Title Page
-
Client
- BP Pulse
- Amazon
- RAW Charging
- Tesla
- Leap 24
- Jet
-
Site Name
-
Site ID
-
Location
-
Inspection Start
External Checks
-
Confirm sub-station matches detail design
-
Confirm transformer enclosure GRP is free from damage
-
Confirm GRP enclosure is installed as per manufacturers instructions with Arbomast sealant between GRP base and foundation
-
Confirm warning labels and iDNO contact numbers are present on GRP
LV Pillar Foundation
NAL / LV Pillar Foundation
-
Verify location matches approved design
-
Verify foundation is level & Installed as per manufacturers instructions
Ducting between LV Pillar and EV Charger
-
Sized as indicated on drawing - (Please add drawing ref No. in notes section)
-
Number of ducts installed as indicated on drawing - (Please add drawing ref No. in notes section)
-
Ducts are routed as per drawing - (Please add drawing ref No. in notes section)
-
Ducts are installed at correct depth as per design - (Please add drawing ref No. in notes section)
Fibre optic and earthing cable ducts installed between LV Pillar & Building are
-
Sized as indicated on drawing - (Please add drawing ref No. in notes section)
-
Ducts are routed as per drawing - Please add drawing ref No. in notes section)
-
Ducts are installed at correct depth as per drawing - (Please ass drawing ref No. in notes section)
LV Pillar Installation
-
LV Pillar is appropriately placed and fixed down in 4 fixed points