Information
-
Chandos project and job number
-
Conducted on
-
Prepared by
-
Current temperature and weather conditions
-
Last day since precipitation
-
Is the Erosion and Sedimentation Control (ESC) Plan in place?
Describe the current construction phase.
-
Add media
-
Add drawing
If "No" is answered to and of the following questions please indicate corrective measures takes.
Site Stabilization
-
Is the site entrance and exit stabilized with gravel and outside of site clean?
-
Add media
-
If a cattle gate is part of the ESC, is it in place and working effectively?
-
Add media
-
Are all earth stockpiles protected from erosion?
-
Add media
-
Are dust control measures being implemented adequately and frequently (water spraying, tackifier, gravel mulch, etc.)
-
Add media
-
Is the site free of washout or overtopping?
-
Add media
Site Stabilization Corrective Actions:
Silt Fences
-
Are silt fences used on site?
-
Is the silt fence installed and trenches in?
-
Add media
-
Is the silt fence in good condition?
-
Add media
Silt Fences Corrective Actions:
Straw Wattles
-
Silt sacks/sediment logs used on site?
-
Is the silt sack/sediment log in good condition?
-
Add media
Straw Wattles Corrective Actions:
Catch Basins
-
Are silt sacks/sediment logs installed at the catch basins?
-
Add media
-
Are all surrounding manholes protected from sediment?
-
Add media
Catch Basin Corrective Actions:
Inspection Comments:
Inspection Sign Off
-
Add signature
-
Add signature