Title Page

  • Client

  • Site Name

  • Site ID

  • Location
  • Inspection Start

External Checks

  • Confirm sub-station matches detail design

  • Confirm transformer enclosure GRP is free from damage

  • Confirm GRP enclosure is installed as per manufacturers instructions with Arbomast sealant between GRP base and foundation

  • Confirm warning labels and iDNO contact numbers are present on GRP

LV Pillar Foundation

NAL / LV Pillar Foundation

  • Verify location matches approved design

  • Verify foundation is level & Installed as per manufacturers instructions

Ducting between LV Pillar and EV Charger

  • Sized as indicated on drawing - (Please add drawing ref No. in notes section)

  • Number of ducts installed as indicated on drawing - (Please add drawing ref No. in notes section)

  • Ducts are routed as per drawing - (Please add drawing ref No. in notes section)

  • Ducts are installed at correct depth as per design - (Please add drawing ref No. in notes section)

Fibre optic and earthing cable ducts installed between LV Pillar & Building are

  • Sized as indicated on drawing - (Please add drawing ref No. in notes section)

  • Ducts are routed as per drawing - Please add drawing ref No. in notes section)

  • Ducts are installed at correct depth as per drawing - (Please ass drawing ref No. in notes section)

LV Pillar Installation

  • LV Pillar is appropriately placed and fixed down in 4 fixed points

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.