Inspection
Date of Survey
Name of Surveyor
Site Address
Petrol Company
Site Contact / Phone number
Type of new equipment to be installed
Give manufacturer of existing equipment
Survey information
Will special equipment be required to remove existing machine etc, if yes state type of equipment, if fork lift truck, crane, skates and jacks etc, and duration of hire
Services give size and position from the entrance end of the wash bay
- Photo
- Notes
Is there an air supply to the wash bay
- Photo
- Notes
Type of air compressor or supply
- Photo
- Notes
- Number
Where is the air compressor situated
- Photo
- Notes
- Number
Water pump type and position
- Photo
- Notes
- Number
Water tank size and where is it situated
- Photo
- Notes
- Number
Doors
Has the wash bay got doors
- Yes
- No
- N/A
Wash bay dimensions
Bay length
- Photo
- Notes
- Number
Bay width
- Photo
- Notes
- Number
Bay height
- Photo
- Notes
- Number
Entrance door width
- Photo
- Notes
- Number
Entrance door height
- Photo
- Notes
- Number
Exit door width
- Photo
- Notes
- Number
Exit door height
- Photo
- Notes
- Number
Condition of wash pad, if tracks air to be welded a hot works permit may be required
- Photo
- Notes
Work required to install an under chassis wash
- Photo
- Notes
Position and type of drainage in wash bay
- Photo
- Notes
Position and type of lights in wash bay
- Photo
- Notes
Give details of any plinths or ducts, and any additional building works required
- Photo
- Notes
Machine control
Give position of new Codax pedestal
- Photo
- Notes
Give position of new euro terminal
- Photo
- Notes
Give position of PV panel
- Photo
- Notes
Give location of stop
Are side screens / splash screens required
- Photo
- Notes
- Number
Are other safety devises IE narrow bay
- Yes
- No
- N/A
Electric supply to wash bay
- Photo
- Notes
Electrical supply to site size and location
- Photo
- Notes
Work required to update electrical supply
- Photo
- Notes
Re-use options
Reuse equipment
- Photo
- Notes
Summary of survey
Summary and additional information
- Photo
- Notes
- Number
Actions required, responsibility and completion date
- Photo
- Notes
- Table