Title Page
-
Conducted on
-
Prepared by
-
Location
Work area/Location:
-
Time:
-
Edge protection
-
Exclusion zone signage
-
Washdown units in place
-
Spill bins in place
Traffic Management
-
Drainage
-
Dieback delineation
-
Mobile equipment park up area
-
JHA in place for specific task
-
Light vehicle / Heavy vehicle / Pedestrian separation
Red Alert Check List
-
To be completed on day red alert issued
-
Stockpile drainage
-
Low lying catchment area
-
Creek Crossing drainage
-
Sump entrances
-
Dieback control
-
Pit entry drainage established
-
Identified Hazards
Sign off and Notes
-
Signature:
-
General Notes/Comments: