Premises Details
-
Elevation Pictures
-
Customer Name
-
Full Address
-
Telephone Number
Chartered Surveyor Details
-
Name of signatory (Chartered Surveyor)
-
Registration number
-
Name of Company
-
Address including postcode
- 14B Canterbury Walk, Warden Hill, Cheltenham, GL51 3HG
-
Email Address
-
Phone number
On Site Inspection
Failed Insulation
-
Have the cavity walls been insulated ?
-
What material is existing within the wall cavity
- Yellow Mineral Wool Fibre
- White mineral Wool fibre
- White Bonded Bead
- Grey (Carbon) Bonded Bead
- White Foam
- Rockwool
-
What is the Condition of the Material
- The material is in Good Condition
- The existing CWI is in poor condition, Large voids have been sighted and the material in General poor condition
-
Boroscope images of the existing CWI material
-
As a result of a comprehensive Boroscope inspection of the entire property in multiple locations and at varying heights I would recommend the complete extraction of the failed CWI from the wall cavity to all elevations. large voids are present and the material can be evidenced at a low density. This is causing cold spots to which condensation is being attracted internally, encouraging mould growth and creating an unhealthy environment and damaging the internal wall coating and decoration.
-
Internal Property images
-
Mark Knight MRICS DipSurv
-
Declaration
-
Mark Knight MRICS DipSurv