Title Page
-
Quality check sheet
-
Casu Consulto Techrete inspection
-
GMI Dakota Manchester
-
Conducted on
-
DB
-
Techrete
Pre install inspection
-
Structural opening correct?
-
Frame in good condition, unmarked and correct size?
Frame installation
-
Membrane applied to standards?
-
Membrane joints taped?
-
Fixings as per drawing?
-
Frame fitted square and centre to opening?
-
Mullion seals done and checked?
Glazing
-
Check gaskets prior to glazing
-
Panels in square?
-
Kite mark consistent location
-
Pressure plates applied to correct torque.
-
Capping square and equally spaced?
-
Labels removed?
-
External frame protection tape removed?
-
Internal Glass protection applied?
-
Frame fitted in good condition external
-
Frame fitted in good condition Internal
-
Casu supervisor
-
GMI supervisor
-
Notes / Comments