Information
-
Campus Site
- North Shore Campus
- Mt Wellington Campus
- Balclutha Campus
- Invercargill Campus
- Queenstown Campus
- Off-Site
Hazard Register
-
Add a Hazard
Hazard
-
Date hazard was identified/reported.
-
Name of person who reported the hazard.
-
Area
- Sanctuary
- Bathrooms
- Kids Church
- Childcare
- Cafe
- School
- Kitchen
- Office
- Grounds
- Other
-
Type of Hazard
-
Hazard Catagories
- Slip Hazard
- Electrical Hazard
- Soil Erosion
- Exposed Earthworks
- Heights
- Vehicle Traffic
- Pedestrian Traffic
- Confined Spaces
- Other
-
Include a photograph if possible
-
Likely Severity Of Injury Should An Incident Occur
- Fatality
- Serious Injury
- Minor Injury
- First Aid Only
- No Injury
- Near Miss
- Damage Equipment
-
Risk Matrix
-
Select Overall Risk Rating
-
No further action required. Please take care and continue.
-
Select Type Of Control Measure
- Eliminate
- Substitute
- Administrative
- PPE
- Isolate Power
- Shut Off Mains
- Set Up Barricade
- Use a Harness
- Divert Traffic
- Hard Hat
- Eye Protection
- Gloves
- Work Method Statement
- Spotter
- Other
-
Provide details of how Control Measures will be implemented.
-
Please refer to Codes of Practice
https://onedrive.com -
Include an image of control measures if possible.
-
Sign off and email after completion