Information
-
Project:
-
Store No.
-
Store Name:
-
Date completed:
CHIP & PIN SIGN OFF
ACTIVITIES:
-
Were all cables and the PSU in the pin pad box?
-
Was the C&P fitted using the screen and affixed to blanking plate with double sided tape and pushed onto bracket?
-
Has bracket been refitted and secured?
-
RJ45 connected to RJ11 C&P cable and connected into PC?
-
Adapter for power and route cable plugged into available power in kiosk?Power
-
Power live on C&P?
-
Firmware number?
-
Shroud fitted?
-
Health Check Run?
PHOTO SIGN OFF
-
Chip & PIN Device on and firmware number displayed:
-
Shroud Fitted:
VARIATIONS AND SNAGS:
-
If kiosk is NOT working please provide full details of the problem and confirm status of the kiosk:
-
ONSITE ESCALATION CONTACT: Steve Mack 07510 257272
STORE SIGN OFF
TO BE COMPLETED BY DUTY/NIGHT MANAGER:
-
The supplier/fitter was suitably dressed & polite, worked professionally at all times and did not cause any disruption to store.
-
COMMENT:
-
Disruption signage displayed on hoarding (if not applicable, mark as true)
-
COMMENT:
-
The supplier contacted the store to arrange a time and the fitter arrived at the agreed time.
-
COMMENT:
-
Is a revisit required?
-
COMMENT:
-
RAG Status:
-
COMMENT:
-
Store Manager's NAME/SIGNATURE:
-
Engineer's NAME/SIGNATURE:
-
Once this sign off is complete, take a picture of this document, score card and send along with photo of install to Kiosk@isg-technology.com