Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Signature

Unit 1 Cems shack

  • Nitrogen Check bottle pressure

  • Was bottle changed

  • 36 ppm nox check bottle pressure

  • Was bottle changed

  • 21% O2 check bottle pressure

  • Was bottle changed

  • 272 ppm nox check bottle pressure

  • Was bottle changed

  • 450 ppm co check bottle pressure

  • Exhaust heat trace ok

  • Sample line temp.

  • Room temperature deg. F

Unit 1 Aux. building / outside rounds

  • Hydraulic starter level

  • Hyd starter temp

  • TLO level

  • TLO temp degrees f

  • fin/fan no leaks

  • Ice make up air unit

  • Gas heater pilot on

  • gas heater glycol level

  • Oily waste tank u1

  • gas analyzer working

  • fire suppression nitrogen pressure

  • gas analyzer helium bottle pressure

  • gas analyzer cal bottle pressure

  • Night shift drain air compressor receiver

  • ambient temperature lean to degrees C

  • Co2 fire system valve locked open

  • fire system valves locked open

  • inspect filter house

  • glycol head tank level

  • transformer 1MVA level

  • transformer 1 MVA temp.

  • lube oil pressure

  • GLO tank level

  • night shift update safety sign

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.