Information
-
Document No.
-
Audit Title
-
Employer/Builder
-
Employer Representative/ Phone Number/ Position
-
Site Address
-
Conducted on
-
Prepared by
Entry Permit
Entry Permit
Name(s) of authorised representative of the Construction, Forestry, Mining and Energy Union of Workers -
-
Date of entry -
-
Project address -
-
Entry under (tap to select) -
-
Was entry refused or delayed? (s 501 of the FW Act)
-
Have you been hindered or obstructed while exercising any rights? (s 502 of the FW Act)
-
So far as is reasonably practicable, the particulars of the suspected contravention to which this notice relates are -
-
Signed -
-
Signed -
Incident Report
Incident Report
-
Date/Time of Incident -
-
Principal Contractor -
-
Sub-Contractor -
-
Health and Safety Representative -
-
Incident Type (tap to select) -
- Access/Egress
- Air Quality
- Amenities/Hygiene
- Asbestos
- Chemicals
- Concrete Pumps
- Confined Spaces
- Consultation
- Core Drilling/Concrete Cutting
- Cranes
- Demolition
- Dust
- Earth Moving Equipment
- Electrical
- Emergency Procedures
- Engineering
- EWP's
- Falls
- Fatigue
- Fire
- Forklifts
- Formwork
- Housekeeping
- Lifts/Hoists
- Lighting
- Manual Handling
- Noise
- Piling
- Plant
- Power/Hand Tools
- Pre-cast/Tilt-up Panels
- Pre-stressing/Post-tensioning
- Radiation
- Rigging
- Scaffolding
- Supervision
- Synthetic Mineral Fibres
- Traffic Management
- Training
- Trenching/Excavation
-
Primary Cause (select one) -
- Fine
- Windy
- Raining/Wet
- Low Light
- Extreme Cold
- Extreme Heat
-
Secondary Cause (select one) -
- Access/Egress
- Air Quality
- Amenities/Hygiene
- Asbestos
- Chemicals
- Concrete Pumps
- Confined Spaces
- Consultation
- Core Drilling/Concrete Cutting
- Cranes
- Demolition
- Dust
- Earth Moving Equipment
- Electrical
- Emergency Procedures
- Engineering
- EWP's
- Falls
- Fatigue
- Fire
- Forklifts
- Formwork
- Housekeeping
- Lifts/Hoists
- Lighting
- Manual Handling
- Noise
- Piling
- Plant
- Power/Hand Tools
- Pre-cast/Tilt-up Panels
- Pre-stressing/Post-tensioning
- Radiation
- Rigging
- Scaffolding
- Supervision
- Synthetic Mineral Fibres
- Traffic Management
- Training
- Trenching/Excavation
-
Description of Incident -
-
Photos
-
Medical Treatment Required (select one) -
-
Has the regulator been notified?
-
Did an Inspector attend site?
-
Were any notices issued?
-
Weather Conditions (select one) -
- Fine
- Windy
- Raining/Wet
- Low Light
- Extreme Cold
- Extreme Heat
-
Was the task classed as high risk construction work?
-
Was there a safe wok method statement prepared for the work?
-
Was the safe work method statement being followed?
-
Outcomes/Corrective Actions -
Management Responsibilities
Site Requirements
-
Photo of site signage -
-
Is signage displayed on ALL sides and clearly visible from outside the workplace? (Building Services (Registration ) Regulations 2011 WA)
-
Does it display;
-
The principal contractor's name and telephone contact number, Including after hours?
-
The location of the site office?
-
The presence of hazardous chemicals?
-
Is the site secured to prevent unauthorised access? (Section 21 Occupational Safety & Health Act 1984)
-
Are hazards isolated in the event of unauthorised entry occurring?
-
Have workers been site inducted? (Section 19 Occupational Safety & Health Act 1984)
-
Are induction records kept on site available for viewing?
-
Do all workers on site hold general construction induction cards?
-
Are all visitors inducted into site-specific risks?
-
Have necessary permits been obtained and are available on site? (Council, EPA, Regulator, Traffic etc)
Management Responsibilities
-
Has a OSH Management Plan been prepared for the workplace before commencement?
-
Does the plan include;
-
Names, positions and responsibilities of all persons with OSH duties at the workplace?
-
Arrangements for consultation, co-operation and co-ordination at the workplace?
-
Arrangements for managing any work health and safety incidents that occur?
-
Site-specific safety rules, and arrangements for ensuring all persons are informed?
-
Arrangements for collecting, assessing and reviewing SWMS?
-
Are safe work method statements prepared for high risk construction work? Meaning of “high risk construction work”<br><br>In this Chapter, high risk construction work means construction work that:<br>(a) involves a risk of a person falling more than 2 metres, or<br>(b) is carried out on a telecommunication tower, or<br>(c) involves demolition of an element of a structure that is load-bearing or otherwise related to the physical integrity of the structure, or<br>(d) involves, or is likely to involve, the disturbance of asbestos, or<br>(e) involves structural alterations or repairs that require temporary support to prevent collapse, or<br>(f) is carried out in or near a confined space, or<br>(g) is carried out in or near:<br> (i) a shaft or trench with an excavated depth greater than 1.5 metres, or<br> (ii) a tunnel, or<br>(h) involves the use of explosives, or<br>(i) is carried out on or near pressurised gas distribution mains or piping, or<br>(j) is carried out on or near chemical, fuel or refrigerant lines, or<br>(k) is carried out on or near energised electrical installations or services, or<br>(l) is carried out in an area that may have a contaminated or flammable atmosphere, or<br>(m) involves tilt-up or precast concrete, or<br>(n) is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians, or<br>(o) is carried out in an area at a workplace in which there is any movement of powered mobile plant, or<br>(p) is carried out in an area in which there are artificial extremes of temperature, or<br>(q) is carried out in or near water or other liquid that involves a risk of drowning, or<br>(r) involves diving work.
-
Are SWMS readily accessible and set out in a way that is easy to understand?
-
Are arrangements in place to ensure SWMS are complied with?
-
Is high risk construction work performed in accordance with SWMS?
-
Has work been stopped immediately and resumed only in accordance with the SWMS?
Consultation
-
Are there methods for consultation in place? (s.19(1)(c) Occupational Safety & Health Act 1984)
-
Are workers being consulted about ALL matters affecting their health & safety?
-
Is there an up to date list of HSR's displayed?
-
Have HSR's requested and completed training within 12 months of making request?
-
Is there a site safety committee? (s.36 Occupational Safety & Health Act 1984)
-
Is at least half of the committee made up of workers not nominated by the Main Contractor
-
Are names displayed in a prominent place?
-
Are minutes from safety committee meetings posted at the workplace?
-
Are HSR's and/or safety committee being notified and included in incident investigations? (s.33 (1)(b) Occupational Safety & Health Act 1984 )
-
Are health & safety concerns being addressed and closed out?
-
Are regular safety walks being conducted? (s.33(1)(a) Occupational Safety & Health Act 1984)
-
Are any Provisional Improvement Notices (PIN) issued by HSR's displayed in a prominent place?
-
Has the Improvement Notice been complied with in the specified time? (s.51 AG of the Occupational Safety & Health Act 1984)
Amenities/First Aid
Amenities
-
Are there adequate amenities for all workers on site? (Section 3.20 Occupational Safety & Health Regulations 1996)
-
Are amenities hygienic, ventilated and well lit? (Section 3.15 Occupational Health & Safety Regulations 1996)
-
Is there 1m2 available to seat each worker at one time? (Code of Practice First Aid Facilities services Workplace Amenities and Facilities )
-
Are there enough toilets to suit 1 per 10 males? (Building Code Australia BCA)
-
Are there enough urinals to suit 1 per 20 males, or 600mm of trough each? (Building Code Australia BCA )
-
Are there enough toilets to suit 1 per 10 females? (Building Code Australia BCA )
-
On multi-storey buildings are toilets located on at least every third floor? (EBA Provisions)
-
Are toilets clean, hygienic, well lit and easily accessible?
-
Are there enough hand-washing basins provided (Section 2.2 Occupational Safety & Health Regulations 1996)
-
Do workers have easy access to cool, clean drinking water? (Section 3.16 Occupational Safety & Health Regulations )
-
Are workers required to change in and out of clothes?
-
Are change rooms clean, hygienic and well lit?
-
Are change rooms a comfortable temperature for workers to change in?
-
Is there enough seating for workers to get changed?
-
Does the work undertaken require showers to be supplied?
-
Is there at least 1 shower for every 10 workers?
-
Do showers have a clean, slip-free surface?
-
Is there a floor area of at least 1.8m2?
-
Is there a dressing area containing a seat and hooks?
-
Does every shower have a lockable door?
First Aid
-
Is there adequate first aid facilities at the workplace? (Section 3.12 Occupational Safety & Health Regulations 1996)
-
Are first aid locations clearly signed and marked?
-
Are there enough trained first aiders as per risk assessment
-
Do workers have an effective means of communicating with first aiders such as 'nurse calls'?
-
Is there a first aid room? (Section 3.12 (2) Occupational Safety & Health Regulations 1996 )
-
Is the room hygienic, ventilated and well lit?
-
Is there adequate first aid equipment?
-
Is there an Automated External Defibrillator (AED) on site?
-
On multi-storey buildings is there a first aid kit on every second floor?
-
Is the first aid kit regularly checked and restocked?
-
Are first aid records kept on site?
-
Are first aiders and witnesses to serious incidents provided with counselling services?
Emergency
Emergency Plan
-
Has an Emergency Plan been prepared and implemented at the workplace? (Section 3.10 Occupational Safety & Health Regulations 1996)
-
Have the workers been consulted on the preparation of the Emergency Plan?
-
Does the site have;
-
An effective response to an emergency?
-
Is there a Fire Warden Structure on site? (AS 3745-2010, 5.7)<br>
-
Are there backup procedures in place in the event key personnel are absent or effected? (AS 3745-2010, 5.6.5)
-
Is anyone assigned to check areas to determine all people have been evacuated? (AS 3745-2010, 4.2.6.1)
-
Are there restrictions on plant, machinery and vehicular movement during an emergency? (AS 3745-2010, 4.2.19)
-
Are there multiple or alternate assembly areas in the event the primary mustering point is unsuitable? (AS 3745-2010, 4.2.6.5)
-
Evacuation procedures? (Section 3.10 Occupational Health & Safety Regulations 1996 )
-
Is there an Evacuation Diagram posted in prominent places at a height between 1200mm and 1600mm above the ground? (AS 3745-2010, 3.5)
-
Does the Evacuation Diagram contain;
-
An accurate pictorial representation of the floor area? (AS 3745-2010, 3.5.5a)
-
The title 'EVACUATION DIAGRAM'? (AS 3745-2010, 3.5.5b)
-
The 'YOU ARE HERE' location? (AS 3745-2010, 3.5.5c)
-
The designated exits marked in green? (AS 3745-2010, 3.5.5d)
-
Fire extinguishers, hose reels, blankets, and hydrants marked in red? (AS 3745-2010, 3.5.5)
-
The location of assembly areas? (AS 3745-2010, 3.5.5m)
-
A legend reflecting all the symbols and colours used? (AS 3745-2010, 3.5.5n)
-
Processes for notifying emergency services?
-
Provisions for medical treatment and assistance?
-
Effective communication between the Main Contractor and all persons at the workplace?
-
Frequency for testing of emergency procedures?
-
Information, training and instruction for ALL workers in relation to implementing emergency procedures?
-
Has the emergency plan been maintained to ensure it remains effective?
Emergency Preparedness
-
Is all fire fighting equipment operational and free from obstructions?
-
Are extinguishers to suit Class A,B & C fires, located on each storey at every exit? (BCA Part E1.9)
-
Have extinguishers been tested at regular 6 month intervals? (AS 1851-2012, 1.11.1)
-
Are signs installed 2m above floor level showing the location of extinguishers? (AS 2444-2001, 3.3.4)
-
Are extinguishers mounted at a height of 1200mm maximum to the top and at least 100mm above the ground? (AS 2444-2001, f3.2)
-
Are extinguishers protected from aggressive environments such as sun, UV, wind, rain, dust or vibration? (AS 2444-2001, 3.9)
-
If the building has reached 12m, are the required hydrants and hose reels installed except the 2 uppermost storeys? (BCA Part E1.9)
-
Are required booster connections installed? (BCA Part E1.9)
-
Is there emergency backup lighting at a level of 20 lux for at least one hour? (c40-d i & AS 3012-2010, 2.7.3)
-
Is there battery backed up emergency evacuation signage in the event of power failure? (AS 3012-2010, 2.7.3)
-
Have ALL workers been trained to use fire fighting equipment on site? (c43-1c & AS 3745-2010, 6.3.3)
Traffic Management
Traffic Management
-
Is there a site Traffic Management Plan in place? (AS 1742.3-2.2.2)
-
Does the plan include;
-
Details of the works to be undertaken, impacts on the surrounding traffic and how those impacts will be addressed?
-
Separation for pedestrians and moving vehicles? (Section 3.22, 3.6, 3.7,Occupational Safety & Health Regulations 1996 )
-
A Traffic Control Plan, where public and pedestrian traffic is affected?
-
Has the TCP been prepared by a suitably trained person?
-
Does it contain a diagram showing signs, devices, speed zones and pedestrian routes?
-
Are signs and devices set out as per the TCP?
-
Are traffic controllers required where changes to conditions affect traffic and pedestrians?
-
Are "PREPARE TO STOP" and "TRAFFIC CONTROLLER AHEAD" signs in place? (AS 1742.3, 3.5.2)
-
Do traffic controllers have certification from an RMS approved training course? (AS 1742.3, 4.10.6)
-
Are there an adequate number of traffic controllers to control one lane and one direction of traffic each? (AS 1742.3, 4.10.1)
-
Do traffic controllers have a clear escape route for emergencies?
-
Do traffic controllers have visual, audible communication with each other? (AS 1742.3, 4.10.2)
-
Are speed limits no more than 60km/h for a minimum of 150m? (AS 1742.3, 4.10.4)
-
Are traffic controllers wearing high visibility clothing? (AS 1742.3, 4.10.2)
-
Do traffic controllers have adequate breaks of 15 minutes every 2 hours, to manage fatigue? (AS 1742.3, 4.10.5)
-
A Vehicle Movement Plan for movement within the site? (Section 3.6 Occupational Safety & Health Regulations 1996 )
-
Does the VMP contain a diagram showing signs, devices, travel paths, entries and exits as well as loading and unloading bays?
-
Requirements for vehicles on site, including maintenance, warning devices, guards and communication?
-
Review procedures for changing site conditions?
-
Is the plan being implemented and followed?
-
Are adequate safety barriers installed? (AS 1742.3, 2.4.5)
-
Are barriers installed as per manufacturers specifications and Australian Standards? (AS 3845, 2.4)
-
Are barriers inspected regularly to check for tampering, vandalism and damage? (AS 3845, 2.5)
-
Do non-rigid systems have protection to stop people or vehicles entering the deflection zone? (AS 3845, 4.2)
-
Are water-filled barriers fully filled as per manufacturers specifications?
-
Is there an exclusion zone set up to allow for the barrier deflection as per the manufacturers specifications?
Work Environment
Site Security
-
Is the site fully fenced to restrict unauthorised access? (AS 4687-2007)
-
Is the fencing stable both under normal and adverse conditions? (AS 4687-2007, 1.3)
-
Is temporary fencing installed within the boundaries of the worksite? (AS 4687-2007, 1.3)
-
Is fencing installed no more than three degrees out of plumb? (AS 4687-2007, 3.3)
-
Are all components in good condition and maintained to prevent injury to public? (AS 4687-2007, 1.4)
-
Are maximum infill spaces of mesh no bigger than 75mm? (AS 4687-2007, 2.1)
-
Are braces, counterweights and base plates installed as necessary? (AS 4687-2007, 2.1.7)
-
Are additional braces installed where signs or shadecloth have been installed? (AS 4687-2007, 3.7)
-
Baseplates are installed in a manner that doesn't provide a trip hazard or obstruct pedestrians? (AS 4687-2007, 3.8)
-
Are hoardings installed?
-
Is plywood a minimum of 12mm thick and painted? (AS 4687-2007, 2.2)
-
Has an engineer designed, inspected and signed off the hoarding? (AS 4687-2007, 2.2.4)
-
Have fences and hoardings been installed as per manufacturers recommendations and by a competent person? (AS 4687-2007, 3.1)
-
Are protections in place to prevent collision with the fence or hoarding? (AS 4687-2007, 3.2)
Personal Protective Equipment
-
Have workers been supplied with appropriate PPE? (Section 19 (d) (e) of the Occupational Health & Safety Act 1984, Division 2 Occupational Safety & Health Regulations 1996 )
-
Have other control measures been implemented to reduce the amount of PPE needed? (Section 3.32 Occupational Health & Safety Regulations 1996 )
-
Have workers been consulted about the need for and type of PPE supplied?
-
Have workers been trained in the use and maintenance of the PPE? (Section 3.34 Occupational Safety & Health Regulations 1996 )
-
Is the PPE suitable for the work, size, fit and comfort of the worker? (Section 3.34 (1) (b) Occupational Health & Safety Regulations 1996 )
-
Is storage provided for PPE?
-
Is the PPE maintained, repaired and replaced as needed?
Work Areas
-
Is there safe access and egress to and from work areas, both under normal conditions and an emergency? (Section 3.8 Occupational Safety & Health Regulations 1996 )
-
Are there walkways to separate workers from moving plant?
-
Are access routes free of obstructions and stored materials?
-
Is access to and from work areas adequately lit to a minimum of 40lux? (AS/NZS 3012-2010, 2.7.1)
-
Are work areas adequately lit to a minimum of 160lux? (c40-d,i & AS/NZS 3012-2010, 2.7.1)
-
Is there enough space for workers to carry out work without risks to heath and safety?
-
Are the location of exits clearly marked and are there signs showing directions to exits posted?
Hazardous Work
-
Has a risk assessment been performed for hazardous manual tasks? (Section 3.1 Occupational Safety & Health Regulations 1996 )
-
Has the duration and frequency of the task been assessed?
-
Have any environmental concerns affecting the task or the worker been assessed?
-
Have the systems of work been assessed?
-
Have workers been trained in correct manual handling techniques? (Section 3.1 Occupational Safety & Health Regulations 1996 )
-
Are workers exposed to excessive levels of noise, either 8 hours above 85dB or 140dB peak? (Section 3.45 Occupational Safety & Health Regulations 1996 )
-
Is exposure to noise being managed in accordance with the hierarchy of control?
Electrical
Electrical (AS/NZS :3012 Division 6 Occupational Safety & Health Regulations 1996 )
-
Is electrical equipment regularly tested and tagged? (AS/NZS 3012-2010, 3.1)
-
Are records kept of all testing and tagging? (AS/NZS 3012-2010, 3.1)
-
Does wiring have protection against mechanical damage? (AS/NZS 3012-2010, 2.5.3)
-
Are switchboards readily accessible and protected from damage? (AS/NZS 3012-2010, 2.3.1.1)
-
Are switchboards marked so as to identify the source of supply? (AS/NZS 3012-2010, 2.3.1.1)
-
Are distribution boards located so no leads need to be run between levels? (AS/NZS 3012-2010, 2.3.1.2)
-
Is there suitable protection from damage/weather? (AS/NZS 3012-2010, 2.3.2.1a)
-
Are all live parts protected from contact with workers? (AS/NZS 3012-2010, 2.3.2.1c)
-
Are insulated 'tie bars' fitted for leads? (AS/NZS 3012-2010, 2.3.2.1d)
-
Do boards have lockable, hinged doors and means to hold in the open position? (AS/NZS 3012-2010, 2.3.2.1e)
-
Is there space for safe entry of leads and signage stating 'KEEP CLOSED - RUN ALL LEADS THROUGH BOTTOM'? (AS/NZS 3012-2010, 2.3.2.1e)
-
Are RCD's located inside the box with lockable covers to control resetting by unauthorised persons? (AS/NZS 3012-2010, 2.3.2.1)
-
Is there an accessible isolation switch? (AS/NZS 3012-2010, 2.3.2.1)
-
Are switchboards secured to prevent movement? (AS/NZS 3012-2010, 2.3.3)
-
Are all socket outlets protected by a 30mA RCD? (AS/NZS 3012-2010, 2.4.6.2)
-
Is all wiring protected against mechanical damage? (AS/NZS 3012-2010, 2.5.3)
-
Any suspended wiring is supported by means of a catenary and is suitably marked? (AS/NZS 3012-2010, 2.5)
-
There is no wiring is attached to temporary fence panels? (AS/NZS 3012-2010, 2.5.3)
-
Is temporary construction wiring labelled every 5m? (AS/NZS 3012-2010, 2.5.4)
-
Are leads no longer than 30m? (AS/NZS 3012-2010 T1)
-
Are non-conductive lead stands/hooks in use? (AS/NZS 3012-2010, 2.6.9)
-
No domestic rated power boards are in use? (AS/NZS 3012-2010, 2.6.12)
-
Is all unsafe electrical equipment disconnected or isolated and not reconnected until repaired?
-
Is there an electrical register of all equipment and testing kept on site? (AS/NZS 3012-2010, 3.10)
Working At Heights
Falls From Heights (Division 5 Occupational Safety & Health Regulations 1996 )
-
Has a SWMS has been prepared where a worker can fall 2m or more?
-
Has a risk assessment been performed for all other heights? (Section 3.1 Occupational Safety & Health Regulations 1996 )
-
Is the highest measure in the hierarchy of control being implemented?
-
Are control measures inspected and maintained?
-
Is edge protection securely fixed and installed as per the manufacturers specifications?
-
Is edge protection between 900mm and 1100mm high and contains a mid rail and toe-boards or mesh infill? (AS 4994.3-2010, 4.2.1)
-
Is edge protection positioned no more than 300mm from the outside edge? (AS 4994.3-2010, 4.2.1b)
-
Has the edge protection been inspected and a handover certificate provided? (AS 4994.3-2010, 5.3)
-
Are emergency and rescue procedures in place when using a fall arrest system?
-
Have all relevant workers been trained in the emergency procedures?
-
Have the emergency procedures been tested so that they are effective?
-
Does the installation of anchorage points comply with the manufacturers specifications? (AS/NZS 1891.4-2009)
-
Are warning signs in place highlighting the risk of falls?
-
Are penetrations covered immediately and securely fixed and marked?
-
Is cover strong enough to prevent persons or objects falling through?
-
Is roofing work being performed?
-
Is safety mesh installed as per manufacturers instructions? (AS/NZS 4389-1996)
-
Is mesh lapped 150mm and tied off 4-5 times on each longitudinal wire?
-
Are there control measures in place to minimise the risk of falling objects?
Ladders
-
Are ladders maintained and inspected regularly? (AS/NZS 1892.5-2000, 3.2)
-
Are all ladders rated for industrial use only of at least 120kg? (AS/NZS 1892)
-
Are ladders only used as a means of access and egress?
-
Are ladders secured from movement in all directions? (AS/NZS 1892.5-2000, 2.5)
-
Are ladders installed at the correct angle of 4:1? (AS/NZS 1892.5-2000, 2.3)
-
Are ladders only used on a firm level surface? (AS/NZS 1892.5-2000, 2.4)
-
Does the ladder extend at least 1m above the landing? (AS/NZS 1892.5-2000, 2.6)
-
Are three points of contact maintained at all times? (AS/NZS 1892.5-2000, 2.8)
-
Do trestle ladders have a platform width of at least 450mm?
-
No ladders are used on balconies?
Scaffolding
Scaffolding (Division 7 Occupational Safety & Health Regulations 1996 )
-
Has written confirmation been received from a competent person stating that scaffolding over 4m is complete? (Section 3.72 Occupational Safety & Health Regulations 1996 )
-
Has scaffold been inspected and signed off monthly, or following an incident or any alterations? (Section 3.72 (1) (a)
-
Is sign-off tag displayed in a conspicuous location? (AS/NZS 1576)
-
Are incomplete scaffolds appropriately closed and signage installed to prevent unauthorised access? (Section 3.70 Occupational Safety & Health Regulations 1996 )
-
Has documentation been provided identifying the components and the supplier? (AS/NZS 1576.1-2010, 1.6.1)
-
Have instruction on erection, dismantling, servicing and inspection been provided? (AS/NZS 1576.1-2010, 1.6.1)
-
Does the documentation contain the weight of each component, duty loadings, maximum heights and number of working platforms? (AS/NZS 1576.1-2010, 1.6.1)
-
Are the design installation drawings available on site? (AS/NZS 1576.1-2010, 2.6.3)
-
Is scaffold erected on firm, level surface including the type of soleplates used? (AS/NZS 1576.1-2010, 2.9)
-
Have only compatible components been used? (AS/NZS 1576.1-2010, 2.4)
-
Are mesh/screens installed where objects can fall?
-
Are platforms slip resistant, free of trip hazards, and protected against uplift? (AS/NZS 1576.1-2010, 3.4)
-
There are no gaps in platforms greater than 10mm? (AS/NZS 1576.1-2010, 3.4)
-
Where materials are stored on a platform, there is unobstructed access of at least 450mm? (AS/NZS 1576.1-2010, 3.5)
-
Clear headroom of 1.85m is maintained on platforms? (AS/NZS 1576.1-2010, 3.7.4)
-
Working platforms are installed with transverse slopes of no more than 3 degrees? (AS/NZS 1576.1-2010, 3.8.1)
-
Access platforms installed at longitudinal slope of no more than 20 degrees? (AS/NZS 1576.1-2010, 3.8.2)
-
Has public protection been provided?
-
Is there adequate bracing installed, every third bay the full height of the structure?
-
Are ties at no more than 4m vertical intervals and within 2m of the top?
-
Are guardrailings, toeboards and mesh screens installed wherever a person or object could fall 2m or more? (AS/NZS 1576.1-2010 3.10.2)
-
The gap between the platform and the toeboard is no more than 10mm? (AS/NZS 1576.1-2010, 3.10.2.4)
-
Is there safe access and egress to and from working platforms? (AS/NZS 1576 3.6)
-
Is the gap between the working face of the scaffold and structure less than 225mm? (AS/NZS 1576.1-2010, 3.10.4.1)
-
Is the gap less than 100mm where it is not a working face? (AS/NZS 1576.1-2010, 3.10.4.1)
-
Is the surface of the floor no more than 300mm vertically from the platform? (AS/NZS 1576.1-2010, 3.10.4.2)
-
Are there self-closing access gates/hatches installed at top of ladders? (AS/NZS 1576.1-2010, 3.10.3)
-
Are stretcher stairs installed where required for emergency evacuation? (AS/NZS 1576.1-2010, 2.5.3.3.3)
-
Are ladders/stairs in good condition? (AS/NZS 1892)
-
Are ladders installed at 1:4 and secured against displacement in any direction? (AS/NZS 1892)
Mobile Scaffolds
-
Mobile scaffolds are erected by a competent person?
-
Are they built according to manufacturers specifications?
-
Is scaffold only accessed via an internal ladder?
-
Are wheels locked when in use? (AS/NZS 1576.1-2010, 3.12.1)
-
Are mobile scaffolds only used on a firm level surface? (AS/NZS 1576.1-2010, 3.12.3)
-
Scaffolds are not moved while people are on platform? (AS/NZS 1576.1-2010, 3.12.5)
Formwork
Formwork: (Division 7 Occupational Safety & Health Regulations 1996)
-
Are designer/engineer drawings available on site? (Occupational Safety & Health Regulations 1996 3.79, 3.80 & 3.81 & AS 3610-1995, 2.3)
-
Has an engineer inspected and signed off on any modifications? (AS 3610-1995, 4.2)
-
Is appropriate signage erected to restrict unauthorised entry? (AS 3610-1995, 5.3.3.2)
-
Are installers properly trained to erect formwork using safe methods? (AS 3610-1995, 5.3.3.1)
-
Are braces installed to prevent movement as per manufacturers specifications? (AS 3610-1995, 5.3.4)
-
Are bearers and joists in good condition? (AS 3610-1995, 5.3.5)
-
Is plywood in good condition and labelled with the manufacturers name, the AS, surface quality, grade, bond, and stress grade? (AS 6669-2007, 1.11)
-
Is edge protection installed as soon as possible?
-
Are designated access ways defined?
-
Are work platforms at least 450mm wide?
-
Are penetrations covered immediately, secured and marked? (Section 3.54 Occupational Safety & Health Regulations 1996 )
-
Is access restricted during erection, pours and stripping?
-
Has an engineer signed off before stripping commences? (AS 3610-1995, 2.3)
Jump Forms
-
Is there at least two forms of access and egress to the jump form?
-
Ladders are only used as a secondary means of access and egress or where no other means are practicable?
-
Is there safe access and egress in the event of an emergency including retrieval of injured persons?)
-
Is there adequate lighting (40 lux) for access and egress for the jump form?
-
Is there emergency backup lighting at a level of 20 lux for at least one hour? (AS 3012-2010, 2.7.3)
-
Have emergency procedures including retrieval of injured persons been tested?
-
Have workers been trained in implementing emergency procedures in the event emergency services are unavailable?
-
Does the jump form have adequate fire fighting equipment?
-
Is access to first aid readily available?
-
Are procedures in place to cease jump form work in the event of inclement weather? (AS/NZS :2550)
-
Is there adequate lighting (160 lux) to carry out work in the jump form?
-
Is there sufficient ventilation enabling workers to carry out work safely?
-
Do workers have access to cool, clean drinking water?
-
Do workers have reasonable access to toilets?
Plant & Equipment
Plant ( Part 4 : Divisions 1-4 Occupational Safety & Health Regulations 1996 )
-
Is there a plant register kept on site?
-
Is a copy of the manufacturers specifications available?
-
Does the plant comply with manufacturers recommendations?
-
Is the design registration readily accessible? (Section 3.40 Occupational Safety & Health Regulations 1996 )
-
Plant is only used for the purpose which it is designed?
-
Does the operator/installer have appropriate license/competency?
-
Are log books kept and up to date? (As per manufacturers recommendations )
-
Has a Safe Work Method Statement (SWMS) been prepared for the work?
-
Is the SWMS being followed?
-
Are all controls and instruments clearly labelled, marked and operating correctly - including lights, horn, emergency cutoff, brakes, gauges etc.?
-
Is there a fire extinguisher fitted?
-
Has routine maintenance been performed?
-
Have the major inspections been completed as per the manufacturer's specifications?
-
There are no obvious signs of oil/fluid leaks?
-
Are reverse alarm and warning devices fitted?
-
Is a seat belt fitted and in use?
-
Are controls in place to separate pedestrians from moving plant and machinery?
Power/Hand Tools
-
Are tools being used for their intended purpose?
-
Is adequate storage provided?
-
Are tools in good working condition?
-
Have workers been trained in the correct use of tools? (Section 19 Occupational Safety & Health Act 1984)
-
Are any guards and safety devices fitted and not altered?
Specific Plant Assessments
-
Concrete pumps and placement booms
-
Is there an instruction manual kept with the pump unit which includes; set up procedures, operating instructions, clean out procedures, and maintenance procedures?
-
Is there a logbook kept on the pump and available for inspection?
-
Is the logbook maintained and kept up to date?
-
Does the logbook show daily pre-operation inspections?
-
Does the logbook show routine maintenance inspections?
-
Does the logbook show annual inspections?
-
Is the assessment for service (six year major) current?
-
Has pipeline thickness testing been performed regularly (for single wall)?
-
Is there a procedure for pipe discard (twin wall)?
-
Has the operator received appropriate training, information and instruction for this particular pump?
-
Has the line hand received the same inductions?
-
Are there documented records of worker training and inductions?
-
Are there any outstanding enforcement notices on the concrete pump?
-
For mobile boom pumps, is there a current plant registration? (Section 4.1 Occupational Safety & Health Regulations 1996 )
-
For mobile boom pumps, does the operator hold the relevant High Risk Work Licence (HRWL)?
-
Does the truck have the appropriate fixed compliance plant and/or certification for its use?
-
Is the operator aware of appropriate exclusion zones for electrical conductors?
-
Are warning and operational signs fitted?
-
Is there a warning device fitted that can be operated from the ground near the hopper area?
-
Are there easily accessible emergency stops fitted?
-
Is there easy, safe access onto the pump?
-
Are there any uncontrolled slip, trip, or protrusion hazards?
-
Do the air reservoir tanks have a pressure gauge fitted?
-
Is there a blow off or safety valve fitted on the tanks?
-
Is there an indication that the module mounting bolts are loose or missing?
-
Are there any visible cracks in the chassis or module?
-
Are all the controls for the boom and outrigger operation clearly marked and visible?
-
Are all pressure gauges and controls clearly marked and functional on the control panel?
-
Is there a safety chain, sling or other retaining device fitted to the drop hose and reducer?
-
Does the drop hose comply with the manufacturers specifications?
-
Are all retaining clamps fitted to quick release pipe clamps?
-
Do the clamps appear to be in good condition?
-
Are the clamps marked with their maximum operating pressure?
-
Are high pressure clamps used at the hopper end?
-
Does the pipeline appear to be in good condition?
-
Are there any visible cracks in the boom?
-
Are there any signs that any boom pins are worn or are there missing retainers or keepers?
-
Are there any visible oil leaks?
-
Are there any damaged hydraulic hoses?
-
Are there any exposed moving parts (eg. fans, shafts, pulleys or unguarded gears)?
-
Are the stabiliser legs/outriggers in good condition?
-
Are pads/timbers provider under outrigger feet?
-
Can the outriggers be securely locked in place when the pump is in travel mode?
-
If short legging is used, does the manufacturer allow it and are there written procedures?
-
If there is a risk of collision with the boom is there a procedure to help prevent this?
-
Is a hopper grill in place that provides adequate protection from moving parts?
-
Do the agitator paddles and valve system stop when the grill is lifted?
-
Does the accumulator drop all pressure when the grill is lifted?
-
If compressed air is used for cleaning out the lines, is there a system to indicate when the line is pressurised?
-
Is the dump valve on the blow out head twice the size as the inlet valve?
-
Are controls in place to prevent the sponge ball from becoming a dangerous projectile?
-
Is suitable Personal Protective Equipment (PPE) worn by the operator and the line hand?
-
Is a sufficient and hygienic First Aid kit provided?
-
Is traffic management being conducted in a safe manner?
-
To reduce the risk of hose whip, is there a safety observer in place during pump operation to monitor the level of concrete in the hopper to ensure air is not sucked into the pump system?
-
If the boom is a 32m Daewoo or Everdigm boom, has the issue of boom collapse near the wear plates been addressed?
-
Piling Rigs
-
Are Compliance/ID Plates fitted to the machine?
-
Are load charts fitted inside the cabin?
-
Are the tracks in good condition, with no obvious signs of damage to treads or sprockets?
-
Is cabin kept neat and tidy to allow safe operation?
-
Are all chains fitted with tags identifying Safe Working Loads (SWL's), serial numbers and test dates?
-
Does all other lifting equipment have SWL's, serial numbers and test dates clearly marked?
-
Is there means for effective communication in place between the operator, offsiders, supervisors and others?
-
Is there an effective operational safety zone (OSZ) set up?
-
The equipment is not operating within the "no go zone" near overhead powerlines?
-
Are exclusion zones set up within the OSZ to prevent access to high risk areas?
-
Has a competent person (e.g. Geotechnical Engineer) inspected and signed off prior to works commencing?
-
Hoists
-
Has the hoist been installed as per engineers recommendations?
-
Is the mast plumb with no obvious damage to the mast or rollers?
-
Are the mast ties installed at intervals specified in the operations manual or engineering drawings?
-
Is the hoist power supplied directly from the main switchboard not a sub board? (AS/NZS 3012-2010, Appendix J)
-
Is electrical equipment/cables contained and protected against mechanical damage? (AS/NZS3012-2010)
-
Does the hoist encroach on any "no go zones" for overhead powerlines?
-
Has the operator been trained specifically for the model in operation?
-
Can the operator describe the method required for resetting the overspeed device? (AS 2550.7, 7.2.1)
-
Can the operator describe the procedure for lowering the car in the event of an emergency?
-
Are the make, model, serial number and Safe Working Load (SWL) prominently displayed inside the car? (AS1418.7, 4.7)
-
Does the overspeed safety device have a metal plate fitted that is readily visible and marked with the maximum speed in m/sec, the manufacturer and serial number, and the retest date of the gear? (AS1418.7, 4.5.7.4)
-
Has the daily pre-operational inspection been completed? (AS2550.7, 7.2.2 & 9.2)<br><br>Checks should include;<br>- operating and emergency controls<br>- safety switches and interlocks<br>- structure<br>- cables and wiring<br>- placards, decals, warnings, control markings, operating manuals and logbooks<br>- access provisions<br>- guarding<br>- cleanliness, including build-up of building materials or waste under the platform<br>- freedom of movement of the hoist, including ensuring that there are no external obstructions in the hoists path<br>- items specified by the management
-
Are all safety related problems rectified prior to using the hoist?
-
Is the car free from excessive damage?
-
Is the hoist provided with both normal and emergency lighting? ( AS1418.7, 4.6.2.4)
-
Are the operator controls inside the car, functioning as intended, in good condition, and clearly marked?
-
Are the emergency stops clearly marked and functioning as intended? (AS1418.7, 4.5.9)
-
Are the final limit switches functioning correctly? (AS1418.7, 4.5.14)
-
Is there adequate access to the roof of the car?
-
Is there adequate compliant handrail on the roof? (AS/NZS :1657)
-
Is the floor of the car and all landings free of materials and debris?
-
is the risk of falling objects adequately controlled at each landing?
-
Is the risk of falls adequately controlled at each landing?
Cranes
All Cranes: (Division 4 Occupational Safety and Health Regulations 1996 Section 4.54)
-
Is the crane registered?
-
Are all records kept on site? AS/NZS 2550.1, 6.2)
-
Are regular maintenance checks done by a competent person? (AS 2550.1, 6.2)
-
Does the crane comply with manufacturers specifications and have no modifications or alterations? (AS 2550.1, 6.3)
-
Have daily pre-start checks been completed? (AS 2550.1, 6.1)
-
Are log books completed and up to date? (AS 2550.1, 7.3)
-
Are clearance zones established around the cranes? (AS 2550.1, 4.3)
-
Are no go zones setup for not coming within 6m of powerlines or 3m with a qualified spotter? (c166 & AS 2550.1, 6.19)
-
Are safe systems and procedures in place to avoid collisions with other cranes, people or plant? (AS 2550.1-4.5)
-
Are drivers and dogmen appropriately licensed? (AS 2550.1-6.2)
-
Are there enough doggers to handle the workload?
-
Are wind/weather conditions monitored? (AS 2550.1-6.22)
-
Are emergency procedures in place? (AS 2550.1-6.2)
Mobile Cranes
-
Does the crane have the CraneSafe green sticker displayed?
-
Is the crane setup on firm, level ground rated to take it's load?
-
Is the crane fitted with outriggers?
-
Are they;
-
Set correctly according to the manufacturers recommendations?
-
On pads fully supported by ground?
-
Set to lift all wheels off the ground?
-
Is the proper counter weight being used?
-
Are tag lines used for pick and carry operations?
Vehicle Loading Cranes
-
Is the operator competent?
-
Are stabilisers extended?
-
Are wheels still on the ground?
-
Is tyre pressure correct, as per manufacturers specifications?
Tower Cranes
-
Have pre-erection inspections been completed?
-
Have pre-commissioning inspections been completed?
-
Does crane have CraneSafe green sticker displayed?
-
Is base fully enclosed with 1.8m fencing?
-
Do operators have safe access and egress? (AS 2550.1-6.2)
-
Is the crane remotely operated?
-
Are the following measures in place; (AS 2550.1-6.3)
-
Operator works from a designated area which is close to the crane and can maintain good visibility of the load?
-
Operator remains stationary when the load is in motion?
-
Have doggers to direct the operator whenever the load is out of sight?
-
The remote control is protected from unauthorised use?
Lifting Equipment
-
Is there a register of all lifting equipment?
-
Is the working load limit (WLL) clearly displayed?
-
Is an identification number displayed?
-
Do hooks have operable safety latches fitted?
-
Is the correct lifting equipment being used for the load?
-
Are loads slung correctly and safely?
-
Is equipment stored correctly?
-
Is equipment in good condition and inspected regularly?
-
Are soft slings being used?
-
Are they;
-
Inspected before each use and at least once every three months?
-
Proof load tested every twelve months?
-
Free of external wear, cuts and abrasions?
-
Not discoloured from sunlight, high temperatures or chemical exposure?
-
Fitted with undamaged clear labels or tags?
-
Stored in a clean, dry and ventilated place?
-
Slings are not stored on the ground?
-
No slings in use have knots tied in them or are twisted?
-
Is protection in place on sharp edges?
-
Are there documented lifting procedures in place for special lifts? (AS 2550.1)
Man Boxes (AS 2550.1-6.18)
-
Is the man box registered?
-
Are emergency retrieval plans in place before any workers are lifted?
-
Is the box marked with the safe working load, tare mass and design registration number?
-
Are fall-arrest anchorage points installed?
-
Is the box supplied with lifting slings attached by hammerlocks or moused shackles?
-
Does the work box have an inward opening, self-closing door with a latch to prevent unintentional opening?
-
Is there a first aid cage on site?
-
Does the cage;
-
Only get used to retrieve injured people?
-
Sit within the radius of the crane and is easily accessible?
-
Have clear first aid signage?
-
Have an outward swinging door to allow stretcher access?
-
Have fully enclosed sides to prevent falls?
Hazardous Chemicals
Hazardous Chemicals: (Part 5 Occupational Health & Safety Regulations 1996 )
-
Are hazardous materials correctly labelled? (Part 5 Occupational Health & Safety Regulations 1996 )
-
Are current safety data sheets on site and easily accessible? (Section 5.5 Occupational Health & Safety Regulations 1996 )
-
Is there a hazardous chemicals register kept on site and up to date?
-
Is there signage to warn of hazardous chemical risks?
-
Are there measures in place to contain and manage spills?
-
Is there appropriate fire protection/firefighting equipment for the types of hazardous chemicals on site?
-
Is correct safety equipment/PPE provided, maintained and accessible?
-
Are workers trained and supervised in the correct handling of hazardous chemicals? (Section 19 Occupational Health & Safety Act 1984
Asbestos
Asbestos (Division 4 Occupational Health & Safety Regulations 1996 ) (Code of Practice safe removal of asbestos 2nd edition)
-
Have workers been trained in asbestos awareness?
-
Has asbestos been discovered at the workplace?
-
Have WorkCover been notified of removal?
-
Has an occupational hygienist been engaged?
-
Has a licensed removalist been contracted to remove asbestos?
-
Have workers been trained?
-
Is there an asbestos management plan in place?
-
Does the plan include;
-
Processes for reviewing and keeping the plan up to date?
-
The identification of asbestos or ACM?
-
Reasons for decisions, about the management of asbestos?
-
Procedures for dealing with asbestos emergencies?
-
Information for workers responsibilities, consultation, information and training?
-
Has an asbestos register been prepared for the workplace?
-
Does the register include;
-
Regular reviews and updating?
-
Identification of asbestos or ACM presence?
-
The date on which it was identified?
-
The location, type and condition of the asbestos or ACM?
-
Has an asbestos removal control plan been prepared?
-
Does the plan include;
-
Details of how the work will be carried out including method, tools, equipment and PPE?
-
Details of the asbestos to be removed including location, type and condition?
-
Has a copy has been provided to the principal contractor?
-
Has the site been cleared by occupational hygienists?
-
Is there a clearance certificate on site?
Confined Spaces
Confined Spaces
-
Is work being carried out in confined spaces?<br><br>WHS Regulations 2011 section 5 <br>CONFINED SPACE MEANS an enclosed or partially enclosed space that:<br>(a) is not designed or intended primarily to be occupied by a person, and<br>(b) is, or is designed or intended to be, at normal atmospheric pressure while any person is in the space, and<br>(c) is or is likely to be a risk to health and safety from:<br>(i) an atmosphere that does not have a safe oxygen level, or<br>(ii) contaminants, including airborne gases, vapours and dusts, that may cause injury from fire or explosion, or<br>(iii) harmful concentrations of any airborne contaminants, or<br>(iv) engulfment,<br>
-
Has a risk assessment been done by a competent person? (c66)
-
Have signs been erected before and for the duration of works? (c68)
-
Confined space entry permits have been issued? (c67)
-
Does it;
-
Identify the confined space to be entered?
-
Contain the names of the people entering?
-
Contain the duration of the work to be done?
-
Show measures that are in place based on the risk assessment?
-
Emergency procedures are in place including rescue? (c66)
-
First Aid and rescue procedures have been tested and are effective? (c74)
-
Are flammable gases, vapours or mist monitored? (c72)
-
Is continuous communication with a worker outside the confined space maintained? (c69)
-
Have workers been issued with and trained to use PPE including respiratory equipment? (c75)
Demolition
Demolition
-
Is there any demolition of a structure or part of a structure that is load-bearing?
-
Has WorkCover been notified? (c142)
-
Does the demolition contractor hold the appropriate license?
-
Have the necessary engineer reports been obtained?
-
Is a Demolition Plan in place?
-
Does the plan include;
-
The location of the structure to be demolished?
-
The overall height of the structure and the distance from boundaries?
-
The type of structure, it's supports and materials?
-
The proposed methods of demolition and the types of plant/equipment to be used?
-
The proposed methods for handling and disposing of materials?
-
Proposed methods of controlling access and egress to the workplace?
-
The sequence of works and duration of each?
-
The proposed hoardings, scaffolding and fencing?
-
Traffic management plans?
-
Exclusion zones that are established to protect workers?
-
Essential services have been located and disconnected? (c304)
-
The general condition and effect on neighbouring structures and businesses?
-
Emergency arrangements and rescue plans?
-
Has a copy of the asbestos register been obtained? (c450)
-
Has an occupational hygienist inspected the site? (c451)
-
If asbestos or ACM is present, has it been removed before demolition work commenced? (c451)
-
Has a test been conducted for the presence of lead and other hazardous materials?
-
If there are any present, what are they?
-
Are control measures in place for working with hazardous materials?
-
There is no over-lapping of demolition work and construction?
Excavation
Excavation
-
Are there excavation works taking place?
-
Has current information on underground essential services been obtained? (c304)
-
Does the information contain;
-
The services which may be affected?
-
The location, including depth, of any pipes, cables or other plant?
-
Any conditions on the proposed excavation work?
-
Have workers been provided with the information? (c304)
-
Have the ground/soil conditions been assessed by a competent person?
-
Are control measures in place to stop a person from falling into excavations? (c305)
-
Are preventions in place to stop a person working in the excavation from being struck by a falling object? (c55 & c305)
-
Have tests/monitoring taken place to prevent anyone being exposed to airborne contaminates? (c305)
-
Is the excavation secured to prevent unauthorised access? (c306)
-
Have measures been put in place, such as shoring, benching or battering to prevent collapse? (c306)
Environmental
Environmental
-
Is there an Environmental Management Plan in place? (ISO 14001)
-
Does the plan include;
-
Which licenses, consents and approvals are required?
-
How compliance with environmental legislation will be achieved?
-
Instructions on how contractors must meet obligations?
-
Procedures for dealing with environmental emergencies?
-
Procedures for reviewing and updating the plan?
Water
-
Is there a Water Quality Management Plan in place?
-
Does the plan include;
-
Use of silt fences and traps?
-
Procedures for de-watering including testing and permits?
-
Paint, truck and concrete washouts?
-
Plans for collecting and discharging storm-water and ground-water?
-
Measures to avoid the release of contaminates into waterways/drainage systems?
-
Are controls in use and maintained?
Erosion and Sediment
-
Is there an Erosion and Sediment Control Plan in place?
-
Does the plan include;
-
Use of sediment fences?
-
Measures for controlling stockpiles?
-
Cattle grids and street sweeping to prevent mud and dirt on the roadways?
-
Sediment control barriers/filtration for drains?
-
Stabilisation of soils that will be exposed for more than 28 days?
-
Are controls in use and maintained?
Dust and Air
-
Is there a Dust and Air Quality Protection Plan in place?
-
Does the plan include;
-
Controls so that no dust, fumes, odours or chemical emissions are released beyond site boundaries?
-
Dust suppression measures?
-
Procedures to meet DA requirements and monitoring?
-
Speed limits to lower dust generation?
-
Gravel on haul roads and high traffic areas?
-
Mesh on perimeter fences to act as wind protection and prevent dust from leaving?
-
Maintenance of plant and equipment?
-
Monitoring of vehicle emissions?
-
Covering of loads?
-
Are controls in use and maintained?
Noise and Vibration
-
Is there a Noise and Vibration Management Plan in place?
-
Does the plan include;
-
Work is conducted within work hours as defined by council?
-
Noise emission from plant is kept low? (WHS Regs 59)
-
Workers are not exposed to excessive noise, above 85dB/8h or above 140dB? (c57)
-
Workers are provided with audiometric testing? (c58)
-
Excessive vibration is monitored?
-
Neighbours are contacted about excessive noise and vibration?
-
Are controls in use and maintained?
Waste
-
Is there a Waste Management Plan in place?
-
Does the plan include;
-
Storage areas for separation, collection and recycling?
-
The use of licensed contractors to remove waste?
-
Recycling of materials from the site office?
-
Receipts are kept for disposal of waste?
-
Waste minimisation measures for contractors?
-
Procedures for dealing with contaminated waste?
-
Are controls in use and maintained?
Sign-off
Sign-off
-
Additional Photos
-
Notes
-
Signed off by