Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

All items must be completed All check list must be emailed to Chris Mackenzie If a item can not be done notify either site supervisor and myself Please phone if you have any question about any item

  • Add location
  • Select date

  • Add media

  • Have you installed all Bulkheads plumb/level/straight and at correct height?

  • 165 blocks installed to all double walls?

  • Clip off to all trusses to manufactories layout plan?

  • Bottom cord ties to trusses @ every 1800 from birds mouth

  • Bath hob installed?

  • Are all walls plumb and square using a builders square?

  • Are all windows installed? Plumb/ level/ straight. If a double story stack all upper windows in down stairs kitchen on load blocks!!

  • Have all walls been levelled using a straight edge from top plate to bottom plate with no noggins touching straight edge?

  • Are all double studs installed under all load points including load blocks, window studs from upper levels,girder trusses?

  • Have you installed all bracing to the engineering plan?

  • Have you installed all lintels to the engineering plan?

  • Have you installed all noggins and changed of directional noggins to all rooms including alfresco and garage and perimeter?

  • Are all windows in the right location and installed to the right brick gauge or centred?

  • Are sheer blocks installed to all metal angle braces? Internal walls only!

  • Are all l brackets installed to internal walls at every 1800?

  • Are all corner blocks installed?

  • Have you installed hoop-iron to all external posts and garage beams?

  • Are all joist hangers and beam hangers installed where applicable?

  • Are right angle brackets installed?

  • Do down stairs walls line up with up stairs walls?

  • Are all door head heights/ openings correct?

  • Are trl-grips installed to kitchen windows and stair well kdhw sills and heads?

  • Are shower joists clear of waste pipes?

  • Are all rafters for eaves supported back to frame?

  • Have you installed coach screws to all ply bracing less than 600mm?

  • Have you installed downstairs powder room air vent?

  • Are all pt braces installed in correct location with chemset rods?

  • Are all robe noggins installed to correct height ?

  • Have all nothing's in walls installed?

  • Have you installed hand rail /toilet roll noggins?

  • Have you installed drop down showers in correct location and 40mm step down?

  • Have you installed 90x45 lintels to all non load-bearing internal opening over 1800mm?

  • Have you nailed all braces within 150mm of bottom connecting?

  • If a double story have balcony and garage been installed?

  • Has up stairs floor been screwed off completely?

  • Has the balcony been screwed off completely?

  • Has the job been swept out of all dust, nails, papers,rubbish and off cuts placed in bins provided?

  • Has the job been blown out dust free?

  • Has all timber been stacked in to garage on blocks and de- nailed and blocks removed?

  • Are you happy with the job and is it left clean and tidy for the next trade to complete his or her job?

  • Please take photo of finished job swept out!

  • Select date

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.