Title Page

  • Conducted on

  • Prepared by

  • Location

Work area/Location:

  • Time:

  • Edge protection

  • Exclusion zone signage

  • Washdown units in place

  • Spill bins in place

Traffic Management

  • Drainage

  • Dieback delineation

  • Mobile equipment park up area

  • JHA in place for specific task

  • Light vehicle / Heavy vehicle / Pedestrian separation

Red Alert Check List

  • To be completed on day red alert issued

  • Stockpile drainage

  • Low lying catchment area

  • Creek Crossing drainage

  • Sump entrances

  • Dieback control

  • Pit entry drainage established

  • Identified Hazards

Sign off and Notes

  • Signature:

  • General Notes/Comments:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.