Title Page

  • Inspection ID (FORM NUMBER GENERATES AUTOMATICALLY)

  • Project name

  • client

  • job number

  • Area Being Inspected (Please Add Area, Floor & Lift Number ) (E.g - Block A, GF, Subs or Block B, FF, 1st Lift). It is important to be clear on this so we can track them easily at a later date

  • Elevation/s

  • Conducted on

  • Prepared by

  • Location

Setting Out

  • The setting out dimensions have been completed as per the architechtural details?

  • Explanation for N/A?

  • Datum value has been cross checked with control points?

  • Explanation for N/A?

  • Masonry stengths have been cross checked with structural engineers details?

  • Explanation for N/A?

In Progress Checks

  • Mortar is correct mix? Please specify ratio in notes

  • Explanation for N/A?

  • Cavity fill completed as specified?

  • Explanation for N/A?

  • Gauging and bond are correct?

  • Explanation for N/A?

  • Cavity insulation correct type and size?

  • Explanation for N/A?

  • Cavity insulation is fixed correctly, close butted, clean and free from mortar?

  • Explanation for N/A?

  • Cavity width is as specified, cavity and ties are free from mortar and debris?

  • Explanation for N/A?

Structural

  • Movement control joints are formed, as designed?

  • Explanation for N/A?

  • Cavity ties are within specification, design and correct type?

  • Explanation for N/A?

  • Wall head restraints Installed as per detailed design?

  • Walls are tied in to cross walls or steel?

  • Wall ties are bedded at least 50mm into masonry leaves and are level or slope downwards to the outer leaf and drip point downwards /proprietary wall ties are laid the correct way up?

  • Explanation for N/A?

  • Wall ties are staggered in alternate courses and spaced in accordance with the design?

  • Explanation for N/A?

  • Extra ties are provided at jambs and reveals?

  • Explanation for N/A?

  • Extra ties are provided at openings, slab edges, movement joints and wall heads in accordance with the design?

  • Explanation for N/A?

  • Lintels, bedded correctly with 150mm minimum bearing?

  • Joint reinforcement (where applicable) is correct type?

  • Explanation for N/A?

  • Joint reinforcement bar are at least 20mm from external mortar face and at least 12mm from internal building faces?

  • Wind posts have been installed as per detailed design?

  • Masonry support angle has been torque tested and complies with the manufacturers installation instructions?

  • Designed overhang / embedment achieved on masonry support angle?

  • Explanation for N/A?

  • Padstones are installed as per the structral engineers specification?

Passive Fire Protection

  • Cavity barriers are installed as per the manufactures installation instructions?

  • Explanation for N/A?

  • Cavity barriers are installed to the fire strategies provided?

  • Explanation for N/A?

  • All cavity barriers have been accounted for as per the Chine FQA Schedule & photo evidence recorded?

  • Explanation for N/A?

  • Chine FQA checks are being completed and signed by the client?

  • Explanation for N/A?

DPC's/Cavity Trays

  • DPC's are within specification, design and correct type?

  • Explanation for N/A?

  • DPC is flush with face or projecting, laps at least 100mm and sealed?

  • Explanation for N/A?

  • Cavity trays are installed; over cavity bridges (e.g. over doors, window openings, ducts and horizontal cavity barriers), at roof abutments, to exclude soil gas eg. Radon methane etc. Jambs in cavity walls?

  • Explanation for N/A?

  • Cavity trays have stop ends?

  • Explanation for N/A?

  • Weep vents are installed as design?

  • Explanation for N/A?

Tolerances

  • Position in plan of any point in relation to the building reference line and/or point at the same level is within 10mm?

  • Explanation for N/A?

  • Straightness in any 5m length +/- 5mm?

  • Explanation for N/A?

  • Verticality up to 3m height +/- 10mm?

  • Explanation for N/A?

  • Verticality up to 7m height +/- 14mm?

  • Explanation for N/A?

  • Overall thickness of walls +/- 10m?

  • Explanation for N/A?

  • Level of bed joints up to 5m for brickwork +/- 11mm?

  • Explanation for N/A?

  • Level of bed joints up to 5m for blockwork +/- 13mm?

  • Explanation for N/A?

  • Window and Door openings within architects tollerances in specification?

  • Explanation for N/A?

Protection/Lift Complete

  • The masonry is correctly pointed and finished?

  • Pin holes/clamp holes filled in?

  • Explanation for N/A?

  • Panels are clean?

  • Impervious protection against rain and frost is provided?

  • Explanation for N/A?

  • Masonry is protected adjacent to scaffold boards?

  • Explanation for N/A?

  • Area is cleaned on completion of work?

  • Explanation for N/A?

QA Sign Off - Please Sign Within 72 Hours

  • Signed - Chine Brickwork

  • Client Name

  • Signed by

  • Signature

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.