Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Scope of work being performed on the job during the audit?
-
Audit performance level?
- Excellent
- Acceptable
- Unacceptable
CDCC Non- Negotiable
-
All Non-Negotiable items met?
- Yes
- No
- N/A
-
Job Personnel Count
-
OSHA 300 forms complete and posted from February 1 - April 30?<br>
-
Orientation being performed and logs on file?
-
OSHA and DOL posters posted?
-
Emergency phone numbers posted?
-
Tool box safety talks log up to date?
-
Subcontractor Safety Manuals on site.
-
SDS filed?
-
Work areas properly signed and barricaded?
-
Visitor vest and hard hats available?
HOUSEKEEPING
-
Work areas neat?
-
Projecting nails or screws bent over or removed?
-
Waste containers provided and used?
-
Passageways and walkways clear?
-
Restroom Facilities adequate?
FIRE PREVENTION
-
Adequate fire extinguishers, checked and accessible?
-
Phone no. of Fire Department posted?
-
Large quantity Flammables protected with proper extinguisher?
-
Extinguishers tagged and in date?
ELECTRICAL
-
Extension wires with bare wires or missing ground prongs taken out of service?
-
Ground fault interrupters being used?
-
Terminal boxes equipped with required covers?
-
Temporary Lights are up to code?
-
Electrical Control Rooms Secured
-
Lockout/Tagout devices available and being used?
-
Temporary Lights installed correctly? Maintain 8' from the floor where possible.
-
Electrical Dangers Posted?
HAND, POWER & POWDER ACTUATED TOOLS
-
Hand tools cord in proper shape?
-
Hand tools inspected regularly?
-
Guards in place on machines?
-
Proper PPE used when operating tools?
-
Correct tool being used for job at hand?
-
Operators of powder actuated tools licensed?
Steel Work
-
Personnel Tied off as needed at 6' per our Non- Negotiable state.
-
Designated Decking Zone clearly identified? no more than 90' x 90' in perimeter and flagged appropriately.
-
Perimeter protection in place as needed? or Fall arrest systems in place.
Roofing
-
Fire extinguishers in place near Kettle & on roof when utilizing torches.
-
Materials stored away from roofs edge?
-
Kettle Watch in place?
-
Warning line in place and following proper OSHA guidelines?
-
Roofers tied off outside of warning line system?
-
Proper access barricades in place around entrance and egress above grade level?
FALL PROTECTION
-
Safety rails and cables secured properly? Shackles are applied appropriately? Flagged every 6' with high visibility tape?
-
Safety harnesses worn properly? and ties to a proper anchorage point?
-
Employees exposed to fall hazards tied off 100%?
-
Employees below protected from falling objects?
LADDERS & STAIRS
-
Ladders extended at least 36" above landing?
-
Ladders are secure to prevent slipping, sliding or falling?
-
Ladders with split or missing rungs taken out of service? Ladders have all load and warning sticker per OSHA regulations?
-
Stepladders used in fully open position?
-
Ladders being used properly?
-
Stairway has handrail and guardrails?
-
Ladder or stairs used when a break in elevation of 19" or more or barricade put in place?
SCAFFOLDING
-
All scaffolding inspected daily? Tags or Competent person sign off in place?
-
Erected on sound rigid footing and all scaffolding has base plates? Sound level ground and soil has proper compaction?
-
Tied to structure as required above 20' with proper tensile strength?
-
Guardrails, intermediate rails, toe boards and screens in place?
-
Planking is sound and sturdy? So that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).
-
Mobile scaffold has proper locking casters? Proper 4:1 base ratio and outriggers in place?
-
Cross braces are complete?
-
Proper access provided? Ladder fixed to the structure?
-
Employees below protected from falling objects?
FLOOR & WALL OPENINGS
-
Column Diamond covered or protected?
-
All floor openings planked over or barricaded?
-
Perimeter protection in place?
-
Deck planks secure?
-
Materials stored away from edge? 2' or greater.
TRENCHES, EXCAVATION & SHORING
-
Competent person identified and present?
-
Excavations are shored and sloped back? Soil type identified? trench boxes in place for trenches over 5' to 19' ? Engineered controls in place?
-
Materials are stored at least 2' away from trench?
-
Ladders provided every 25' in trench?
-
Equipment is at a safe distance from edge of trench or excavation?
-
Proper utilities are labeled and identified?
-
Trenches are flagged/protected with guardrails as needed?
MATERIAL HANDLING
-
Materials properly stored or stacked?
-
Employees using proper lifting techniques?
-
Tag lines used to guide loads?
-
Proper number of workers for each operation?
WELDING AND BURNING
-
Gas cylinders stored upright?
-
Proper separating distances between fuels & oxygen or fire wall at 5 1/2' in place?
-
Goggles or shields used?
-
Fire extinguishers readily available?
-
Hoses in good condition?
Mechanical Lifts
-
Aerial Operators trained and certified?
-
Controls Clearly marked?
-
Lift platform door/chain closed?
-
Fall protection used as required by our CDCC non-negotiable?
-
Reverse alarms in proper working condition?
-
Is equipment in good condition?
CRANES
-
Outriggers extended and swing radius barricade in place?
-
We have a copy of the annual inspection as well as a 30-60 inspection?
-
Riggers Certifications are on file?
-
Crane operator logs up to date?
-
Employees kept from under suspended loads?
-
Chains and slings inspected and tagged as required?
CONCRETE CONSTRUCTION
-
Rebar Caps in place to prevent impalement?
-
Employees are protected from cement dust?
-
Exposed skin covered?
-
Washout station used and maintained?
-
Proper Silica protocols in place and Engineered Controls used?
-
Silica Safety manual updated and on site?
PERSONAL PROTECTIVE EQUIPMENT
-
Hard hats being worn?
-
Safety glasses being worn?
-
Hearing protection being worn when required?
-
Respirators used when required? Proper respirator documentation available?
-
Gloves are worn when needed?
-
Traffic vests or high visibility clothing material being worn?
Site Appearance
-
Site entrance and signage up to CDCC standards?
Hazard Communication
-
Proper PPE being utilized?
-
All chemicals stored in approved containers and proper location with containment used when needed?
-
Employees trained on hazards with materials they are using?
-
Safety Representative