Information
-
Document No.
-
Apartment Number
-
Conducted on
-
Audited By
- Joe Johnson
- Asa Bartlett
- Graham Lawton
- Garry Turner
- Jamie Middleton
- John Maughan
- Dan Baker
Information
-
Do the Combined Services Layout Radiator positions correspond with the Solid Eight Module Setting out Layout Radiator positions?
-
Do the Builders Work Holes correspond with the Drainage Plans?
-
Does the Kitchen Layout work with the run out route from the stack?
-
Is there sufficient space for the Washing Machine and Acoustic Boxing to Soil Pipe where applicable?
Builders Work
-
AGD Builders Work Holes in Slab correspond with Layout Drawing?
-
Shuttering removed from sides and cover loose?
First Fix Drylining
-
1st Side Board Complete to allow Domestic Drops to be fitted
-
HIU Cupboard fully boarded?
-
HIU Cupboard Taped and Jointed: Walls, Corners and Ceiling Joint?
-
Sheer Wall Dot and Dabbed
-
Corners of Walls behind RWP'S Boarded
-
Where applicable, has the Elevation been boarded in line with the Column to allow Bath and Shower Valve to fitted.
Pattresses
-
AGD Pattress
-
Rainwater Pattress
-
HIU Pattress
-
UF Heating Manifold Pattress
-
Radiator Patresses
-
Shower Patresses
Dry Lining related Builders Work
-
Letter Box for MCWS
-
Letter Box or Open Front for HIU Access
Housekeeping
-
All Rooms Clear or Extraneous Material and Debris
-
Acceptance
- Accepted
- Not Accepted
Sign Off and Acceptance
-
Imtech Representative
-
Shepherd Construction Representative (Block Manager)