Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
All items must be completed All check list must be emailed to Chris Mackenzie If a item can not be done notify either site supervisor and myself Please phone if you have any question about any item
-
Add location
-
Select date
-
Add media
-
Have you installed all Bulkheads plumb/level/straight and at correct height?
-
165 blocks installed to all double walls?
-
Clip off to all trusses to manufactories layout plan?
-
Bottom cord ties to trusses @ every 1800 from birds mouth
-
Bath hob installed?
-
Are all walls plumb and square using a builders square?
-
Are all windows installed? Plumb/ level/ straight. If a double story stack all upper windows in down stairs kitchen on load blocks!!
-
Have all walls been levelled using a straight edge from top plate to bottom plate with no noggins touching straight edge?
-
Are all double studs installed under all load points including load blocks, window studs from upper levels,girder trusses?
-
Have you installed all bracing to the engineering plan?
-
Have you installed all lintels to the engineering plan?
-
Have you installed all noggins and changed of directional noggins to all rooms including alfresco and garage and perimeter?
-
Are all windows in the right location and installed to the right brick gauge or centred?
-
Are sheer blocks installed to all metal angle braces? Internal walls only!
-
Are all l brackets installed to internal walls at every 1800?
-
Are all corner blocks installed?
-
Have you installed hoop-iron to all external posts and garage beams?
-
Are all joist hangers and beam hangers installed where applicable?
-
Are right angle brackets installed?
-
Do down stairs walls line up with up stairs walls?
-
Are all door head heights/ openings correct?
-
Are trl-grips installed to kitchen windows and stair well kdhw sills and heads?
-
Are shower joists clear of waste pipes?
-
Are all rafters for eaves supported back to frame?
-
Have you installed coach screws to all ply bracing less than 600mm?
-
Have you installed downstairs powder room air vent?
-
Are all pt braces installed in correct location with chemset rods?
-
Are all robe noggins installed to correct height ?
-
Have all nothing's in walls installed?
-
Have you installed hand rail /toilet roll noggins?
-
Have you installed drop down showers in correct location and 40mm step down?
-
Have you installed 90x45 lintels to all non load-bearing internal opening over 1800mm?
-
Have you nailed all braces within 150mm of bottom connecting?
-
If a double story have balcony and garage been installed?
-
Has up stairs floor been screwed off completely?
-
Has the balcony been screwed off completely?
-
Has the job been swept out of all dust, nails, papers,rubbish and off cuts placed in bins provided?
-
Has the job been blown out dust free?
-
Has all timber been stacked in to garage on blocks and de- nailed and blocks removed?
-
Are you happy with the job and is it left clean and tidy for the next trade to complete his or her job?
-
Please take photo of finished job swept out!
-
Select date
-
Add signature