Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Outlet
TEMPERATURE
-
Chiller # 1 has correct temperature?
-
Chiller # 2 has correct temperature?
-
Chiller # 3 has correct temperature?
-
Chiller # 4 has correct temperature?
-
Freezer # 1 has correct temperature?
-
Freezer # 2 has correct temperature?
-
Correct Make line product temperature?
-
Correct Cook out temperature Product 1?
-
Correct Cook out temperature Product 2?
Dough management
-
Par cooked bases enough quantity for the next rush
-
Mention the quantities of par cooked bases for each size
-
Popitz enough for the lunch?
-
Par cooked bases size exact as per the screens (*all sizes images required)
-
Crammed crust enough for the lunch?
-
130 gm dough balls exact weight (photos)
-
200 gm dough balls exact weight (2 photos)
-
170 gm dough balls exact weight (2 photos)
-
Dough batch production done correctly?
PIC & others
-
Are all food items covered correctly ?
-
Vegetable washing followed
-
Are all the hand wash stations correctly stocked with Soap, sanitiser & towels and accesible
-
Are all the team members wearing the correct uniform
-
please provide photos for whoever in the shift
-
Rapid cooling followed
-
Supplier receiving checks done
-
Product preparation chart followed
-
All the products under shelf life?
-
Screens cleaned last night?
-
Medium screens
-
Large Screens
-
Small screens
-
RD screens
-
Drinks display fridge organized, stocked up and front faced
-
Ice cream freezer organized, stocked up and front faced
-
Last night cleaning equipments and tools cleaned after use (hanged up). Also make sure they are in good conditions.
-
take all mops photo
-
take all brooms photo
-
take mop bucket photo
-
Oven exterior and canopy cleaned last night?
-
Oven top
-
Canopy exterior
-
Canopy interior
-
Crumb tray 1
-
Crumb tray 2
-
Two thermometer available and caliberated (Every monday provide the caliberation photo)