Title Page
-
Building
-
Area
-
Zone
-
Works
-
Certa Manager
Installation
Installation Works
-
Type of works
-
Adhesion tests
-
Primer onto Concrete slab
-
Self adhesive VCL
-
Install PU Adhesive
-
Install Enetherm PIR Insulation Board
-
Install heat activated (torch on) underlay
-
Install torch on Cap sheet
-
Evidence
-
Instalation of continuous Galv 80x50mm
-
Instalation of continuous Galv 130x50mm
-
Installation of Galv cleat
-
Installation of support bracket
-
Install Mullion
-
Install louvre blades
-
Install coping
-
Install drip
-
Check Critical Interfaces
-
Close out snagging from tracker
-
Permascreed
-
Peel Test
-
Check substrate & Primer
-
Check Upstand Heights
-
Check Gutter formation & Rainwater Outlets.
-
Check Primary layer
-
Check Permaflash-R
-
Check secondary layer
-
Check Protection layer
-
Check Critical Interfaces
-
Detail Work
-
Electronic Integrity Testing
-
Check insulation
-
Check Water control layer
-
Check Sedum roof, temp irrigation and Paving
-
Close out snagging from tracker
-
Check Area free from damage & surplus material
-
Acceptance of Sub Structure
-
Materials Checked Before Use
-
Client Set Out Gridlines & Datum
-
Primer
-
VCL
-
Install Z angle
-
Install L angle
-
Install Cladding panel
-
Check Line and level
-
Close out snagging from tracker
-
Check Area free from damage & surplus material
Snagging
Snagging
-
Have any Snags been identified?
-
Photo
-
Have Snags been Rectified?
-
Photo
Senior Manager QA Checks and Handover
Certa QA Manager Final (or Senior Certa Manager) Inspection
-
Have all items on QA form been filled in?
-
Have any 3rd party test or inspection reports been carried out?
-
Is area snag free and ready for handover?
-
Have final QA checks been carried out?
-
Is area ready for handover?
Handover
-
On behalf of Certa Roofing and Cladding LTD
-
Signature
-
On behalf of TD
-
Signature