CPCCCO3041A Place concrete

Unit Descriptor
This unit of competency specifies the outcomes required to place concrete into prepared formwork or foundations to establish a strong base for further building work.
The unit includes calculating the volume of concrete required for the concrete pour, moving concrete from truck to pour location, and placing and screeding concrete.

Elements and Performance Criteria

1 Plan and prepare.

1.1 Work instructions, work health and safety (WHS) requirements and other information relevant to the work are identified, confirmed and applied for planning and preparation purposes.

1.2 Plant, tools and equipment consistent with job requirements are selected and checked for serviceability, and faults are rectified and reported before work begins.

Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.