Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Tools at height are secured from fall and/or the work zone is controlled below
-
A written plan is in place for controlling tools/equipment at height (checklist, HRA, SWP).
-
The work area is prepared as per the written plan above.
-
All materials or loose items are secured on the elevated work site.
-
Travel routes have been considered in planning and controlling.
-
Carrying pouches are designed for controlling tools/materials at height.
-
When not in use, "at height" tools are secure or removed.
-
If applicable, hording/meshing is in a condition to prevent dropped objects (no gaps, secure, in good condition etc.).<br>