Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Contractor on site
SITE DETAILS
-
Asbestos Removal Contractor
-
Site Supervisor
-
Contracts Manager
-
Analytical Consultant
-
On Site Analyst
-
Principle Contractor
-
Site Manager
-
Asbestos Task
- Removal
- Encapsulation
- Environmental Clean
- Non Asbestos Works
-
Asbestos Material
- Sprayed Coating
- AIB
- Insulation
- Cement
- Textured Coating
- Gaskets & Rope
- Floor Tiles
-
Asbestos Type
- Amosite
- Chrysotile
- Crocidolite
- Actinolite
- Anthophylite
- Tremolite
-
Job Notified?
-
ASB5 expiry date?
DOCUMENTATION
-
Does the analyst have a method statement, risk assessment, COSHH on site?
-
Analysts guide HSG248 on site?
-
Analyst company in-house procedures on site?
-
Has a site specific risk assessment been carried out?
-
Is there appropriate COSHH assessments on site for all materials where this is required?
-
Is there the facility to provide copies of paperwork to parties on site?
PERSONNEL DOCUMENTATION
-
Analyst Name
-
CSCS
-
P403 / P404
-
Face fit for RPE in use
-
Site induction
-
Fibre Counting
-
Analyst Name
-
CSCS
-
P403 / P404
-
Face fit for RPE in use
-
Site induction
-
Fibre Counting
-
Analyst Name
-
CSCS
-
P403 / P404
-
Face fit for RPE in use
-
Site induction
-
Fibre Counting
HEALTH AND SAFETY
-
Is there a risk assessment on site to negate any PPE?
-
Are hard hats being worn on-site?
-
Is high visibility clothing worn on-site?
-
Are all operatives wearing adequate foot protection?
-
Are all disposable overalls worn on site category 5/6 type 3?
-
Has the analyst been trained in Safe Work at Height?
SITE SETUP
-
Has the analyst set up appropriate site lab?
-
Has a background air test been carried out in the site lab in the last 14 days?
-
Can the analyst demonstrate the set up of a microscope?
-
Can the analyst demonstrate mounting of a filter?
-
Has the analyst media blanked filters that are being used?
CALIBRATED EQUIPMENT
-
Microscope (serviced) - Ref I.D
-
In Calibration?
-
Stage Micrometer - Ref I.D
-
In Calibration?
-
NPL test slide - Ref I.D
-
In Calibration?
-
High Flow Meter - Ref I.D
-
In Calibration?
-
Low Flow Meter - Ref I.D
-
In Calibration?
-
Tally Counters - Ref I.D
-
In Calibration?
-
Barometer - Ref I.D
-
In Calibration?
-
Thermometer - Ref I.D
-
In Calibration?
-
Timer - Ref I.D
-
In Calibration?
NON CALIBRATED EQUIPMENT
-
Does all relevant equipment have a valid PAT test?
-
Does the analyst have an adequate number of high flow pumps to carry out suitable air monitoring?
-
Does the analyst have a low flow (personal) pump?
-
Does the analyst have and adequate number of cowl heads to carry out suitable air monitoring?
-
Does the analyst have an acetone vaporiser?
-
Does the analyst have a calculator?
-
Does the analyst have adequate supplies of slides, cover lips and filters?
-
Does the analyst have spare equipment in case of emergencies? (Fuses 3A/13A, bulbs, mask filters?)
-
Does the analyst have sufficient acetone/triacetin?
MONITORING
-
Does the analyst demonstrate knowledge of the site operations?
-
Have background air tests been run in the work area previous to asbestos removal being carried out?
-
Has the enclosure been smoke tested?
-
Have leakage air tests been run around the enclosure throughout the shift?
-
Have leakage air tests been run on the transit route?
-
Has a personal air test been conducted during each shift?
FOUR STAGE CLEARANCE
Stage 1 - Preliminary Site Check
-
Has the ARC site supervisor signed clearance paperwork confirming the area is ready for 4SC?
-
Has the analyst checked the plan of work to ensure the outlined tasks have been completed?
-
Has the analyst produced a plan of the site? (enclosure including dimensions, airlock, baglock, transit/waste routes, skip, DCU)
-
Has the analyst checked the DCU is intact operable and clean?
-
Has the analyst checked the transit/waste route?
-
Has the analyst checked the enclosure integrity?
-
Has the analyst checked the enclosure from the exterior ensuring is it ready for stage 2?
-
Has all contaminated waste been removed from the work area?
-
Has the stage 1 section of site paperwork been filled in correctly by the analyst allowing for any caveats?
Stage 2 - Visual Inspection
-
Is the analyst wearing app appropriate PPE/RPE?
-
Has the analyst followed correct procedure to enter the enclosure?
-
Does the analyst have a torch?
-
Does the analyst have a screwdriver/chisel?
-
Is the analyst accompanied by a member of the ARC?
-
Is the enclosure dry and free of sealant?
-
Are all remaining ACM's adequately encapsulated?
-
Has the entire of the enclosure been accessed and visually inspected?
-
Have the airlocks/baglocks been visually inspected?
-
Has the stage 2 section of site paperwork been filled in correctly by the analyst?
Stage 3 - Clearance Air Test
-
Has the analyst removed all non essential work items from the enclosure?
-
Have all the NPU's and vacuum's been turned off and capped?
-
Have the correct number of samples been taken for the volume of the enclosure?
-
Has a disturbance been carried out using a brush? (1.5 minutes per pump up to a max of 5 mins)
-
Has the analyst set up their pumps correctly?
-
Has the stage 3 section of the site paperwork been filled in correctly by the analyst?
Stage 4 - Final Assessment
-
Are all personnel in the vicinity of the enclosure being dismantled wearing correct PPE.
-
Have all the previously inaccessible areas been accessed following the dismantling of the enclosure, as far as is reasonably practicable?
-
Has the waste/transit route been inspected following removal of enclosure material?
-
Is there any waste or plant that has not been removed from the work area?
Q.C.
-
Any comments, i.e. is the ceiling grid clean? Are surroundings cable trays clean? Are voids sealed? Etc
-
Recommendations
-
Auditor
-
Supervisor