Title Page
-
CF-SITE-AUDIT Version 1 Revision 1 Dated 05/07/2022
-
Conducted on
-
A55 raised by
-
Location
-
Build Town Ref
-
PDP
-
DP #
-
A55#
-
Chamber Type / Pole Reference
-
Contractor
-
Chamber 1 Description
-
Chamber 2 Description
-
Blockage Location:
- Tarmac
- Grass
- Concrete
- Gravel
- Unmade Ground
-
No. of Blockages in a Section
-
Blockage Distance from Chamber 1 (m)
-
Blockage Distance from Chamber 2 (m)
-
Unidentified Distance in case of 2 Blockages in a section (Distance B/W 2 Blockages) (m)
-
Duct Reference:
-
X and Y
-
Duct Length (m)
-
Any TM Required?
-
Is the duct section on a red route or bus lane?
-
Is the duct section on a cycle lane?
-
Number of Bores:
-
Number of cables currently in bore:
-
Current capacity of bore:
-
Rods used:
- 6mm
- 9mm
- 11mm
- 14mm
- 25mm
-
Site Photo from approx 2m away:
-
Rod in Bore:
-
Site photo 2:
-
Rod in receiving bore:
-
"X" and "CF" sprayed to mark blockage:
-
"X" and "CF" sprayed to mark blockage No 2 if Exist:
-
Any additional photos:
-
Any additional comments