CWI Thermabead installation

  • Conducted on

  • Prepared by

  • Location

Untitled Page

  • Pre Front elevation images (showing all parts of elevation)

  • front elevation pre install images (bore scope)

  • front elevation mid install images: borescope, injection holes and injection gun in wall

  • front elevation complete images (showing all parts of the elevation clean and made good)

  • Pre Rear elevation images ( showing all parts of elevation)

  • rear elevation pre install images (bore scope)

  • rear elevation mid install images: borescope, injection holes and injection gun in the wall

  • rear elevation complete images (showing all parts of elevation clean and made good)

  • Pre left elevation images (showing all parts of elevation)

  • left elevation pre install images (borescope)

  • left elevation mid install images: borescope, injection holes and injection gun in wall)

  • Left elevation complete photos (showing all parts of elevation clean and made good)

  • pre right elevation photos (showing all parts of elevation)

  • right elevation pre install images (borescope)

  • right elevation mid install images (borescope, injection holes and injection gun in the wall)

  • right elevation complete images (showing all parts of elevation clean and made good)

Additional notes

  • Additional job information

Job complete sign off

  • Clients signature

  • Operatives signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.