Title Page

  • Client / Site

  • Contract No

  • Start Date

  • Prepared by

  • Location

FORM 18

  • Instructions:
    -------------------------------------

    1. Answer "Yes", "No", "N/A" for the questions below.
    2. Fill out required fields and answer other questions as needed.
    3. Add photos and notes by clicking on the paperclip icon.
    4. To add a Corrective Measure, click on the paperclip icon then choose "Add Action". Provide a description, assign it to a member, set priority and set the due date.
    5. Complete the audit by providing a digital signature.
    6. Share your report by exporting as PDF, Word, Excel or Web Link.

RISK ASSESSMENT

  • notes.JPG
  • Risk After Control Measures Guide:

    severity.JPG
  • Are there any overhead electricity cables within the site?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Are there any other overhead cables within the site?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Are there any other overhead obstructions (trees, bridges, gantries etc)?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Is planning to be carried out > 100mm?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Are any other excavations required?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Has consideration been given to controlling pedestrians/ public?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Has a safe access and egress been identified?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Has a holding area been identified for delivery vehicles?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Are there any restrictions on vehicle access or safe operation?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Is any access required to property?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Are any permits to work required?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Has an approved traffic management company been assigned?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Has traffic management been planned in accordance with the site requirements?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Have all required subcontractors been approved by Support Services?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Have subcontractors provided us with an adequate method statement and risk assessments for their works?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Are any slip/trip/fall hazards present?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Are any other works being carried out within the site?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Are there restrictions on the hours of working for the site?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Is the work to be carried out at night? If so has consideration been given to suitable lighting?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Are there any requirements for additional banksmen?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Have the induction arrangements been identified and arranged?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

  • Are there any other hazards which are not listed above?

  • Who is at Risk?

  • How is the risk to be controlled ?

  • Risk After Control Measures

  • Severity

  • Probability

  • Risk

COMPLETION

  • Supervisor's Name and Signature

  • Foreman's Name and Signature

  • Assessment Carried out By :

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.