Title Page
-
Inspection title
Site Description:
-
Location
-
Contract:
-
Separable Portion:
-
Contractor:
- CON1291_Berketts Earthmovers
- CON1292_Fulton Hogan
- CON1293_HB Civil and Infrastructure
- CON1294_Higgins
- CON1295_Tupore
- CON1296_Tough Terrain
-
Separable Portion:
- SP1 - River Protection (Bridge 171 - Flaxmill Bridge)
- SP3 - River Protection (Bridge 173 -Wallingford Bridge)
- SP5 - Bridge 176 - (Saleyards Bridge)
-
Separable Portions:
- SP7 - Earth retaining structures (Rotohiwi RP8.337)
- SP9 - Earth retaining structures (Tourere RP3.52)
- SP11 - Earth retaining structures (Rangitoto RP4.187)
-
Separable Portions:
- SP6 - Earth retaining structures (Hautope RP6.12)
- SP8 - Earth retaining structures (Hautope RP1.27)
- SP10 - Earth retaining structures (Wimbledon RP12.94)
- SP12 - Earth retaining structures (Hiranui RP1.385)
-
Separable Portions:
- SP13 - Earth retaining structures (Old Hill RP5.94)
- SP16 - Earth retaining structures (School RP0.992)
-
Separable Portions:
- SP2 - River Protection (Bridge 281 - Porangahau Stream Bridge)
- SP4 - River Protection (Bridge 294 - Renalls Bridge)
- SP14 - Earth retaining structures (Te Apiti RP1.688)
-
Separable Portions:
- SP15 - Earth retaining structures (Wakarara RP28.86)
General details:
-
Inspection By
- Campbell Allan
- Dan Swinton
- Darryl Garton
- Grant Gunter
- Hamish Tarr
- Otto Harman
- Mark Wharekawa
- Sean Penprase
- Richard Taylor
- Terry Foley
- Stantec Other
- HDC Other
- Catherine Capio
- Rodrick Chand
- DJ Lamorena
- Ammu Raj
-
Accompanied By
- Campbell Allan
- Dan Swinton
- Darryl Garton
- Grant Gunter
- Hamish Tarr
- Otto Harman
- Mark Wharekawa
- Sean Penprase
- Richard Taylor
- Terry Foley
- Stantec Other
- HDC Other
- Catherine Capio
- Rodrick Chand
- DJ Lamorena
- Ammu Raj
-
Date and Time
-
Weather Conditions
- sunny
- cloudy
- raining
- windy
- Hot
- Cold
- High water/flooding
-
Detail water level in reference to known site reference (eg. bridge deck)
Site Documentation
-
Is the Site Specific Safety Plan available on site?
-
Are site safety inspections being carried out as per safety plan?
-
Is the current version of Contract Management Plan is on site?
-
Are all employees and (sub)contractor personnel on site completed Site-Specific Inductions?
-
Have Daily Pre-start check sheets been provided for plant including all subcontractor provided and hired plant?
-
Are Daily Pre-starts meetings occurring every day with Subcontractors attending Pre-start meetings and attendances recorded?
-
Have Safety issues raised at daily Pre-starts or toolbox meetings been noted and addressed?
-
Is an approved TMP in place, being reviewed & updated as required (i.e. Restricted Access, exclusion zones, traffic control)? Check plans, diary for entries to ensure personnel working in the vicinity of mobile plant & public vehicles are safe.
-
Is the Vehicle movement plan, including parking arrangements for plant / equipment, segregation of pedestrians effective
-
Is there a Site supervisor or Safety Representative adequate for project site? (include subcontractor supervision review)
-
Has documentation been signed and understood by those undertaking tasks?
-
Are all subcontractor works being undertaken under a SWMS/JSEA?
-
Have all subcontractor SWMS/JSEA been reviewed & signed off by HSE Manager
-
Are Underground / Overhead services plans available on site and clearly identified if present prior to work starting?
-
Have all NCR or corrective actions from prior internal or external audits been addressed?
Details:
-
Subcontractor on site
-
Plant on Site
- Excavator
- Truck
- Work Truck
- Crane
- Roller
- Water Cart
- Plate Compactor
- Grader
- Sheeps foot roller
- Excavator with breaker
Health and Safety
-
PPE review - are all personnel including subcontractors wearing the minimum and appropriate PPE for the job?
-
Are exclusion zones identified and being observed with spotters in place where required?
-
Lifting
-
Is there any heavy-lifting being commenced?
-
Is a Lift Plan/ Critical Lift Plan required for activities carried out?
-
Confined Spaces
-
Is there any work in Confined Spaces?
-
Is there a Confined Space Permit in place?
-
Has Worksafe been notified if Confined Space work requires use of BA?
-
Are all controls in place as per confined space permit requirements? (e.g. gas monitoring, Standby Rescue equipment & personnel etc.)
-
Hot Works
-
Is there any Hot Work being performed? (e.g. Welding / spark emitting from grinding)
-
Is there a potential or likely sources of ignition near flammable liquids, gas or any other hazardous atmosphere?
-
Is there a Hot Work Permit in place?
-
Are all controls in place as per Hot Work Permit requirements?
-
Working at Height
-
Are there activities involving Work at Height?
-
Is there a Working at Height permit in place?
-
Are all controls in place as per Work at Height permit requirements?
-
Traffic Management
-
Is there a TTM in place setup as per approved TMP and being managed by a qualified STMS relevant to road category?
-
Is the TTM site audit being completed regularly as per TMP requirements?
-
Emergency Preparedness
-
Is the Emergency Response Plan in place and understood by all staff/subcontractors on site and Emergency Assembly Areas have been identified?
-
Are emergency contact numbers available to personnel on site? (ICE in contacts of phone)
-
Are there stocked First Aid kits & a minimum of 1 certified first aider on site? (ensure that the kit supplies within "used by date")
-
Name of First Aider on Site
-
Are there Fire extinguishers on site, well signed and been serviced in the last 6 months? (include plant extinguishers)
-
Are spill kits required, available on site with instructions for use and operators trained in their use/application?
-
Are there MSDS sheets and register available on site?
-
Hazardous Substances
-
Are all Hazardous substances and dangerous goods clearly identified (labels) and correctly stored?
-
Small Tools & Equipment
-
Are all Electrical equipment tagged and tested (not expired)?
-
Are all electrical equipment being used with RCD
-
Are any Extension leads, cables, hoses, etc. set up appropriately e.g. laid out tidily on ground and free from potential damage or cause any harm?
-
Is Concrete Saw/Grinders being used on site and have been checked for safety prior to use (e.g. correct blades in good condition, safety guards in place, protective equipment worn)?
-
Health & Wellbeing
-
Is Health monitoring required - exposure to hazardous substances (e.g. asbestos, toxic gases, contaminated soils etc.), vibration, noise and being carried out?
-
Is the Site facilities appropriate - fresh drinking water, toilets, shade, extreme weather protection?
-
Are all staff on site fit for work physically and mentally?
Environmental
-
Is there an ESCP in place?
-
Are silt fences being maintained?
-
Do any exposed excavations require rapid stabilisation (i.e. geofabric cloth / hay mulch / stockpile sealed etc.) been attended prior to forecasted rain?
-
Is an SRP or DEB required and being maintained to be working effectively on site?
-
Are the site access stabilised with clean aggregate and/or are there any wheel wash available to mitigate dirt tracking on road?
-
Are there any special Environmental / Cultural / Archaeological Heritage considerations for this project?
-
Is there permit/consent available on site to allow for activities to be carried out following Environmental / Cultural / Archaeological considerations accounted for this project?
-
Have all site personnel been made aware of environmental restricted areas and controls?
-
Have appropriate material / waste / spoil stockpiles / disposal bins been identified, present & risk assessed?
-
Has plant refueling and servicing location been identified, prepared and bunded where required?
Quality Assurance
-
Description of testing type and location
-
Photos of testing and/or records
General Site Condition
-
Any variation to scope of works
-
Instructions Given
-
Is the Site layout effective & allow effective access & egress to site & work zones, Site office/depot setup?
-
Is Site signage appropriate - visible, accurate?
-
Are the Company policies, committee meeting minutes, emergency evacuation, etc. notices are posted in lunch/smoko room?
-
Is the site secured with site fencing to prevent access when unattended and/or security cameras in place to mitigate theft?
-
Are Incidents/near misses being reported - environmental (spills, emissions, noise complaints, impact on native vegetation or wildlife habitat), property damage or personnel injury?
-
General Observations
-
Photos
-
Further internal actions required
-
To be actioned by
-
Signature of person inspecting
-
Signature of supervisor on site