Information
-
Document No.
-
General Contractor
-
Job Name
-
Prepared by
-
Type of Work Being Performed
-
Approximate Number of Employees on Site
-
Conducted on
-
Location
-
Personnel
Personal Protective Equipment
-
Standard PPE (hard hat, safety glasses, vest, boots, gloves)
-
Job specific PPE required
-
Hearing Protection
-
Foot Protection
-
Proper clothing
-
First Aid Kit on Site
Hand and power tools
-
Tool condition
-
Proper guards and handles
-
GFCIs are in place on all temporary power supplies
-
Use of proper tool for the task being performed
-
Layout of cords, hoses, lines, cables
Aerial Lifts
-
Are aerial lifts on site
-
Are they currently in use
-
Is employee wearing proper fall protection and tied off
-
Ground clear of obstructions
-
Over head hazards removed or accounted for
-
Pre shift inspection completed
-
Equipment manual is with the equipment
-
Weight limitations are posted
-
Fire extinguisher on equipment
-
Is fire extinguisher inspection up to date
-
Stability
-
Are there wind concerns
Fall Protection
-
Is personal fall protection currently in use
-
Is employee tied off to an approved anchor point
-
Is the correct type of lanyard being used
-
Is employee properly tied off to prevent contact with ground if a fall was to occur
-
Is harness properly worn and fitted
-
Was harness inspected prior to use
-
Have individuals been trained on personal fall protection systems and proper implementation
-
Is fall protection currently in use
-
Warning Line System Set No Less Than 6 Feet From The Roofs Edge
-
Safety Monitoring System
-
100% Tie Off
-
Guard Rail system
Hot work / Fire prevention
-
Is there hot work taking place
-
Hot Asphalt
-
Condition of kettle
-
Has kettle operator been trained
-
Kettle operators name
-
Fuel Tanks stored properly/securely
-
Is a portable fire extinguisher immediately available at the work area where the hot work is taking place
-
Stored fuel is at least 20' from kettle
Crane
-
Is our crane on site? If so, which one?
-
Has the operator been identified?
-
Is operator certified
-
Certification reviewed
-
Is lift plan required for load being lifted
-
Has the person rigging for the crane been identified?
-
Has the crane, as well as the path of travel been flagged off?
-
Has lift plan been completed, approved and available for review
-
Signal man/women has been identified
-
Communication method has been stablished and is acceptable
-
Hand signals
-
Radio communication
-
Other
Motorized equipment
-
Do we have any motorized equipment on site? If so, what types?
-
Has the operator been trained
-
Is the machine being used for it's intended purpose
-
Is there a fire extinguisher near by
-
Are guards in place
-
Is the warning line system set up to reflect the use of rooftop motorized equipment (10' from roofs edge in the direction of travel, 6 feet on all other sides)
Forklift
-
Do we have a Forklift on site?
-
Is operator certified
-
Has the operator been identified?
-
Has annual inspection been completed and inspection decal visible
-
Load chart is in equipment and available for review
-
Is there a fire extinguisher on the equipment
-
Fire extinguisher has been inspected and is in good conditiono
Electrical
-
Is electrical power being used
-
Has power source been identified
-
Permanent source
-
Temporary source
-
Are power cords in use
-
Have power cords been inspected and in good condition
-
Are they of the correct gauge and type
Scaffolds
-
Is scaffolding on site
-
Is scaffolding currently in use
-
Is daily inspection sheet complete and available for review
-
Was daily inspection sheet reviewed
-
Railings / guardrails on scaffolding are in place and in good condition
-
Cross members / supports are in place and in good condition
-
Stability of scaffolding
-
Climbing rungs
-
Wheels are locked and secured
-
Scaffolding is secured (top and bottom)
-
General condition of equipment
Ladders
-
Are ladders on site
-
Are they currently in use
-
Is ladder secured
-
Ladder is set up at 4:1 angle
-
Top of ladder extends 3' above landing
Type of Work Being Done
-
Roofing
-
Single Ply
-
Built-Up
-
Metal
-
Shingles
-
Detail work
-
Tear Off
-
Lay-Up
-
ACM Panels
-
Metal
-
Audit Completed By
Additional comments and photos
-
Add media