Information

  • Document No.

  • General Contractor

  • Job Name

  • Prepared by

  • Type of Work Being Performed

  • Approximate Number of Employees on Site

  • Conducted on

  • Location
  • Personnel

Personal Protective Equipment

  • Standard PPE (hard hat, safety glasses, vest, boots, gloves)

  • Job specific PPE required

  • Hearing Protection

  • Foot Protection

  • Proper clothing

  • First Aid Kit on Site

Hand and power tools

  • Tool condition

  • Proper guards and handles

  • GFCIs are in place on all temporary power supplies

  • Use of proper tool for the task being performed

  • Layout of cords, hoses, lines, cables

Aerial Lifts

  • Are aerial lifts on site

  • Are they currently in use

  • Is employee wearing proper fall protection and tied off

  • Ground clear of obstructions

  • Over head hazards removed or accounted for

  • Pre shift inspection completed

  • Equipment manual is with the equipment

  • Weight limitations are posted

  • Fire extinguisher on equipment

  • Is fire extinguisher inspection up to date

  • Stability

  • Are there wind concerns

Fall Protection

  • Is personal fall protection currently in use

  • Is employee tied off to an approved anchor point

  • Is the correct type of lanyard being used

  • Is employee properly tied off to prevent contact with ground if a fall was to occur

  • Is harness properly worn and fitted

  • Was harness inspected prior to use

  • Have individuals been trained on personal fall protection systems and proper implementation

  • Is fall protection currently in use

  • Warning Line System Set No Less Than 6 Feet From The Roofs Edge

  • Safety Monitoring System

  • 100% Tie Off

  • Guard Rail system

Hot work / Fire prevention

  • Is there hot work taking place

  • Hot Asphalt

  • Condition of kettle

  • Has kettle operator been trained

  • Kettle operators name

  • Fuel Tanks stored properly/securely

  • Is a portable fire extinguisher immediately available at the work area where the hot work is taking place

  • Stored fuel is at least 20' from kettle

Crane

  • Is our crane on site? If so, which one?

  • Has the operator been identified?

  • Is operator certified

  • Certification reviewed

  • Is lift plan required for load being lifted

  • Has the person rigging for the crane been identified?

  • Has the crane, as well as the path of travel been flagged off?

  • Has lift plan been completed, approved and available for review

  • Signal man/women has been identified

  • Communication method has been stablished and is acceptable

  • Hand signals

  • Radio communication

  • Other

Motorized equipment

  • Do we have any motorized equipment on site? If so, what types?

  • Has the operator been trained

  • Is the machine being used for it's intended purpose

  • Is there a fire extinguisher near by

  • Are guards in place

  • Is the warning line system set up to reflect the use of rooftop motorized equipment (10' from roofs edge in the direction of travel, 6 feet on all other sides)

Forklift

  • Do we have a Forklift on site?

  • Is operator certified

  • Has the operator been identified?

  • Has annual inspection been completed and inspection decal visible

  • Load chart is in equipment and available for review

  • Is there a fire extinguisher on the equipment

  • Fire extinguisher has been inspected and is in good conditiono

Electrical

  • Is electrical power being used

  • Has power source been identified

  • Permanent source

  • Temporary source

  • Are power cords in use

  • Have power cords been inspected and in good condition

  • Are they of the correct gauge and type

Scaffolds

  • Is scaffolding on site

  • Is scaffolding currently in use

  • Is daily inspection sheet complete and available for review

  • Was daily inspection sheet reviewed

  • Railings / guardrails on scaffolding are in place and in good condition

  • Cross members / supports are in place and in good condition

  • Stability of scaffolding

  • Climbing rungs

  • Wheels are locked and secured

  • Scaffolding is secured (top and bottom)

  • General condition of equipment

Ladders

  • Are ladders on site

  • Are they currently in use

  • Is ladder secured

  • Ladder is set up at 4:1 angle

  • Top of ladder extends 3' above landing

Type of Work Being Done

  • Roofing

  • Single Ply

  • Built-Up

  • Metal

  • Shingles

  • Detail work

  • Tear Off

  • Lay-Up

  • ACM Panels

  • Metal

  • Audit Completed By

Additional comments and photos

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.