Information
Canopies UK After Installation Report (ID132 JUN13)
-
Customer Name
-
Location
-
SO Number
-
Date of Installation
-
Inspection conducted on
-
Installed By:
- Dave Bolton
- Stuart Hazell
- David Marshall
- Andrew O Toole
- Steven Proctor
- Steven Webster
- Rob Wells
- Brian Douglas
- Other
- William Clough
- Mick Barnes
- Chris Bolton
- Steve Holt
- Billy Hulston
-
Prepared By
- Ste Wruk - Commercial Sales Representative
- Shaun Barnes - Installation Manager
- Billy Hulston - Installation Supervisor
- Brian Clark - Commercial Sales Representative
- Adam Stevenson - Commercial Sales Representative
- Peter Evans - Commercial Sales Representative
- Other
Contract information and Checks
Contract Information and Checks
-
Is the Height To Underside the same as contract (or any changes authorised by the office/customer)?
-
X = beam
P = post
V = vertical bracket
Snb = Swan neck bracket -
Bay Sizes on Contract.
-
Are the bay sizes Installed the same as above (or changes have been authorised by the office/customer)?
-
What are the bay sizes Installed?
-
Have changes to contract been authorised by the office?
-
Have changes to contract been authorised by the customer?
-
Are the foundation sizes correct as visible from the re-instate?
-
Have all component's been fixed by the correct method to specification and are all fixings tight?
Installation Quality Checks
Installation Quality Checks
-
Are all components of good quality?
-
Is the steelwork of good quality and free from chips?
-
Are the roof sheets installed correctly (no overlapping visible)?
-
Is the area free from concrete dust and debris?
-
Is the canopy completely capped/tipped/bunged?
-
Are the gutter brackets spaced out at 800mm (or below) centres?
-
Are there a minimum of 3 down-pipe clips per down-pipe?
-
Is the canopy level?
Service
-
Is the customer happy with the canopy?
-
Is the customer happy with the sales service they have received?
-
Is the customer happy with the installation service received?
-
Canopy Installation Pictures