Information

  • Student Name

  • Site/Company Name

CPCCCO3041A Place concrete

  • Unit Descriptor
    This unit of competency specifies the outcomes required to place concrete into prepared formwork or foundations to establish a strong base for further building work.
    The unit includes calculating the volume of concrete required for the concrete pour, moving concrete from truck to pour location, and placing and screeding concrete.

Elements and Performance Criteria

  • 1 Plan and prepare.

  • 1.1 Work instructions, work health and safety (WHS) requirements and other information relevant to the work are identified, confirmed and applied for planning and preparation purposes.

  • 1.2 Plant, tools and equipment consistent with job requirements are selected and checked for serviceability, and faults are rectified and reported before work begins.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.