Title Page

  • Quality check sheet

  • Casu Consulto Techrete inspection

  • GMI Dakota Manchester

  • Conducted on

  • DB

  • Techrete

Pre install inspection

  • Structural opening correct?

  • Frame in good condition, unmarked and correct size?

Frame installation

  • Membrane applied to standards?

  • Membrane joints taped?

  • Fixings as per drawing?

  • Frame fitted square and centre to opening?

  • Mullion seals done and checked?

Glazing

  • Check gaskets prior to glazing

  • Panels in square?

  • Kite mark consistent location

  • Pressure plates applied to correct torque.

  • Capping square and equally spaced?

  • Labels removed?

  • External frame protection tape removed?

  • Internal Glass protection applied?

  • Frame fitted in good condition external

  • Frame fitted in good condition Internal

  • Casu supervisor

  • GMI supervisor

  • Notes / Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.