in place? (Describe or attach plan)
-
Spill plan in place?
-
Special permit(s) needed? Type?