Caustic Bladder and Pipeline THURSDAY PSM
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Pump bunds standpipe inspections and samples
-
PH of liquid inside standpipe 1.
-
PH of liquid inside standpipe 2.
-
PH of liquid in standpipe 3.
Southern and Northern drain pH test
-
PH of liquid inside Southern Drain.
-
PH of liquid inside Northern drain.
-
Is PH higher than 9 in either of the drains? If yes notify team leader and escalate to Environmental Team.
Bladder liner and roof checks.
-
All weights/ballast on both bladder #1 and #2 are in place and in good condition?
Thursday PSM Check/ Pipeline Integrity
Ship to Bladder Pipeline.
-
Check pipeline for evidence of leaks and corrosion.
-
Check pipe supports are not corroded/ broken.
-
Are flange covers fitted on all flanges, No evidence of crystalized caustic around flanges.
-
Is pipeline free of vegetation, material and dirt/carry back build up?
-
Check All welds for evidence of rust.
Bladder to Site Day tank pipeline.
-
Check pipeline for evidence of leaks and corrosion.
-
Check pipe supports are not corroded/ broken
-
Are flange covers fitted on all flanges, No evidence of crystalized caustic around flanges.
-
Is pipeline free of vegetation, material and dirt/carry back build up?
-
Check All welds for evidence of rust.